Well Details

Well ID: 37-033-26796
Loading map...
Operator Name: SHELLY OIL & GAS INC
First Permit Date: 2009-03-13
Last Permit Date: 2009-03-13
Spud Date: 2009-06-15
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.998392
Longitude: -78.742799

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 499.0 275.0 0.0 0.0 0.0 0.0
2012-0 797.0 365.0 0.0 0.0 0.0 0.0
2011-0 2013.0 365.0 0.0 0.0 0.0 0.0
2010-0 1368.0 184.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 50.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2010-0 PRODUCED FLUID 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2011-0 PRODUCED FLUID 40.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 PRODUCED FLUID 50.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2013-0 PRODUCED FLUID 30.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1813205 2009-07-16 No Violations Noted The following items were noted during the inspection:

-No activity in process. Met with Mr. Kris Suhadolnik, Field Manager. -Drilling complete, tubing installed. -Site sign and E & S plan were on site. -E&S BMPs were in place and working adequately. -Frac pit w/ liner met regulatory standards, 6¿ of water in bottom. -State Policeman on site responding to vandalism ¿ gun shots thru dozer cab windows.

1772924 2009-02-27 No Violations Noted Well site staked. Site not constructed.

Request for waiver of distance requirements from Laural Branch Run. The following revisions were received for this waiver request:

 1)  E&S plan revised to include additional BMP's to minimize the potential for E&S issues at the site.  Filter fence backed by hay bales to 
      be installed along entire down-slope portion of site and access road.
 2)  Tophole water is to be taken to an approved treatment facility.  Tophole water can not be discharged on site due to site conditions.
 3)  Additional soil information submitted which indicated a need to change the method used for disposing of drill cuttings.  Disposal 
     method changed to land application.  Operator referred to 78.63 for guidance on this.  The above concerns were discussed on site with operator representative Kris Suhadolnik.  Also addressed some possible wetland areas on site that must not be disturbed, and was assured that they would not be by Mr. Suholdonik.  With the above revisions, the proposed plan should protect the stream.
2155129 2013-04-10 Clearfield Brady Twp No Violations Noted

References