X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-29732

Well Details

Well ID: 37-005-29732
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2008-03-10
Last Permit Date: 2008-03-10
Spud Date: 2008-09-05
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.851959
Longitude: -79.458137

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 3645.0 324.0 0.0 0.0 0.0 0.0
2012-0 4412.0 333.0 0.0 0.0 0.0 0.0
2011-0 3531.0 334.0 0.0 0.0 0.0 0.0
2010-0 5760.0 365.0 0.0 0.0 0.0 0.0
2009-0 6176.0 332.0 0.0 0.0 0.0 0.0
2008-0 1097.0 58.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 22.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2008-0 BRINE 300.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT HART RESOURCE TECH PLT
2009-0 BRINE 45.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT HART RESOURCE TECH PLT
2010-0 PRODUCED FLUID 35.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2011-0 PRODUCED FLUID 35.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 PRODUCED FLUID 22.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1734559 2008-09-09 No Violations Noted Spudded 9/8/08. Rig drilling @ inspection. Pit/freeboard/E&S controls Ok.
1803707 2009-06-08 No Violations Noted drilling complete, tank ok, equipped for production, veg started graded & mulched
1976818 2011-05-31 No Violations Noted Drilling was completed on 09/11/08. Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Observed no accelerated erosion or sedimentation with respect to the access road or well-site. Vegetative cover met the 70% uniform coverage criteria.

References