X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405082806000

Well Details

Well ID: 0405082806000
Loading map...
Location: 00/06-28-040-08W5/0
Location Alias: 00/06-28-40-08 W5M
Location Alias 2: 00/06-28-040-08 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 08
Section: 28
County/Municipality: Clearwater County
Well Name: 403508 FERRIER 6-28-40-8
Operator Name: Artisan Energy Corporation
License Number: 0083666
License Date: 1980-06-23
License Status: Abandoned
Spud Date: 1980-07-05
Final Drill Date: 1980-07-20
Well Total Depth: 2145.00 m
Surface Hole Latitude: 52.469549
Surface Hole Longitude: -115.096980

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-06 Lost Circulation Occurred
1980-06-23 Obtained License
1980-07-20 Finished Drilling
1980-07-20 Well Mode changed to Drilled and Cased
1980-07-21 Drill Stem Test Performed
1980-07-21 Well Log Performed
1980-07-22 Drill Stem Test Performed
1980-07-24 Drill Stem Test Performed
1980-07-26 Production Casing Operation Performed
1980-09-30 Well Began Production
1980-09-30 Well Fluid changed to Crude Oil
1980-09-30 Well Mode changed to Flowing
1980-10-21 Perforation Treatment Performed - Jet Perforation
1980-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-24 Perforation Treatment Performed - Fractured
1981-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-30 Perforation Treatment Performed - Jet Perforation
1981-10-02 Perforation Treatment Performed - Fractured
1982-01-31 Well Fluid changed to Crude Oil
1982-01-31 Well Mode changed to Flowing
1982-04-29 Perforation Treatment Performed - Cement Squeeze
1982-04-29 Plug Back Performed
1982-05-04 Perforation Treatment Performed - Jet Perforation
1982-05-07 Perforation Treatment Performed - Fractured
1982-07-29 Perforation Treatment Performed - Cement Squeeze
1982-07-29 Plug Back Performed
1982-08-02 Perforation Treatment Performed - Jet Perforation
1982-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-26 Perforation Treatment Performed - Fractured
1984-11-09 Perforation Treatment Performed - Cement Squeeze
1984-11-09 Well Fluid changed to Crude Oil
1984-11-09 Well Mode changed to Pumping
1984-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-16 Perforation Treatment Performed - Jet Perforation
1984-11-16 Well Log Performed
1984-11-18 Perforation Treatment Performed - Fractured
1986-03-31 Well Fluid changed to Crude Oil
1986-03-31 Well Mode changed to Suspended
1987-06-24 Well Fluid changed to Crude Oil
1987-06-24 Well Mode changed to Flowing
1989-05-31 Well Fluid changed to Crude Oil
1989-05-31 Well Mode changed to Suspended
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Flowing
2001-08-27 Well Fluid changed to Crude Oil
2001-08-27 Well Mode changed to Pumping
2003-02-25 Well Fluid changed to Crude Oil
2003-02-25 Well Mode changed to Closed
2005-09-07 Well Fluid changed to Crude Oil
2005-09-07 Well Mode changed to Pumping
2011-11-01 Well Fluid changed to Crude Oil
2011-11-01 Well Mode changed to Suspended
2019-07-13 Well Log Performed
2019-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-14 Perforation Treatment Performed - Cement Squeeze
2019-07-14 Plug Back Performed
2019-07-14 Well Fluid changed to Crude Oil
2019-07-14 Well Mode changed to Abandoned Zone
2019-07-15 Perforation Treatment Performed - Abrasa-Jet Perforation
2019-07-15 Perforation Treatment Performed - Cement Plug
2019-07-15 Plug Back Performed
2019-08-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-21 Perforation 2127.00 2130.00 7
1982-07-29 Cement Squeeze 1709.50 1712.00 0
1982-08-02 Perforation 1648.00 1651.00 13
1982-08-02 Perforation 1653.00 1655.50 13
1982-08-03 Acid Treatment 1648.00 1655.50 0
1982-08-26 Fracture 1648.00 1655.50 0
1984-11-09 Cement Squeeze 1648.00 1655.50 0
1984-11-13 Acid Treatment 2127.00 2130.00 0
1984-11-16 Perforation 2126.80 2129.80 13
1984-11-18 Fracture 2126.80 2130.00 0
2019-07-14 Cement Squeeze 2127.00 2130.00 0
1980-10-22 Acid Treatment 2127.00 2130.00 0
2019-07-14 Packing Device Capped w/Cement 2072.00 2117.00 0
2019-07-14 Packing Device Capped w/Cement 1630.00 1638.00 0
2019-07-15 Hydra Jet Perforation 376.00 376.20 0
2019-07-15 Hydra Jet Perforation 329.00 329.20 0
2019-07-15 Hydra Jet Perforation 284.00 284.20 0
2019-07-15 Cement Plug 235.00 395.00 0
1980-10-24 Fracture 2127.00 2130.00 0
1981-09-30 Perforation 1714.00 1718.00 7
1981-09-30 Acid Treatment 1714.00 1718.00 0
1981-10-02 Fracture 1714.00 1718.00 0
1982-04-29 Cement Squeeze 1714.00 1718.00 0
1982-05-04 Perforation 1709.50 1712.00 7
1982-05-07 Fracture 1709.50 1712.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 582 0.0 0.0 0.0
1981 1342 0.0 0.0 0.0
1982 436 0.0 0.0 0.0
1983 1271 0.0 0.0 0.0
1984 718 0.0 0.0 0.0
1985 6178 0.0 0.0 0.0
1986 714 0.0 0.0 0.0
1987 2370 0.0 0.0 0.0
1988 6690 0.0 0.0 0.0
1989 48 0.0 0.0 0.0
1994 303 0.0 0.0 0.0
1995 180 0.0 0.0 0.0
2000 6108 0.0 0.0 0.0
2001 8397 0.0 0.0 0.0
2002 8277 0.0 0.0 0.0
2003 1353 0.0 0.0 0.0
2005 2230 0.0 0.0 0.0
2006 3955 0.0 0.0 0.0
2008 1170 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-06-06 Lost Circulation 67.00 70.00
2019-07-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References