X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "42-285-33384"

m
 
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 42-285-33384
 
| Well ID: 42-285-33384
| style="height=100%; align=center" rowspan="14" | {{#display_map: [[Lavaca County, Texas|Lavaca]] County, Texas | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="9" | {{#display_map: 29.188551, -96.953616 | width=100% | height=100% }}
Map displayed above is an approximation of the well location based on well county.
 
 
|-
 
|-
| County: [[Lavaca County, Texas|Lavaca]]
+
| Country: United States
 
|-
 
|-
| District: 02
+
| State: Texas
 +
|-
 +
| County: [[Lavaca County,_Texas|Lavaca County]]
 +
|-
 +
| Operator Name: [[SUNCOAST TECHNICAL SERVICES INC]]
 
|-
 
|-
 
| Well Type: Gas
 
| Well Type: Gas
 
|-
 
|-
| Well Number:   1
+
| Lease Number: 245428
 +
|-
 +
| Latitude: 29.188551
 +
|-
 +
| Longitude: -96.953616
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = RRC Digital Map Data
 +
|publisher = Railrod Commission of Texas
 +
| date = 2020-10-15
 +
| url = https://wellwiki.org/wiki/Texas_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-10-15 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2007-04-11
 +
| Application Received
 +
|-
 +
| 2007-04-16
 +
| Permit Issued
 +
|-
 +
| 2007-07-16
 +
| Spudding Begins
 +
|-
 +
| 2007-07-22
 +
| Surface Cased
 +
|-
 +
| 2007-10-29
 +
| Well Status: FINAL-COMPLETION
 +
|-
 +
| 2008-11-20
 +
| Application Received
 +
|-
 +
| 2009-01-07
 +
| Permit Amended
 +
|-
 +
| 2009-01-16
 +
| Application Received
 +
|-
 +
| 2009-01-22
 +
| Permit Issued
 +
|-
 +
| 2009-01-23
 +
| Spudding Begins
 +
|-
 +
| 2009-01-28
 +
| Well Status: FINAL-COMPLETION
 +
|-
 +
| 2009-04-16
 +
| Permit Expired
 +
|-
 +
| 2011-01-05
 +
| Application Received
 +
|-
 +
| 2011-01-10
 +
| Permit Issued
 +
|-
 +
| 2011-01-22
 +
| Permit Expired
 
|-
 
|-
| Lease Number: 245914
+
| 2013-01-10
 +
| Permit Expired
 
|-
 
|-
| Wellbore Shutin Date:
+
| 2018-04-27
 +
| Spudding Begins
 
|-
 
|-
| Well Shutin Date:  
+
| 2018-04-28
 +
| Well Status: FINAL-COMPLETION
 
|-
 
|-
| Subject to Rule 14(B)(2): No
+
| 2018-05-22
 +
| Application Received
 
|-
 
|-
| 14(B)(2) Status: Not subject for extension
+
| 2019-03-14
 +
| Permit Issued
 
|-
 
|-
| Location: Land
+
| 2021-03-14
 +
| Permit Expired
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = RRC Oil and Gas Production Data
+
  | title = RRC Drilling Permit Data
|publisher = [http://www.rrc.state.tx.us/about-us/resource-center/research/data-sets-available-for-purchase/production-data/]
+
|publisher = Railrod Commission of Texas
| date = 2014-12-04
+
| date = 2020-10-15
  | url = http://wellwiki.org/wiki/Texas_Oil_and_Gas_Data_Sources#Well
+
  | url = https://wellwiki.org/wiki/Texas_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-24 }}</ref>
+
  | accessdate = 2020-10-15 }}</ref>
== Well Production Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
  !scope="col" | Year
 
  !scope="col" | Year
!scope="col" | Month
 
 
  !scope="col" | Oil Volume (BBL)
 
  !scope="col" | Oil Volume (BBL)
 
  !scope="col" | Gas Volume (MCF)
 
  !scope="col" | Gas Volume (MCF)
 
  !scope="col" | Condensate Volume (BBL)
 
  !scope="col" | Condensate Volume (BBL)
 
  !scope="col" | Casing Head Gas Volume (MCF)
 
  !scope="col" | Casing Head Gas Volume (MCF)
!scope="col" | Lease Name
 
 
  !scope="col" | Operator Name
 
  !scope="col" | Operator Name
!scope="col" | Field Name
 
   
 
 
|-  
 
|-  
    | 2009
+
| 2007
    | 01
+
| 8302
    | 0
+
| 0
    | 634
+
| 0
    | 0
+
| 0
    | 0
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | GOODRICH-POINDEXTER UNIT
+
|-
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
| 2008
    | HOPE (MIOCENE 2730)
+
| 45149
    |-   
+
| 0
|-
+
| 0
    | 2009
+
| 0
    | 02
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | 0
+
|-
    | 4779
+
| 2009
    | 0
+
| 56809
    | 0
+
| 0
    | GOODRICH-POINDEXTER UNIT
+
| 0
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
| 0
    | HOPE (MIOCENE 2730)
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    |-   
+
|-
|-
+
| 2010
    | 2009
+
| 35509
    | 03
+
| 0
    | 0
+
| 0
    | 5393
+
| 0
    | 0
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | 0
+
|-
    | GOODRICH-POINDEXTER UNIT
+
| 2011
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
| 52054
    | HOPE (MIOCENE 2730)
+
| 0
    |-   
+
| 0
|-
+
| 0
    | 2009
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | 04
+
|-
    | 0
+
| 2012
    | 5077
+
| 54110
    | 0
+
| 0
    | 0
+
| 0
    | GOODRICH-POINDEXTER UNIT
+
| 0
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | HOPE (MIOCENE 2730)
+
|-
    |-   
+
| 2013
|-
+
| 54781
    | 2009
+
| 0
    | 05
+
| 0
    | 0
+
| 0
    | 4878
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | 0
+
|-
    | 0
+
| 2014
    | GOODRICH-POINDEXTER UNIT
+
| 52411
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
| 0
    | HOPE (MIOCENE 2730)
+
| 0
    |-  
+
| 0
|-
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | 2009
+
|-
    | 06
+
| 2015
    | 0
+
| 46017
    | 4706
+
| 0
    | 0
+
| 0
    | 0
+
| 0
    | GOODRICH-POINDEXTER UNIT
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
|-
    | HOPE (MIOCENE 2730)
+
| 2016
    |-   
+
| 14784
|-  
+
| 0
    | 2009
+
| 0
    | 07
+
| 0
    | 0
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
    | 5316
+
|-
    | 0
+
| 2017
    | 0
+
| 4819
    | GOODRICH-POINDEXTER UNIT
+
| 0
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
| 0
    | HOPE (MIOCENE 2730)
+
| 0
    |-  
+
| [[SUNCOAST TECHNICAL SERVICES INC]]
|-
+
|-
    | 2009
+
| 2018
    | 08
+
| 24316
    | 0
+
| 0
    | 5364
+
| 0
    | 0
+
| 0
    | 0
+
| [[HYDROCARBON OPERATING, INC.]]
    | GOODRICH-POINDEXTER UNIT
+
|-
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
| 2019
    | HOPE (MIOCENE 2730)
+
| 31061
    |-   
+
| 0
|-
+
| 0
    | 2009
+
| 0
    | 09
+
| [[HYDROCARBON OPERATING, INC.]]
    | 0
+
|-
    | 4809
+
| 2020
    | 0
+
| 19420
    | 0
+
| 0
    | GOODRICH-POINDEXTER UNIT
+
| 0
    | [[SUNCOAST TECHNICAL SERVICES INC]]
+
| 0
    | HOPE (MIOCENE 2730)
+
| [[HYDROCARBON OPERATING, INC.]]
    |-   
+
|-
|-
 
    | 2009
 
    | 10
 
    | 0
 
    | 5023
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2009
 
    | 11
 
    | 0
 
    | 5001
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2009
 
    | 12
 
    | 0
 
    | 5829
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 01
 
    | 0
 
    | 4662
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 02
 
    | 0
 
    | 4795
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 03
 
    | 0
 
    | 5297
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 04
 
    | 0
 
    | 5293
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 05
 
    | 0
 
    | 5590
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 06
 
    | 0
 
    | 3358
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 07
 
    | 0
 
    | 1821
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 08
 
    | 0
 
    | 1130
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 09
 
    | 0
 
    | 1132
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 10
 
    | 0
 
    | 1074
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 11
 
    | 0
 
    | 692
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2010
 
    | 12
 
    | 0
 
    | 665
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 01
 
    | 0
 
    | 2524
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 02
 
    | 0
 
    | 3825
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 03
 
    | 0
 
    | 4219
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 04
 
    | 0
 
    | 4652
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 05
 
    | 0
 
    | 4935
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 06
 
    | 0
 
    | 4571
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 07
 
    | 0
 
    | 4810
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 08
 
    | 0
 
    | 4594
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 09
 
    | 0
 
    | 3892
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 10
 
    | 0
 
    | 4605
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2011
 
    | 11
 
    | 0
 
    | 4733
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-  
 
    | 2011
 
    | 12
 
    | 0
 
    | 4694
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 01
 
    | 0
 
    | 4673
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 02
 
    | 0
 
    | 4286
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 03
 
    | 0
 
    | 4218
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 04
 
    | 0
 
    | 4569
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 05
 
    | 0
 
    | 4393
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2012
 
    | 06
 
    | 0
 
    | 4807
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2012
 
    | 07
 
    | 0
 
    | 4758
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 08
 
    | 0
 
    | 4398
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 09
 
    | 0
 
    | 4346
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 10
 
    | 0
 
    | 4801
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 11
 
    | 0
 
    | 4353
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2012
 
    | 12
 
    | 0
 
    | 4508
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 01
 
    | 0
 
    | 4754
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2013
 
    | 02
 
    | 0
 
    | 3936
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 03
 
    | 0
 
    | 4974
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 04
 
    | 0
 
    | 4652
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 05
 
    | 0
 
    | 4713
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 06
 
    | 0
 
    | 4526
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 07
 
    | 0
 
    | 4523
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 08
 
    | 0
 
    | 4363
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 09
 
    | 0
 
    | 4421
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 10
 
    | 0
 
    | 5022
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 11
 
    | 0
 
    | 4350
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2013
 
    | 12
 
    | 0
 
    | 4547
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2014
 
    | 01
 
    | 0
 
    | 4714
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2014
 
    | 02
 
    | 0
 
    | 4095
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2014
 
    | 03
 
    | 0
 
    | 4811
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2014
 
    | 04
 
    | 0
 
    | 4708
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2014
 
    | 05
 
    | 0
 
    | 4880
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2014
 
    | 06
 
    | 0
 
    | 4627
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2014
 
    | 07
 
    | 0
 
    | 4436
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-  
 
|-
 
    | 2014
 
    | 08
 
    | 0
 
    | 4381
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2014
 
    | 09
 
    | 0
 
    | 3625
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2014
 
    | 10
 
    | 0
 
    | 3735
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2014
 
    | 11
 
    | 0
 
    | 4314
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2014
 
    | 12
 
    | 0
 
    | 0
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2015
 
    | 01
 
    | 0
 
    | 0
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-   
 
|-
 
    | 2015
 
    | 02
 
    | 0
 
    | 0
 
    | 0
 
    | 0
 
    | GOODRICH-POINDEXTER UNIT
 
    | [[SUNCOAST TECHNICAL SERVICES INC]]
 
    | HOPE (MIOCENE 2730)
 
    |-
 
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = RRC Oil and Gas Production Data
+
  | title = RRC Production Data
|publisher = [http://www.rrc.state.tx.us/about-us/resource-center/research/data-sets-available-for-purchase/production-data/]
+
|publisher = Railrod Commission of Texas
| date = 2014-12-04
+
| date = 2020-10-15
  | url = http://wellwiki.org/wiki/Texas_Oil_and_Gas_Data_Sources#Well_Production
+
  | url = https://wellwiki.org/wiki/Texas_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-24 }}</ref>
+
  | accessdate = 2020-10-15 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Texas Wells]]

Latest revision as of 03:01, 20 December 2020

Well Details

Well ID: 42-285-33384
Loading map...
Country: United States
State: Texas
County: Lavaca County
Operator Name: SUNCOAST TECHNICAL SERVICES INC
Well Type: Gas
Lease Number: 245428
Latitude: 29.188551
Longitude: -96.953616

For data sources see[1]

Well History

Date Event
2007-04-11 Application Received
2007-04-16 Permit Issued
2007-07-16 Spudding Begins
2007-07-22 Surface Cased
2007-10-29 Well Status: FINAL-COMPLETION
2008-11-20 Application Received
2009-01-07 Permit Amended
2009-01-16 Application Received
2009-01-22 Permit Issued
2009-01-23 Spudding Begins
2009-01-28 Well Status: FINAL-COMPLETION
2009-04-16 Permit Expired
2011-01-05 Application Received
2011-01-10 Permit Issued
2011-01-22 Permit Expired
2013-01-10 Permit Expired
2018-04-27 Spudding Begins
2018-04-28 Well Status: FINAL-COMPLETION
2018-05-22 Application Received
2019-03-14 Permit Issued
2021-03-14 Permit Expired

For data sources see[2]

Production Data

Year Oil Volume (BBL) Gas Volume (MCF) Condensate Volume (BBL) Casing Head Gas Volume (MCF) Operator Name
2007 8302 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2008 45149 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2009 56809 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2010 35509 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2011 52054 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2012 54110 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2013 54781 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2014 52411 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2015 46017 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2016 14784 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2017 4819 0 0 0 SUNCOAST TECHNICAL SERVICES INC
2018 24316 0 0 0 HYDROCARBON OPERATING, INC.
2019 31061 0 0 0 HYDROCARBON OPERATING, INC.
2020 19420 0 0 0 HYDROCARBON OPERATING, INC.

For data sources see[3]

References

  1. "RRC Digital Map Data". Railrod Commission of Texas. 2020-10-15. Retrieved 2020-10-15. 
  2. "RRC Drilling Permit Data". Railrod Commission of Texas. 2020-10-15. Retrieved 2020-10-15. 
  3. "RRC Production Data". Railrod Commission of Texas. 2020-10-15. Retrieved 2020-10-15.