If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-157-25514 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.21,"lon":-81.39,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Guernsey | |
| Municipality: Washington Township | |
| Operator Name: EAP OHIO LLC | |
| Well Pad ID: US-OH-000836 | |
| Farm/Lease Name: PARKER 23-5-1 | |
| License Status: Producing | |
| License Date: 2014-10-22 | |
| Spud Date: 2014-01-11 | |
| Spud Drilling Contractor: NOMAC DRILLING CORP | |
| Final Drill Date: 2015-01-26 | |
| Well Total Depth: 13262.00 ft | |
| Configuration: Horizontal | |
| Latitude: 40.210000 | |
| Longitude: -81.390000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-10-22 | Proposed Formations:POINT PLEASANT, Issued Date:10/22/2014, Expired Date:10/21/2016 12:00:00 PM, Drilling unit acres:435.51, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Reached Total Depth | 2015-01-26 | |
| Correction to Well | 2015-05-08 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
| Completion Report Received | 2016-01-08 | |
| Construction Permit Expires | 2016-10-21 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2015-08-17 | 8481 | 13133 | 500 |
| 8481 | 13133 | 500 | |
| 8481 | 13133 | 500 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 03/11/2015 | 03/21/2015 | 7160 | 45528 | 2,438,420.0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Northern White Sand | GASFRAC ENERGY SERVICES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 16.4755 | 0 |
| GEL LP-10 | GASFRAC ENERGY SERVICES | Gelling Agent | Phosphoric Acid | 007664-38-2 | 5 | 0.02495 | 0 | |
| Mixed alkyl phosphate ester | TRADE SECRET | 95 | 0.47407 | 0 | ||||
| ACTIVATOR XL-105 | GASFRAC ENERGY SERVICES | Activator | Ferric Sulfate | 010028-22-5 | 45 | 0.30453 | 0 | |
| 2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) | 000111-76-2 | 15 | 0.10151 | 0 | ||||
| Coconut oil, Diethanolamide | 068603-42-9 | 5 | 0.03384 | 0 | ||||
| Alkyl Imidazoline | 061790-69-0 | 15 | 0.10151 | 0 | ||||
| OilSafe AR (Acid Replacement) | HEARTLAND SOLUTIONS | Acid | Patented Synthetic Acid | TRADE SECRET | 100 | 0.60602 | 0 | |
| ACTIVATOR XL-105, BRKLP-10 | GASFRAC ENERGY SERVICES | Activator, Breaker | Non-MSDS Components Not Provided by Supplier | NOT PROVIDED | 0 | 0 | 0 | |
| Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 1.74405 | 0 | |
| Mixed Butanes | GASFRAC ENERGY SERVICES | Carrier/Base Fluid | Mixed Butanes | 068513-65-5 | 100 | 79.5447 | 0 | |
| BRKLP-10 | GASFRAC ENERGY SERVICES | Breaker | Straight Run Middle Petroleum Distillate | 064741-44-2 | 60 | 0.08624 | 0 | |
| Decane | 000124-18-5 | 3 | 0.00431 | 0 | ||||
| Hexanes | 000110-54-3 | 3 | 0.00431 | 0 | ||||
| C-11 to C-14 n-alkanes | 000112-40-3 | 5 | 0.00719 | 0 | ||||
| C-11 to C-14 n-alkanes | 000629-50-5 | 5 | 0.00719 | 0 | ||||
| Hexadecane | 000544-76-3 | 15 | 0.02156 | 0 | ||||
| C-11 to C-14 n-alkanes | 001120-21-4 | 3 | 0.00431 | 0 | ||||
| HCL ACID | PRODUCERS SERVICE CORP | Acid | Hydrochloric Acid | 007647-01-0 | 15 | 0.04654 | 0 | |
| Water | 007732-18-5 | 85 | 0.26375 | 0 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-03-21 | H2O | 8 | 2053 Bbl | 182760 | STAGE 20/20
25 SHOTS | |
| 2015-03-11 | H2O | 8 | 3754 Bbl | 184020 | STAGE 1/20
25 SHOTS STAGES 2-19 SEE IMAGES GAS FRAC INC. |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | CHESAPEAKE EXPLORATION LLC | 106275 | 20409 | 167 |
| 2016 | CHESAPEAKE EXPLORATION LLC | 29902 | 3885 | 43 |
| 2017 | CHESAPEAKE EXPLORATION LLC | 44338 | 6227 | 133 |
| 2018 | CHESAPEAKE EXPLORATION LLC | 61250 | 3832 | 305 |
| 2019 | CHESAPEAKE EXPLORATION LLC | 13939 | 1316 | 74 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | CHESAPEAKE EXPLORATION LLC | Brine | 322 | 167 |
| 2016 | CHESAPEAKE EXPLORATION LLC | Brine | 20 | 43 |
| 2017 | CHESAPEAKE EXPLORATION LLC | Brine | 0 | 133 |
| 2018 | CHESAPEAKE EXPLORATION LLC | Brine | 0 | 305 |
| 2019 | CHESAPEAKE EXPLORATION LLC | Brine | 4 | 74 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0672708173 | 2015-01-13 | Casing String Witnessed | No Violations | On arrival on location I found the installing 13 3/8 inch casing at a depth of, 875 feet. Schlumberger will cement. Established circulation and had good cement returns to surface. At 95 bbls of displacement we lost circulation. Circulation was not re-established. We found the cement top at 50 feet. Will shut down for 2 hours and the grout back to surface. |
| 1125131723 | 2015-06-18 | Preliminary Restoration | No Violations | On the day of my inspection I found that the 1 H well was in production and the well 3-H was not. Both wells have been completed and put into production but due to the outlet pipeline size, only 1 well can be produced at a time. There are three propane stock tanks, three 400 bbl produced water tanks, four 400 bbl condensate tanks, that are in containment. All are properly labeled. Vegetation is well established around the well pad. The area is fenced in and secured. The site passed preliminary restoration according to ORC 1509.072 (A). |
| 1415648096 | 2014-11-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Rocky Mountain Drilling preparing to drill a 26 inch diameter hole to install a 20 inch conductor pipe for Chesapeake. The tin horn is installed, and are ready to start drilling the conductor hole. |
| 1421072585 | 2015-01-12 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found the crew rigging up, and preparing to start spudding. Met with company man to check scheduling for surface casing. |
| 1761382651 | 2020-2-6 0:00:0 | PW | No Violations | 0.70 |
| 672708173 | 2015-1-13 0:00: | CS | No Violations |
For data sources see[10]