X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-20887"

m
m
Line 239: Line 239:
  
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Wells]]

Revision as of 22:12, 28 June 2014

Well Details

Well ID: 37-051-20887
Loading map...
Operator Name: ALLIANCE PETROLEUM CORP
First Permit Date: 1998-04-23
Last Permit Date: 1998-04-23
Spud Date: 1800-01-01
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.048768
Longitude: -79.686396

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 3818.59 365.0 0.0 0.0 0.01 365.0
2010-0 2192.0 365.0 0.0 0.0 0.0 0.0
2009-0 2093.0 365.0 0.0 0.0 0.0 0.0
2007-0 2719.0 365.0 0.0 0.0 0.0 0.0
2006-0 3519.0 365.0 0.0 0.0 0.0 0.0
2005-0 3603.0 365.0 0.0 0.0 0.0 0.0
2004-0 3972.0 365.0 0.0 0.0 0.0 0.0
2003-0 3933.0 365.0 0.0 0.0 0.0 0.0
2002-0 9244.0 365.0 0.0 0.0 0.0 0.0
2001-0 5162.0 365.0 0.0 0.0 0.0 0.0
2000-0 4003.0 337.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2000-0 BRINE 95.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT FBTC
2002-0 BRINE 160.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT FRANKLIN BRINE -- FRANKLIN PLT
2011-0 PRODUCED FLUID 75.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
382854 1997-07-11 No Violations Noted DRILLING COMPLETED
384389 1998-02-20 Violation(s) Noted ROAD UNSTABLE 111157
384539 1998-03-06 No Violations Noted MEETING
385449 1998-08-20 No Violations Noted E&S ADEQUATE
386023 1998-10-30 No Violations Noted E&S ADEQUATE
386601 1999-01-06 No Violations Noted E&S ADEQUATE
1162279 2002-08-22 No Violations Noted Upgrade access to highest Owads well needs some crowning, ditching and/or diversion waterbars across to maintain access. Steep rush of stormwater downgrade is having its effect.

References