X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-029-21719"

m
m
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-029-21719
 
| Well ID: 34-029-21719
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.75058989, -80.86437278 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.75, -80.86 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Columbiana County, Ohio|Columbiana]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Columbiana_County,_Ohio|Columbiana]]
 +
|-
 +
| Municipality: [[Hanover_Township,_Columbiana_County,_Ohio|Hanover Township]]
 
|-
 
|-
 
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:  
+
| Well Pad ID: [[US-OH-000934]]
 +
|-
 +
| Farm/Lease Name: TREBILCOCK 25-15-4
 +
|-
 +
| License Status: Plugged Back
 +
|-
 +
| License Date: 2012-03-05
 +
|-
 +
| Spud Date: 2012-04-07
 +
|-
 +
| Spud Drilling Contractor: [[NOMAC DRILLING CORP]]
 +
|-
 +
| Final Drill Date: 2012-04-22
 +
|-
 +
| Well Total Depth: 8155.00 ft
 +
|-
 +
| Configuration: Vertical
 
|-
 
|-
| Farm/Lease Name:  
+
| Latitude: 40.750000
 +
|-
 +
| Longitude: -80.860000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
| First Permit Date:  
+
| APP
 +
| 2012-03-05
 +
| Proposed Formations:TRENTON-BLACK RIVER, Issued Date:3/5/2012, Expired Date:3/5/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
 
|-
 
|-
| Last Permit Date:
+
| Reached Total Depth
 +
| 2012-04-22
 +
|
 
|-
 
|-
| Spud Date: 2012-04-22
+
| Completion Report Received
 +
| 2012-07-03
 +
|
 
|-
 
|-
| Unconventional:
+
| Construction Permit Expires
 +
| 2014-03-05
 +
|
 
|-
 
|-
| Configuration:
+
| Record Last Modified
 +
| 2015-09-24
 +
|
 
|-
 
|-
| Well Status: Producing
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Violations: 0
+
| 2014-06-04
 +
| style="text-align: right;" | 8151
 +
| style="text-align: right;" | 14035
 +
| style="text-align: right;" | 352
 
|-
 
|-
| Latitude: 40.75058989
+
|  
 +
| style="text-align: right;" | 8151
 +
| style="text-align: right;" | 14035
 +
| style="text-align: right;" | 352
 
|-
 
|-
| Longitude: -80.86437278
+
|  
 +
| style="text-align: right;" | 8151
 +
| style="text-align: right;" | 14035
 +
| style="text-align: right;" | 352
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Job Number
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Job Start Date
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Job End Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| True Vertical Depth (ft)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Total Water Volume (gal)
!scope="col" | OIL QUANTITY
+
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
!scope="col" | OIL PRODUCTION DAYS
+
|-
 +
| 1
 +
| 06/18/2012
 +
| 06/18/2012
 +
| style="text-align: right;" | 8095.00
 +
| style="text-align: right;" | 3,637,326.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="41"| 1
 +
| rowspan="1"| FERROTROL 300L
 +
| rowspan="1"| Baker Hughes
 +
| rowspan="1"| Iron Control Agent
 +
| Citric acid
 +
| 77-92-9
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00224000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Additional Ingredients Not Listed on MSDS
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| SCALETROL 720
 +
| rowspan="2"| Baker Hughes
 +
| rowspan="2"| Scale Inhibitor
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 35.00
 +
| style="text-align: right;" | 0.00480000
 +
| style="text-align: right;" |
 +
|-
 +
| Diethylene glycol
 +
| 111-46-6
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00069000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| BF-9L
 +
| rowspan="1"| Baker Hughes
 +
| rowspan="1"| pH Adjusting Agent
 +
| Potassium hydroxide
 +
| 1310-58-3
 +
| style="text-align: right;" | 15.00
 +
| style="text-align: right;" | 0.00216000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Ottawa Sand
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 +
| Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 13.96
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="5"| ALPHA 1427
 +
| rowspan="5"| Baker Hughes
 +
| rowspan="5"| Antibacterial Agent
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.00772000
 +
| style="text-align: right;" |
 +
|-
 +
| Ethanol
 +
| 64-17-5
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00064000
 +
| style="text-align: right;" |
 +
|-
 +
| Quaternary ammonium compounds,
 +
benzyl-C12-16-alkyldimethyl, chlorides
 +
| 68424-85-1
 +
| style="text-align: right;" | 7.00
 +
| style="text-align: right;" | 0.00090000
 +
| style="text-align: right;" |
 +
|-
 +
| Glutaraldehyde
 +
| 111-30-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00386000
 +
| style="text-align: right;" |
 +
|-
 +
| Didecyl dimethyl ammonium chloride
 +
| 7173-51-5
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00129000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ENZYME G-NE
 +
| rowspan="1"| Baker Hughes
 +
| rowspan="1"| Breaker
 +
| No Hazardous Components
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 100 Mesh Sand
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 +
| Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 2.03
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Recycled Produced Water
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 4.24
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| ClayCare
 +
| rowspan="2"| Baker Hughes
 +
| rowspan="2"| Clay Stabilizer
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 +
|-
 +
| Choline chloride
 +
| 67-48-1
 +
| style="text-align: right;" | 75.00
 +
| style="text-align: right;" | 0.05
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| GBW-15L
 +
| rowspan="1"| Baker Hughes
 +
| rowspan="1"| Breaker
 +
| Sodium chloride
 +
| 7647-14-5
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.00988000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Hydrochloric Acid 10.1-15
 +
| rowspan="2"| Baker Hughes
 +
| rowspan="2"| Acid
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15.00
 +
| style="text-align: right;" | 0.12
 +
| style="text-align: right;" |
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 85.00
 +
| style="text-align: right;" | 0.68
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Fresh Water
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 78.58
 +
| style="text-align: right;" |  
 
|-
 
|-
| 2014-3
+
|- valign="top"
| style="text-align:right;" | 144758.0
+
| rowspan="2"| GW-3LDF
| style="text-align:right;" | 92.0
+
| rowspan="2"| Baker Hughes
 +
| rowspan="2"| Gelling Agent
 +
| Petroleum Distillate Blend
 
|  
 
|  
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.08
 +
| style="text-align: right;" |
 +
|-
 +
| Polysaccharide Blend
 
|  
 
|  
| style="text-align:right;" | 311.0
+
| style="text-align: right;" | 60.00
| style="text-align:right;" | 92.0
+
| style="text-align: right;" | 0.08
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="14"| BF-9L, CI-14, ENZYME G-NE, FERROTROL
 +
300L, FRW-18, GBW-15L, GW-3LDF, SCALETROL 720
 +
| rowspan="14"| Baker Hughes
 +
| rowspan="14"| Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent, Scale Inhibitor
 +
| Proprietary Acid
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2014-1
+
| Proprietary Silica
| style="text-align:right;" | 53033.0
 
| style="text-align:right;" | 26.0
 
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Proprietary Weak Acid
 
|  
 
|  
| style="text-align:right;" | 1133.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 26.0
+
| style="text-align: right;" |  
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Proprietary Enzyme
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2014-4
+
| Proprietary Disinfectant
| style="text-align:right;" | 106040.0
 
| style="text-align:right;" | 92.0
 
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Proprietary Alcohol
 
|  
 
|  
| style="text-align:right;" | 395.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 92.0
+
| style="text-align: right;" |  
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Calcium chloride
 +
| 10043-52-4
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2014-2
+
| Proprietary Copolymer
| style="text-align:right;" | 198949.0
 
| style="text-align:right;" | 88.0
 
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Proprietary Solvent
 
|  
 
|  
| style="text-align:right;" | 1750.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 88.0
+
| style="text-align: right;" |  
 +
| style="text-align: right;" |
 +
|-
 +
| Hemicellulase Enzyme Concentrate
 +
| 9025-56-3
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Proprietary Biocide
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2015-1
+
| Proprietary Surfactant
| style="text-align:right;" | 85055.0
 
| style="text-align:right;" | 90.0
 
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Proprietary Polymer
 
|  
 
|  
| style="text-align:right;" | 527.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 90.0
+
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| XLW-32
 +
| rowspan="2"| Baker Hughes
 +
| rowspan="2"| Crosslinker
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 90.00
 +
| style="text-align: right;" | 0.00864000
 +
| style="text-align: right;" |
 +
|-
 +
| Boric acid
 +
| 10043-35-3
 +
| style="text-align: right;" | 20.00
 +
| style="text-align: right;" | 0.00192000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| CI-14
 +
| rowspan="2"| Baker Hughes
 +
| rowspan="2"| Corrosion Inhibitor
 +
| Propargyl alcohol
 +
| 107-19-7
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00007000
 +
| style="text-align: right;" |
 +
|-
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 68.00
 +
| style="text-align: right;" | 0.00089000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| FRW-18
 +
| rowspan="1"| Baker Hughes
 +
| rowspan="1"| Friction Reducer
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = FracFocus Fracking Chemicals Database
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
| date = 2019-04-02
  | date = 2015-06-19
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-06-20 }}</ref>
+
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 8641
 +
| style="text-align: right;" | 298
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 3605
 +
| style="text-align: right;" | 307
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 2877
 +
| style="text-align: right;" | 366
 +
|-
 +
| 2017
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 1220
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 183
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2019
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 37
 +
| style="text-align: right;" | 90
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2020-11-16
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
| 920249222
+
| -1105687375
 +
| 2017-9-20 0:00:
 +
| PW
 +
| No Violations
 +
| 0.70
 +
|-
 +
| 0110012870
 +
| 2015-10-08
 +
| Preliminary Restoration
 +
| No Violations
 +
-lined and sealed secondary containment.  There are concrete barriers protecting the containment from vehicles.  There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters.  There is a truck grounding area for trucks collecting condensate and/or produced water.  Along the interior of the chain link fence there is a site drain installed.  The soil stockpile is well stabilized with vegetation.  Drainage and erosion controls at the pad are in place and functioning.  A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure.  Preliminary restoration is complete and approved.
 +
|-
 +
| 0920249222
 
| 2014-10-24
 
| 2014-10-24
 +
| Preliminary Restoration
 +
| No Violations
 +
-lined and sealed secondary containment.  There are concrete barriers protecting the containment from vehicles.  There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters.  There is a truck grounding area for trucks collecting condensate and/or produced water.  Along the interior of the chain link fence there is a site drain installed.  The soil stockpile is well stabilized with vegetation.  Drainage and erosion controls at the pad are in place and functioning.  A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure.  Preliminary restoration is complete and approved.
 +
|-
 +
| 110012870
 +
| 2015-10-8 0:00:
 +
| PL
 +
| No Violations
 
|  
 
|  
| I was on site to assess the completion of preliminary restoration.  The pad is shared between #21719 (Trebilcock #1H) and #21728 (Trebilcock #8H).There is a sign board at the access road entry featuring the well name, permit number and emergency contact information. Identification is also posted at the wellhead and tank battery. The access road has a padlocked gate near Laughlin Mill RoadThe access road is in good repair, and drainage and erosion controls are in placeGround cover is well established along the access roadI found the production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gateThe fence is in good repair.  The pad has a crushed limestone surface, and is in good repair.  The well is constructed with a  
+
|-
|  
+
| 1105687375
|  
+
| 2017-09-20
 +
| Production Wells
 +
| No Violations
 +
| The purpose of my inspection was to conduct a status check on well #2-1719-01.  The lease road and well pad remained in good repair.  A locked chain link fence was constructed around the facility.  No signs of vandalism were present.  A stable earthen berm was present outside of the fenced perimeter.  Correct identification was present.  The well cellar contained fresh water near free board.  No leaks were detected.  The 9.625 annular pressure gauge indicated 0 psi.  The 5.5 annular pressure gauge indicated 0 psi.  The well was flowing during the inspection.  The 5.5 production casing was equipped with a plunger lift assembly.  Production equipment on the pad consisted of (1) sand knockout and GPU specific to well #1719-01.  Common equipment shared with well #2-1728 included (1) hydrate inhibitor tank, one (1) meter run, one (1) coalescing tower, three  (3) 400 bbl produced water tanks and three (3) condensate tanks inside steel containment and one (1) VRU. The containment was lined with an impervious liner and was holding fresh water.  No violations were observed during this inspection.
 +
|-
 +
| 1917624884
 +
| 2016-11-28
 +
| Production Wells
 +
| No Violations
 +
| The purpose of my inspection was to conduct a status check on well # 2--established vegetation.  A sign board is posted at the entrance and contains correct owner and well identification and emergency response information. A chain link security fence with barbed wire top is constructed around the well pad. The entrance gate and escape doors are locked to prevent unauthorized entryAn electric shut down button is present outside of the entrance gateAn earthen berm perimeter with well-established vegetation is present around the fence/ well padThe well pad surface is composed of crushed gravel and remains in good repair.  A French drain has been installed with a stand pipe that drains on the North side of the pad.  The stand pipe valve was open. 
 +
Correct and legible identification is posted at the well head.  The well cellar contains freshwater with 48 inches of freeboard.  No sheen was identified on the surfaceSteel grating is set in place on top of the cellar to prevent falls.  The mousehole is cemented.  The intermediate annular pressure gauge appeared broken.  The production casing annular gauge indicated 120 psiNeither gauge is identified as to its respective casing string.  The well is equipped with a plunger lift assembly.  The production casing pressure gauge indicated 132.4 psi.  The production tubing pressure gauge indicated 185.2 psi.  No audible or visual leaks were detected.  The well was flowing during the inspection.
 +
Production equipment located on the pad consists of one (1) vertical sand/fluid separator, two  (2) gas processing units (GPU), one (1) 350 gallon hydrate inhibitor tank within sealed containment, one (1) vertical separator, six (6) 400 bbl production tanks within containment and one (1) emission combustion tower.  Co
 +
|-
 +
| 920249222
 +
| 2014-10-24 0:00
 +
| PL
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 18:03, 11 January 2021

Well Details

Well ID: 34-029-21719
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Hanover Township
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID: US-OH-000934
Farm/Lease Name: TREBILCOCK 25-15-4
License Status: Plugged Back
License Date: 2012-03-05
Spud Date: 2012-04-07
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2012-04-22
Well Total Depth: 8155.00 ft
Configuration: Vertical
Latitude: 40.750000
Longitude: -80.860000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-03-05 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:3/5/2012, Expired Date:3/5/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2012-04-22
Completion Report Received 2012-07-03
Construction Permit Expires 2014-03-05
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-06-04 8151 14035 352
8151 14035 352
8151 14035 352

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/18/2012 06/18/2012 8095.00 3,637,326.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FERROTROL 300L Baker Hughes Iron Control Agent Citric acid 77-92-9 50.00 0.00224000
Additional Ingredients Not Listed on MSDS
SCALETROL 720 Baker Hughes Scale Inhibitor Ethylene glycol 107-21-1 35.00 0.00480000
Diethylene glycol 111-46-6 5.00 0.00069000
BF-9L Baker Hughes pH Adjusting Agent Potassium hydroxide 1310-58-3 15.00 0.00216000
Ottawa Sand Proppant Quartz 14808-60-7 100.00 13.96
ALPHA 1427 Baker Hughes Antibacterial Agent Water 7732-18-5 60.00 0.00772000
Ethanol 64-17-5 5.00 0.00064000
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 7.00 0.00090000
Glutaraldehyde 111-30-8 30.00 0.00386000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00129000
ENZYME G-NE Baker Hughes Breaker No Hazardous Components 0.00
100 Mesh Sand Proppant Quartz 14808-60-7 100.00 2.03
Recycled Produced Water Carrier/Base Fluid 4.24
ClayCare Baker Hughes Clay Stabilizer Water 7732-18-5 30.00 0.02
Choline chloride 67-48-1 75.00 0.05
GBW-15L Baker Hughes Breaker Sodium chloride 7647-14-5 100.00 0.00988000
Hydrochloric Acid 10.1-15 Baker Hughes Acid Hydrochloric acid 7647-01-0 15.00 0.12
Water 7732-18-5 85.00 0.68
Fresh Water Carrier/Base Fluid 78.58
GW-3LDF Baker Hughes Gelling Agent Petroleum Distillate Blend 60.00 0.08
Polysaccharide Blend 60.00 0.08
BF-9L, CI-14, ENZYME G-NE, FERROTROL

300L, FRW-18, GBW-15L, GW-3LDF, SCALETROL 720

Baker Hughes Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent, Scale Inhibitor Proprietary Acid
Proprietary Silica
Proprietary Weak Acid
Proprietary Enzyme
Proprietary Disinfectant
Water 7732-18-5
Proprietary Alcohol
Calcium chloride 10043-52-4
Proprietary Copolymer
Proprietary Solvent
Hemicellulase Enzyme Concentrate 9025-56-3
Proprietary Biocide
Proprietary Surfactant
Proprietary Polymer
XLW-32 Baker Hughes Crosslinker Methanol 67-56-1 90.00 0.00864000
Boric acid 10043-35-3 20.00 0.00192000
CI-14 Baker Hughes Corrosion Inhibitor Propargyl alcohol 107-19-7 5.00 0.00007000
Methanol 67-56-1 68.00 0.00089000
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 8641 298
2015 CHESAPEAKE EXPLORATION LLC Brine 3605 307
2016 CHESAPEAKE EXPLORATION LLC Brine 2877 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1220 365
2018 CHESAPEAKE EXPLORATION LLC Brine 183 365
2019 CHESAPEAKE EXPLORATION LLC Brine 37 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1105687375 2017-9-20 0:00: PW No Violations 0.70
0110012870 2015-10-08 Preliminary Restoration No Violations

-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there is a site drain installed. The soil stockpile is well stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary restoration is complete and approved.

0920249222 2014-10-24 Preliminary Restoration No Violations

-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there is a site drain installed. The soil stockpile is well stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary restoration is complete and approved.

110012870 2015-10-8 0:00: PL No Violations
1105687375 2017-09-20 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-1719-01. The lease road and well pad remained in good repair. A locked chain link fence was constructed around the facility. No signs of vandalism were present. A stable earthen berm was present outside of the fenced perimeter. Correct identification was present. The well cellar contained fresh water near free board. No leaks were detected. The 9.625 annular pressure gauge indicated 0 psi. The 5.5 annular pressure gauge indicated 0 psi. The well was flowing during the inspection. The 5.5 production casing was equipped with a plunger lift assembly. Production equipment on the pad consisted of (1) sand knockout and GPU specific to well #1719-01. Common equipment shared with well #2-1728 included (1) hydrate inhibitor tank, one (1) meter run, one (1) coalescing tower, three (3) 400 bbl produced water tanks and three (3) condensate tanks inside steel containment and one (1) VRU. The containment was lined with an impervious liner and was holding fresh water. No violations were observed during this inspection.
1917624884 2016-11-28 Production Wells No Violations The purpose of my inspection was to conduct a status check on well # 2--established vegetation. A sign board is posted at the entrance and contains correct owner and well identification and emergency response information. A chain link security fence with barbed wire top is constructed around the well pad. The entrance gate and escape doors are locked to prevent unauthorized entry. An electric shut down button is present outside of the entrance gate. An earthen berm perimeter with well-established vegetation is present around the fence/ well pad. The well pad surface is composed of crushed gravel and remains in good repair. A French drain has been installed with a stand pipe that drains on the North side of the pad. The stand pipe valve was open.

Correct and legible identification is posted at the well head. The well cellar contains freshwater with 48 inches of freeboard. No sheen was identified on the surface. Steel grating is set in place on top of the cellar to prevent falls. The mousehole is cemented. The intermediate annular pressure gauge appeared broken. The production casing annular gauge indicated 120 psi. Neither gauge is identified as to its respective casing string. The well is equipped with a plunger lift assembly. The production casing pressure gauge indicated 132.4 psi. The production tubing pressure gauge indicated 185.2 psi. No audible or visual leaks were detected. The well was flowing during the inspection. Production equipment located on the pad consists of one (1) vertical sand/fluid separator, two (2) gas processing units (GPU), one (1) 350 gallon hydrate inhibitor tank within sealed containment, one (1) vertical separator, six (6) 400 bbl production tanks within containment and one (1) emission combustion tower. Co

920249222 2014-10-24 0:00 PL No Violations

For data sources see[7]

References