X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-119-27305"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-119-27305
 
| Well ID: 34-119-27305
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.883386340, -81.86825799 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.88, -81.86 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 29: Line 29:
 
| Final Drill Date: 1985-08-25
 
| Final Drill Date: 1985-08-25
 
|-
 
|-
| Well Total Depth: 4420 ft
+
| Well Total Depth: 4420.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.883386340
+
| Latitude: 39.880000
 
|-
 
|-
| Longitude: -81.86825799
+
| Longitude: -81.860000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 85: Line 85:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 96: Line 96:
 
|-
 
|-
 
| 1997-06-29
 
| 1997-06-29
 +
| style="text-align: right;" | 4276
 +
| style="text-align: right;" | 4310
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 +
| style="text-align: right;" | 4276
 +
| style="text-align: right;" | 4310
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 
| style="text-align: right;" | 4276
 
| style="text-align: right;" | 4276
 
| style="text-align: right;" | 4310
 
| style="text-align: right;" | 4310
Line 104: Line 114:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 153: Line 163:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 166: Line 176:
 
| 1993
 
| 1993
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 2277
+
| style="text-align: right;" | 2277.00
| style="text-align: right;" | 445
+
| style="text-align: right;" | 445.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 2405
+
| style="text-align: right;" | 2405.00
| style="text-align: right;" | 345
+
| style="text-align: right;" | 345.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 1
+
| style="text-align: right;" | 1.00
| style="text-align: right;" | 374
+
| style="text-align: right;" | 374.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 240
+
| style="text-align: right;" | 240.00
| style="text-align: right;" | 94
+
| style="text-align: right;" | 94.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 660
+
| style="text-align: right;" | 660.00
| style="text-align: right;" | 150
+
| style="text-align: right;" | 150.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 843
+
| style="text-align: right;" | 843.00
| style="text-align: right;" | 228
+
| style="text-align: right;" | 228.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 1140
+
| style="text-align: right;" | 1140.00
| style="text-align: right;" | 223
+
| style="text-align: right;" | 223.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 928
+
| style="text-align: right;" | 928.00
| style="text-align: right;" | 302
+
| style="text-align: right;" | 302.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 800
+
| style="text-align: right;" | 800.00
| style="text-align: right;" | 231
+
| style="text-align: right;" | 231.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 151
+
| style="text-align: right;" | 151.00
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 760
+
| style="text-align: right;" | 760.00
| style="text-align: right;" | 222
+
| style="text-align: right;" | 222.00
 
| style="text-align: right;" | 350
 
| style="text-align: right;" | 350
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 878
+
| style="text-align: right;" | 878.00
| style="text-align: right;" | 220
+
| style="text-align: right;" | 220.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 174
+
| style="text-align: right;" | 174.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 320
+
| style="text-align: right;" | 320.00
| style="text-align: right;" | 125
+
| style="text-align: right;" | 125.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 142
+
| style="text-align: right;" | 142.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 142
+
| style="text-align: right;" | 142.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 699
+
| style="text-align: right;" | 699.00
| style="text-align: right;" | 188
+
| style="text-align: right;" | 188.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 621
+
| style="text-align: right;" | 621.00
| style="text-align: right;" | 145
+
| style="text-align: right;" | 145.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 621
+
| style="text-align: right;" | 621.00
| style="text-align: right;" | 145
+
| style="text-align: right;" | 145.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 120
+
| style="text-align: right;" | 120.00
| style="text-align: right;" | 76
+
| style="text-align: right;" | 76.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 1067
+
| style="text-align: right;" | 1067.00
| style="text-align: right;" | 228
+
| style="text-align: right;" | 228.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 610
+
| style="text-align: right;" | 610.00
| style="text-align: right;" | 153
+
| style="text-align: right;" | 153.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 610
+
| style="text-align: right;" | 610.00
| style="text-align: right;" | 153
+
| style="text-align: right;" | 153.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 3372
+
| style="text-align: right;" | 3372.00
| style="text-align: right;" | 419
+
| style="text-align: right;" | 419.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 3028
+
| style="text-align: right;" | 3028.00
| style="text-align: right;" | 292
+
| style="text-align: right;" | 292.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 318: Line 328:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 489: Line 499:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 506: Line 516:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1950560821
 +
| 2008-10-20 0:00
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -275754237
 +
| 2005-1-5 0:00:0
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -809525682
 +
| 2005-9-21 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -948597494
 +
| 2006-12-18 0:00
 +
| PW
 +
| No Violations
 +
|
 
|-
 
|-
 
| 0000PL8029
 
| 0000PL8029
Line 548: Line 582:
 
| No Violations
 
| No Violations
 
| Rig moved on to pull and replace pump and get well back on line.
 
| Rig moved on to pull and replace pump and get well back on line.
 +
|-
 +
| PL8029
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 568: Line 608:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 19:34, 11 January 2021

Well Details

Well ID: 34-119-27305
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Salt Creek Township
Operator Name: VICTOR MCKENZIE DRILLING CO I
Well Pad ID:
Farm/Lease Name: HILDEBRAND A
License Status: Producing
License Date: 1985-07-03
Spud Date: 1985-07-11
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 1985-08-25
Well Total Depth: 4420.00 ft
Configuration: Vertical
Latitude: 39.880000
Longitude: -81.860000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1985-07-03 281 McKENZIE VICTOR DRILL INC GeoDate 7/3/85
Oil and Gas 1985-07-03 Issued Date 7/3/85 Expired Date 7/3/86 Acres 0040000 Tool Type CT Proposed Formation CLINTON Proposed Depth 04420 Proposed Drill Depth 04420
Original Spud 1985-07-11
Completed 1985-08-25
Reached Total Depth 1985-08-25
Completion Report Received 1985-09-10
Construction Permit Expires 1986-07-03
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4276 4310 0
4276 4310 0
4276 4310 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 FRAC;H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1993 VICTOR MCKENZIE DRILLING CO I 2277.00 445.00 180
1994 VICTOR MCKENZIE DRILLING CO I 2405.00 345.00 180
1995 VICTOR MCKENZIE DRILLING CO I 1.00 374.00 180
1996 VICTOR MCKENZIE DRILLING CO I 240.00 94.00 180
1997 VICTOR MCKENZIE DRILLING CO I 660.00 150.00 180
1998 VICTOR MCKENZIE DRILLING CO I 843.00 228.00 180
2000 VICTOR MCKENZIE DRILLING CO I 1140.00 223.00 180
2001 VICTOR MCKENZIE DRILLING CO I 928.00 302.00 180
2002 VICTOR MCKENZIE DRILLING CO I 800.00 231.00 180
2003 VICTOR MCKENZIE DRILLING CO I 0.00 151.00 360
2004 VICTOR MCKENZIE DRILLING CO I 760.00 222.00 350
2005 VICTOR MCKENZIE DRILLING CO I 878.00 220.00 180
2006 VICTOR MCKENZIE DRILLING CO I 174.00 0.00 180
2007 VICTOR MCKENZIE DRILLING CO I 320.00 125.00 180
2008 VICTOR MCKENZIE DRILLING CO I 0.00 142.00 365
2009 VICTOR MCKENZIE DRILLING CO I 0.00 142.00 365
2010 VICTOR MCKENZIE DRILLING CO I 699.00 188.00 365
2011 VICTOR MCKENZIE DRILLING CO I 621.00 145.00 365
2012 VICTOR MCKENZIE DRILLING CO I 621.00 145.00 366
2013 VICTOR MCKENZIE DRILLING CO I 120.00 76.00 365
2014 VICTOR MCKENZIE DRILLING CO I 1067.00 228.00 365
2015 VICTOR MCKENZIE DRILLING CO I 610.00 153.00 365
2016 VICTOR MCKENZIE DRILLING CO I 610.00 153.00 365
2017 VICTOR MCKENZIE DRILLING CO I 3372.00 419.00 365
2018 VICTOR MCKENZIE DRILLING CO I 3028.00 292.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1993 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1994 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1995 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1996 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1997 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1998 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2000 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2001 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2002 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2003 VICTOR MCKENZIE DRILLING CO I Brine 0 360
2004 VICTOR MCKENZIE DRILLING CO I Brine 0 350
2005 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2006 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2007 VICTOR MCKENZIE DRILLING CO I Brine 95 180
2008 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2009 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2010 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2011 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2012 VICTOR MCKENZIE DRILLING CO I Brine 0 366
2013 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2014 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2015 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2016 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2017 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2018 VICTOR MCKENZIE DRILLING CO I Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1950560821 2008-10-20 0:00 PW No Violations
-275754237 2005-1-5 0:00:0 PW No Violations
-809525682 2005-9-21 0:00: PW No Violations
-948597494 2006-12-18 0:00 PW No Violations
0000PL8029 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0275754237 2005-01-05 Production Wells No Violations Okay
0809525682 2005-09-21 Production Wells No Violations No ID, Separator leaking badly.
0948597494 2006-12-18 Production Wells No Violations House gas hooked up.
1220460685 2008-09-02 Production Wells Violations Noted Well is not producing. Some rods pulled. This is where they pulled the rig in. The rig has since had a new top pole put on but the well is on the Seybold well at my request ( NOV) I will contact Elmer at Mc Kenzie to see when they plan to get the well back on line.
1543060263 2009-09-21 Production Wells No Violations Producing, no problems noted. Compressor at tank. Was down for new 42 pipeline construction But back on line now.
1950560821 2008-10-20 Production Wells No Violations Rig moved on to pull and replace pump and get well back on line.
PL8029 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1220460685 US-OH-105904 2008-09-03 Well shall be plugged

For data sources see[9]

References