37-033-26739

Well Details

Well ID: 37-033-26739
Loading map...
Operator Name: CNX GAS CO LLC
First Permit Date: 2008-08-15
Last Permit Date: 2008-08-15
Spud Date: 2009-05-26
Unconventional: No
Horizontal: No
Violations: None
Latitude: 41.053805
Longitude: -78.728165

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 119.24 365.0 0.0 0.0 0.0 0.0
2012-0 207.0 366.0 0.0 0.0 0.0 0.0
2011-0 1085.0 365.0 0.0 0.0 0.0 0.0
2010-0 2375.0 365.0 0.0 0.0 0.0 0.0
2009-0 1783.42 365.0 0.0 0.0 0.0 0.0
2008-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 117.0 Bbl INJECTION DISPOSAL WELL 34-155-23584 KOONTZ #1 DISPOSAL WELL WARREN OH
2009-0 DRILLING 900.0 Bbl OTHER DOMINION EXP. & PROD. - WPA15794
2009-0 BRINE 876.0 Bbl INJECTION DISPOSAL WELL DOMINION TRANSMISSION DISPOSAL-BIG RUN
2009-0 DRILLING 900.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT HART RESOURCE TECH PLT
2009-0 FRACKING FLUID 1800.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT HART RESOURCE TECH PLT
2009-0 BRINE 876.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT JOHNSTOWN STP
2009-0 BRINE 876.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA BRINE TRT - JOSEPHINE PLT -INDIANA CO
2009-0 FRACKING FLUID 1800.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA BRINE TRT - JOSEPHINE PLT -INDIANA CO
2009-0 BRINE 876.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2009-0 DRILLING 900.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2009-0 FRACKING FLUID 1800.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2010-0 PRODUCED FLUID 359.38 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428 DAN-BROC LLC PA
2010-0 PRODUCED FLUID 175.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101656 DOMINION TRANS DIV 5 WASTE WATER TREATMENT PLANT PITTSBURGH PA
2010-0 PRODUCED FLUID 90.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034 JOHNSTOWN SEWAGE TREATMENT PLANT JOHNSTOWN PA
2010-0 PRODUCED FLUID 178.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2010-0 PRODUCED FLUID 162.55 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA
2010-0 PRODUCED FLUID 80.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2011-0 PRODUCED FLUID 160.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428 BROCKWAY TREATMENT PLANT BROCKWAY PA
2011-0 PRODUCED FLUID 90.0 Bbl INJECTION DISPOSAL WELL 34-155-23584 KOONTZ #1 DISPOSAL WELL WARREN OH
2011-0 PRODUCED FLUID 177.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127 NORTH STAR BRINE DISPOSAL YOUNGSTOWN OH
2011-0 PRODUCED FLUID 80.85 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA
2012-0 PRODUCED FLUID 117.0 Bbl INJECTION DISPOSAL WELL 34-155-23584 KOONTZ #1 DISPOSAL WELL WARREN OH

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1811249 2009-06-28 No Violations Noted Well is drilled and site set up for production. Brine tank is surrounded by and earthen dike about 2 ft high. Tank is sound with no visible leaks. There appears to be a small amount of gas bubbling up around well head. Well was completed recently and site is being restored. Pit has been mostly backfilled, cut slope still exists, equipment for restoration is on site. Well site ID sign and E&S plan are in place. All BMPs are installed properly and being maintained. There are no E&S problems at this time. Well is identified by large sticker on brine tank.
1813213 2009-07-16 No Violations Noted The following items were noted during the inspection:

-No activity in process. -Drilling complete, tubing installed. -Brine tank dike installed. -Well in production, site reclaimed, vegetation ~10%. -Site sign and E & S plan were on site. -E&S BMPs were in place and working adequately.