If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20534 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.901011,"lon":-75.575186,"icon":""}]} |
County: Susquehanna | |
Municipality: Jackson Township | |
Operator Name: SOUTHWESTERN ENERGY PROD CO | |
Well Pad ID: 147281 | |
Farm/Lease Name: SHELDON 1V | |
First Permit Date: 2011-03-29 | |
Last Permit Date: 2012-04-25 | |
Spud Date: 2011-06-14 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 1 | |
Latitude: 41.901011 | |
Longitude: -75.575186 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1981204 | 2011-06-14 | No Violations Noted | ||
1990200 | 2011-07-15 | No Violations Noted | ||
1991584 | 2011-07-25 | No Violations Noted | Falcon 23. Currently circulating hole clean. Will be setting plug later tonight. Seperior on site to cement. Setting cement plugs at 6250 to 6800', and 5650 to 6200'. Operator informed DEP they will be installing monitors offsite on a complainants propert to monitor ground vibrations. DEP will be kept up to date on monitoring results. Rig expected to be mobilized off site later this week. | |
2023865 | 2011-11-22 | Violation(s) Noted | Failure to submit completion report w/in 30 days of completion. | 626038 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILLING FLUID WASTE | 24.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-2 | DRILL CUTTINGS | 1248.3 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |