If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0365030606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.062649,"lon":-114.421138,"icon":""}]} |
| Location: 00/06-06-036-03W5/0 | |
| Location Alias: 00/06-06-36-03 W5M | |
| Location Alias 2: 00/06-06-036-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 06 | |
| County/Municipality: Red Deer County | |
| Well Name: HUDSON'S BAY RAVEN RIVER 6-6-36-3 | |
| Operator Name: BP Canada Energy Group ULC | |
| License Number: 0014337 | |
| License Date: 1957-11-28 | |
| License Status: RecExempt | |
| Spud Date: 1957-12-07 | |
| Final Drill Date: 1958-02-12 | |
| Well Total Depth: 3011.70 m | |
| Surface Hole Latitude: 52.062649 | |
| Surface Hole Longitude: -114.421138 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1957-11-28 | Obtained License |
| 1958-02-12 | Finished Drilling |
| 1958-02-12 | Lost Circulation Occurred |
| 1958-02-19 | Liner Casing Operation Performed |
| 1958-02-23 | Drill Stem Test Performed |
| 1958-02-25 | Drill Stem Test Performed |
| 1958-02-26 | Drill Stem Test Performed |
| 1958-03-03 | Perforation Treatment Performed - Bullet Perforation |
| 1958-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1958-03-06 | Perforation Treatment Performed - Cement Squeeze |
| 1958-03-13 | Drill Stem Test Performed |
| 1958-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1958-03-13 | Perforation Treatment Performed - Jet Perforation |
| 1958-03-21 | Perforation Treatment Performed - Cement Squeeze |
| 1958-03-22 | Perforation Treatment Performed - Bullet Perforation |
| 1958-03-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1958-03-24 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1958-03-27 | Perforation Treatment Performed - Bullet Perforation |
| 1958-03-27 | Perforation Treatment Performed - Cement Squeeze |
| 1958-03-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1958-03-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1958-05-18 | Perforation Treatment Performed - Cement Squeeze |
| 1958-05-18 | Perforation Treatment Performed - Jet Perforation |
| 1958-05-21 | Perforation Treatment Performed - Jet Perforation |
| 1958-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1958-05-29 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1958-08-28 | Well Mode changed to Drilled and Cased |
| 1960-12-20 | Perforation Treatment Performed - Cement Plug |
| 1960-12-24 | Well Abandoned |
| 1960-12-24 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1958-03-03 | Bullet Perforation | 3005.90 | 3006.50 | 13 |
| 1958-03-27 | Cement Squeeze | 2996.20 | 2997.40 | 0 |
| 1958-03-27 | Bullet Perforation | 2982.80 | 2988.60 | 13 |
| 1958-03-28 | Acid Wash | 2982.80 | 2988.60 | 0 |
| 1958-03-28 | Acid Treatment | 2982.80 | 2988.60 | 0 |
| 1958-05-18 | Perforation | 2992.80 | 2993.40 | 13 |
| 1958-05-18 | Cement Squeeze | 2982.80 | 2993.40 | 0 |
| 1958-05-21 | Perforation | 2982.50 | 2988.60 | 13 |
| 1958-05-29 | Acid Wash | 2982.50 | 2988.60 | 0 |
| 1958-05-29 | Acid Treatment | 2982.50 | 2988.60 | 0 |
| 1960-12-20 | Cement Plug | 2944.40 | 2990.10 | 0 |
| 1958-03-05 | Acid Treatment | 3005.90 | 3006.50 | 0 |
| 1958-03-06 | Cement Squeeze | 3005.90 | 3006.50 | 0 |
| 1958-03-13 | Perforation | 3001.10 | 3002.90 | 13 |
| 1958-03-13 | Acid Treatment | 3001.10 | 3002.90 | 0 |
| 1958-03-21 | Cement Squeeze | 3001.10 | 3002.90 | 0 |
| 1958-03-22 | Bullet Perforation | 2996.20 | 2997.40 | 13 |
| 1958-03-24 | Acid Wash | 2996.20 | 2997.40 | 0 |
| 1958-03-24 | Acid Treatment | 2996.20 | 2997.40 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1958-02-12 | Lost Circulation | 3011.70 | 3011.70 |
For data sources see[5]