If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22871 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.1,"lon":-81.57,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: PACE-PRICE | |
License Status: Producing | |
License Date: 1997-10-28 | |
Spud Date: 1997-11-18 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1997-11-25 | |
Well Total Depth: 4513.00 ft | |
Configuration: Directional | |
Latitude: 41.100000 | |
Longitude: -81.570000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1997-10-28 | Proposed Formations:CLINTON, Issued Date:10/28/97, Expired Date:10/28/98 6:00:00 AM, Drilling unit acres:37.82, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 1997-11-18 | RBDMS Rec |
Completed | 1997-11-25 | RBDMS Rec |
Reached Total Depth | 1997-11-25 | RBDMS Rec |
Completion Report Received | 1998-01-02 | RBDMS Rec |
Construction Permit Expires | 1998-10-28 | RBDMS Rec |
Correction to Well | 1999-02-22 | CORRECTIONIN TARGET LOCATION: 15,173'SL & 6266'WL OF TWP (IN LOT 10). CORECTION IN COORDINATES: X = 2,257,591, Y = 524,873. DRILL UNIT: 37.99AC |
Record Last Modified | 2015-09-24 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1998-03-06 | 4234 | 4288 | 63 |
4234 | 4288 | 63 | |
4234 | 4288 | 63 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2877 Bbl | 80000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | EVERFLOW EASTERN PARTNERS LP | 17469.00 | 570.00 | 365 |
1999 | EVERFLOW EASTERN PARTNERS LP | 17098.00 | 1170.00 | 365 |
2000 | EVERFLOW EASTERN PARTNERS LP | 15562.00 | 1205.00 | 365 |
2001 | EVERFLOW EASTERN PARTNERS LP | 11574.00 | 971.00 | 365 |
2002 | EVERFLOW EASTERN PARTNERS LP | 6964.00 | 614.00 | 365 |
2003 | EVERFLOW EASTERN PARTNERS LP | 5039.00 | 484.00 | 365 |
2004 | EVERFLOW EASTERN PARTNERS LP | 5061.00 | 624.00 | 365 |
2005 | EVERFLOW EASTERN PARTNERS LP | 4333.00 | 492.00 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | 3729.00 | 581.00 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | 3536.00 | 462.00 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | 3054.00 | 449.00 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | 3467.00 | 359.00 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | 3272.00 | 376.00 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | 3162.00 | 343.00 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | 2120.00 | 102.00 | 306 |
2013 | EVERFLOW EASTERN PARTNERS LP | 1486.00 | 0.00 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | 1599.00 | 97.00 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | 1117.00 | 90.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 1238.00 | 187.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 2131.00 | 201.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 2274.00 | 202.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-117086212 | 2011-11-30 0:00 | PW | No Violations | |
0117086212 | 2011-11-30 | Production Wells | No Violations | The Uniontown office received a call from Rev. John Isaiah (330-836-2209 or 330-571-9264) at 1541 Parkgate Drive in Akron reporting a suspected brine release at the Pace-Price 2-D tank battery or the adjoining Pace Price 1 tank battery operated by Enervest. The inspection found that the tank battery area was under water and one of the tanks was labeled as brine. The low range Quantab detected no chlorides in the standing water. It appears that the standing water is from rainfall and runoff and not from a leaking tank. This information was given to Rev. Isaiah. I also spoke to George Strawn with Everflow about raising the tank battery and constructing an appropriate containment dike. |
1629793650 | 2017-11-27 | UrbanProduction Wells | No Violations | The Pace-Price # 2-D well was completed to operate as a plunger lift well. Visible surface well construction was 1.5 tubing inside of 4.5 production casing. A riser pipe with a two (2) inch ball valve was connected to the 8.625 annular space. I did not see any flow from the riser. A locked chain link fence and earthen dike surrounded the wellhead. I D signage was posted and legible. I did not see any leaks at the wellhead. The tank battery consisted of one (1) 100 barrel stock tank, one (1) 50 barrel steel brine tank and one (1) 2410 horizontal separator. The tank battery was secured with a locked chain link fence. An earthen dike also surrounded the perimeter of the tank battery. The load lines were locked and plugged. I D signage was posted and legible. The gas chart reflected the current production period and showed production cycles. No violations were identified. |
iDIAN00217 | 1999-09-29 | Preliminary Restoration | No Violations | |
iDIAN002174 | 1999-9-29 0:00: | PL | No Violations |
For data sources see[9]