If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394151905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.366275,"lon":-112.158272,"icon":""}]} |
| Location: 00/05-19-039-15W4/0 | |
| Location Alias: 00/05-19-39-15 W4M | |
| Location Alias 2: 00/05-19-039-15 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 15 | |
| Section: 19 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: JORDAN RED WILLOW 5-19-39-15 | |
| Operator Name: TAQA North Ltd. | |
| License Number: 0075894 | |
| License Date: 1979-05-25 | |
| License Status: RecCertified | |
| Spud Date: 1979-05-30 | |
| Final Drill Date: 1979-06-06 | |
| Well Total Depth: 1150.00 m | |
| Surface Hole Latitude: 52.366275 | |
| Surface Hole Longitude: -112.158272 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-05-25 | Obtained License |
| 1979-06-04 | Drill Stem Test Performed |
| 1979-06-06 | Finished Drilling |
| 1979-06-06 | Well Log Performed |
| 1979-06-08 | Drill Stem Test Performed |
| 1979-06-09 | Production Casing Operation Performed |
| 1979-06-22 | Perforation Treatment Performed - Jet Perforation |
| 1979-06-27 | Well Mode changed to Drilled and Cased |
| 1979-09-14 | Well Began Production |
| 1979-09-14 | Well Fluid changed to Gas |
| 1979-09-14 | Well Mode changed to Flowing |
| 1979-12-02 | Perforation Treatment Performed - Jet Perforation |
| 1981-03-04 | Perforation Treatment Performed - Fractured |
| 1984-03-31 | Well Fluid changed to Gas |
| 1984-03-31 | Well Mode changed to Suspended |
| 1986-07-14 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 1986-07-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-07-15 | Perforation Treatment Performed - Jet Perforation |
| 1986-09-07 | Well Fluid changed to Gas |
| 1986-09-07 | Well Mode changed to Flowing |
| 1987-07-01 | Well Fluid changed to Gas |
| 1987-07-01 | Well Mode changed to Suspended |
| 1989-09-01 | Well Fluid changed to Gas |
| 1989-09-01 | Well Mode changed to Flowing |
| 1989-11-22 | Perforation Treatment Performed - Jet Perforation |
| 1989-11-22 | Well Fluid changed to Gas |
| 1989-11-22 | Well Mode changed to Flowing |
| 1993-11-01 | Well Fluid changed to Gas |
| 1993-11-01 | Well Mode changed to Suspended |
| 1996-05-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-05-28 | Perforation Treatment Performed - Jet Perforation |
| 1996-05-28 | Perforation Treatment Performed - Remedial Casing |
| 1996-05-28 | Plug Back Performed |
| 1996-05-28 | Well Log Performed |
| 1996-05-29 | Perforation Treatment Performed - Jet Perforation |
| 1996-05-29 | Perforation Treatment Performed - Remedial Casing |
| 1996-06-07 | Well Abandoned |
| 1996-06-07 | Well Fluid changed to Gas |
| 1996-06-07 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-06-22 | Perforation | 1117.00 | 1118.50 | 13 |
| 1996-05-28 | Packing Device Capped w/Cement | 937.00 | 945.00 | 0 |
| 1996-05-28 | Perforation | 438.00 | 439.00 | 13 |
| 1996-05-28 | Remedial Casing Cementing | 438.00 | 439.00 | 0 |
| 1996-05-29 | Perforation | 320.00 | 321.00 | 13 |
| 1996-05-29 | Remedial Casing Cementing | 320.00 | 321.00 | 0 |
| 1979-12-02 | Perforation | 1111.50 | 1112.50 | 6 |
| 1979-12-02 | Perforation | 1113.50 | 1114.50 | 6 |
| 1981-03-04 | Fracture | 1111.50 | 1118.50 | 0 |
| 1986-07-14 | Bridge Plug, No Cement | 1116.00 | 1116.00 | 0 |
| 1986-07-15 | Perforation | 949.00 | 956.00 | 13 |
| 1986-07-15 | Acid Treatment | 949.00 | 1114.50 | 0 |
| 1989-11-22 | Perforation | 958.50 | 960.50 | 14 |
| 1996-05-28 | Packing Device Capped w/Cement | 1100.00 | 1108.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1979 | 2083 | 0.0 | 0.0 | 0.0 |
| 1980 | 7588 | 0.0 | 0.0 | 0.0 |
| 1981 | 7431 | 0.0 | 0.0 | 0.0 |
| 1982 | 8424 | 0.0 | 0.0 | 0.0 |
| 1983 | 4111 | 0.0 | 0.0 | 0.0 |
| 1984 | 1425 | 0.0 | 0.0 | 0.0 |
| 1986 | 2274 | 0.0 | 0.0 | 0.0 |
| 1987 | 3068 | 0.0 | 0.0 | 0.0 |
| 1989 | 2701 | 0.0 | 0.0 | 0.0 |
| 1990 | 7725 | 0.0 | 0.0 | 0.0 |
For data sources see[5]