X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-20711"

m
m
Line 235: Line 235:
  
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Wells]]

Revision as of 09:37, 29 June 2014

Well Details

Well ID: 37-117-20711
Loading map...
County: Tioga
Municipality: Chatham Township
Operator Name: SWEPI LP
Well Pad ID: 148842
Farm/Lease Name: MATZ 824 3H
First Permit Date: 2010-05-20
Last Permit Date: 2010-05-20
Spud Date: 2010-07-11
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.897361
Longitude: -77.368116

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2009258 2011-10-07 No Violations Noted
2106986 2012-10-11 No Violations Noted An inspection of the Matz 824 was conducted on October 11, 2012 in response to a Notice of Termination and six Well Site Restoration Reports received by the Department.

Several erosion control issues were noted during this inspection. Sediment is accumulation in the rock-lined ditch at the left side of the entrance to the pad. The north side of the cut slope to the east of the pad does not meet the requirements of 25 Pa Code §102.22(a)(2) (i) Permanent Stabilization. A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was not observed. These areas must be stabilized. The rock-lined ditches and two sediment traps (ST2 and ST-3) remain on site. These structures must be identified in the Post Construction Stormwater Management Plan along with any maintenance requirements. The above items must be addressed prior to the approval of the Notice of Termination or Well Restoration Reports. - MRN

2108351 2012-10-11 No Violations Noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 59786.18 184.0 0.0 0.0 0.0 0.0
2012-1 74881.1 182.0 0.0 0.0 0.0 0.0
2011-2 82904.34 150.0 0.0 0.0 0.0 0.0
2011-1 29897.0 61.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 FRACING FLUID WASTE 480.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-2 PRODUCED FLUID 33.33 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-2 FRACING FLUID WASTE 68.9 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY - BLOSSBURG BLOSSBURG PA
2012-2 PRODUCED FLUID 64.6 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY - BLOSSBURG BLOSSBURG PA
2012-2 FRACING FLUID WASTE 1953.56 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 168.52 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 FRACING FLUID WASTE 248.46 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2011-1 FRACING FLUID WASTE 8449.86 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 4335.15 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING

References