X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-22171

Well Details

Well ID: 37-015-22171
Loading map...
County: Bradford
Municipality: Wilmot Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148654
Farm/Lease Name: KATHRYN BRA 5H OG WELL
First Permit Date: 2012-04-03
Last Permit Date: 2012-04-03
Spud Date: 2012-04-19
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.626869
Longitude: -76.251211

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2061102 2012-04-19 No Violations Noted United drilling, Keith Williams on site.

@ 60' , going to 75', hole is dry. 20 - 50' red shale 50 - gray shale

2062179 2012-04-25 No Violations Noted Preoperational Inspection.
2064992 2012-05-03 No Violations Noted NOMAC 42, Comp. Man - Tommy Thompson

Still rigging up. Probably start drilling in morning, tomorrow. Need to patch holes in plastic and get berms built.

2067000 2012-05-10 No Violations Noted NOMAC 42, Comp. Man - Tommy Thompson

United 0 - 75' Dry hole. 671' and 701' 260 units gas 20" @ 75' w/ 210 sx Cl A, 3 bbls returns 4/20/12 planned on setting surf at 900' but hit gas so drilled to 888' and set plug up to 552'w/ 407 sx, Cl H, 15.6 ppg WOC 6 hr and drilled out to shut off gas. 13 3/8" @ 657' w/ 750 sx Cl H, 15.6 ppg w/ 54 bbls returns of 15.5 ppg Will set 9 5/8" @ 2200', prob be Sat. Morn, 6 AM BOP test 5/9/2012 - good Checked cellar - no bubbles. Clean up under csg - small amount of oil from cleaning .


2084426 2012-07-11 No Violations Noted No bubbles in cellar. 2 vent pipes - 5 1/2 x 9 5/8" annulus with press guage = 0 psi, and 9 5/8 x 13 3/8" annulus is vented - 0 comb gas and methane reading on Altair MSA gas meter.

2 empty cellars on site.

2109971 2012-10-17 No Violations Noted Recieved stim. notice 10/16/2012. Comp. Man = Cort Parsons

PumpCo on stage 4 of 7. Will be here tomorrow yet. Using about 30 to 40% brine. Pressure + 8500 psi and rate = 85 BPM Didn't walk around site, actively fracing

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 675.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-1 DRILLING FLUID WASTE 2598.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING

References