X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-21690"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-21690
 
| Well ID: 34-111-21690
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.723721197, -81.15948618 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.72, -81.15 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Producing
 
| License Status: Producing
 
|-
 
|-
| License Date: 2006-09-12
+
| License Date: 1967-08-24
 
|-
 
|-
 
| Spud Date: 1967-08-21
 
| Spud Date: 1967-08-21
Line 29: Line 29:
 
| Final Drill Date: 1968-02-10
 
| Final Drill Date: 1968-02-10
 
|-
 
|-
| Well Total Depth: 1790 ft
+
| Well Total Depth: 1790.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.723721197
+
| Latitude: 39.720000
 
|-
 
|-
| Longitude: -81.15948618
+
| Longitude: -81.150000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 77: Line 77:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Perforation Treatments ==
 
<!--== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 133: Line 133:
 
| 1985
 
| 1985
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 328
+
| style="text-align: right;" | 328.00
| style="text-align: right;" | 170
+
| style="text-align: right;" | 170.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1986
 
| 1986
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 235
+
| style="text-align: right;" | 235.00
| style="text-align: right;" | 81
+
| style="text-align: right;" | 81.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1987
 
| 1987
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 168
+
| style="text-align: right;" | 168.00
| style="text-align: right;" | 161
+
| style="text-align: right;" | 161.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 462
+
| style="text-align: right;" | 462.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 690
+
| style="text-align: right;" | 690.00
| style="text-align: right;" | 176
+
| style="text-align: right;" | 176.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 463
+
| style="text-align: right;" | 463.00
| style="text-align: right;" | 163
+
| style="text-align: right;" | 163.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 404
+
| style="text-align: right;" | 404.00
| style="text-align: right;" | 70
+
| style="text-align: right;" | 70.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 325
+
| style="text-align: right;" | 325.00
| style="text-align: right;" | 170
+
| style="text-align: right;" | 170.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 121
+
| style="text-align: right;" | 121.00
| style="text-align: right;" | 112
+
| style="text-align: right;" | 112.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 327
+
| style="text-align: right;" | 327.00
| style="text-align: right;" | 283
+
| style="text-align: right;" | 283.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 356
+
| style="text-align: right;" | 356.00
| style="text-align: right;" | 146
+
| style="text-align: right;" | 146.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 270
+
| style="text-align: right;" | 270.00
| style="text-align: right;" | 49
+
| style="text-align: right;" | 49.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 314
+
| style="text-align: right;" | 314.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 233
+
| style="text-align: right;" | 233.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 216
+
| style="text-align: right;" | 216.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 242
+
| style="text-align: right;" | 242.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 189
+
| style="text-align: right;" | 189.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 242
+
| style="text-align: right;" | 242.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 201
+
| style="text-align: right;" | 201.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 102
+
| style="text-align: right;" | 102.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 163
+
| style="text-align: right;" | 163.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[P P & G OIL]]
 
| [[P P & G OIL]]
| style="text-align: right;" | 337
+
| style="text-align: right;" | 337.00
| style="text-align: right;" | 128
+
| style="text-align: right;" | 128.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[P P & G OIL]]
 
| [[P P & G OIL]]
| style="text-align: right;" | 251
+
| style="text-align: right;" | 251.00
| style="text-align: right;" | 102
+
| style="text-align: right;" | 102.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[P P & G OIL]]
 
| [[P P & G OIL]]
| style="text-align: right;" | 255
+
| style="text-align: right;" | 255.00
| style="text-align: right;" | 56
+
| style="text-align: right;" | 56.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CHRISTMAN ROSALIE]]
 
| [[CHRISTMAN ROSALIE]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[P P & G OIL]]
 
| [[P P & G OIL]]
| style="text-align: right;" | 285
+
| style="text-align: right;" | 285.00
| style="text-align: right;" | 30
+
| style="text-align: right;" | 30.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 297: Line 297:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 480: Line 480:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 517: Line 517:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 21:24, 11 January 2021

Well Details

Well ID: 34-111-21690
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Wayne Township
Operator Name: P P & G OIL
Well Pad ID:
Farm/Lease Name: MCGARRY SAM - HEIRS
License Status: Producing
License Date: 1967-08-24
Spud Date: 1967-08-21
Spud Drilling Contractor:
Final Drill Date: 1968-02-10
Well Total Depth: 1790.00 ft
Configuration: Vertical
Latitude: 39.720000
Longitude: -81.150000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1801-01-02 703 CHRISTMAN CHARLES E
Original Spud 1967-08-21
Completed 1968-02-10
Reached Total Depth 1968-02-10
Change of Owner 2017-06-13 Operator changed from 703, CHRISTMAN ROSALIE to 4695, P P & G OIL
Record Last Modified 2017-06-13

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 CHRISTMAN ROSALIE 328.00 170.00 180
1986 CHRISTMAN ROSALIE 235.00 81.00 180
1987 CHRISTMAN ROSALIE 168.00 161.00 180
1988 CHRISTMAN ROSALIE 462.00 0.00 180
1993 CHRISTMAN ROSALIE 690.00 176.00 365
1995 CHRISTMAN ROSALIE 463.00 163.00 0
1996 CHRISTMAN ROSALIE 404.00 70.00 0
1997 CHRISTMAN ROSALIE 325.00 170.00 0
1998 CHRISTMAN ROSALIE 121.00 112.00 365
1999 CHRISTMAN ROSALIE 327.00 283.00 365
2000 CHRISTMAN ROSALIE 356.00 146.00 365
2001 CHRISTMAN ROSALIE 270.00 49.00 365
2002 CHRISTMAN ROSALIE 314.00 0.00 365
2003 CHRISTMAN ROSALIE 233.00 0.00 365
2004 CHRISTMAN ROSALIE 216.00 0.00 365
2005 CHRISTMAN ROSALIE 242.00 0.00 365
2006 CHRISTMAN ROSALIE 189.00 0.00 365
2007 CHRISTMAN ROSALIE 242.00 0.00 365
2008 CHRISTMAN ROSALIE 201.00 0.00 365
2009 CHRISTMAN ROSALIE 102.00 0.00 365
2010 CHRISTMAN ROSALIE 163.00 0.00 365
2013 P P & G OIL 337.00 128.00 365
2014 P P & G OIL 251.00 102.00 365
2015 P P & G OIL 255.00 56.00 365
2016 CHRISTMAN ROSALIE 0.00 0.00 365
2017 CHRISTMAN ROSALIE 0.00 0.00 365
2018 P P & G OIL 285.00 30.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 CHRISTMAN ROSALIE Brine 0 180
1986 CHRISTMAN ROSALIE Brine 0 180
1987 CHRISTMAN ROSALIE Brine 0 180
1988 CHRISTMAN ROSALIE Brine 0 180
1993 CHRISTMAN ROSALIE Brine 0 365
1995 CHRISTMAN ROSALIE Brine 0 0
1996 CHRISTMAN ROSALIE Brine 0 0
1997 CHRISTMAN ROSALIE Brine 0
1998 CHRISTMAN ROSALIE Brine 0 365
1999 CHRISTMAN ROSALIE Brine 0 365
2000 CHRISTMAN ROSALIE Brine 0 365
2001 CHRISTMAN ROSALIE Brine 0 365
2002 CHRISTMAN ROSALIE Brine 0 365
2003 CHRISTMAN ROSALIE Brine 0 365
2004 CHRISTMAN ROSALIE Brine 0 365
2005 CHRISTMAN ROSALIE Brine 0 365
2006 CHRISTMAN ROSALIE Brine 0 365
2007 CHRISTMAN ROSALIE Brine 0 365
2008 CHRISTMAN ROSALIE Brine 0 365
2009 CHRISTMAN ROSALIE Brine 0 365
2010 CHRISTMAN ROSALIE Brine 0 365
2013 P P & G OIL Brine 18 365
2014 P P & G OIL Brine 1 365
2015 P P & G OIL Brine 12 365
2016 CHRISTMAN ROSALIE Brine 0 365
2017 CHRISTMAN ROSALIE Brine 0 365
2018 P P & G OIL Brine 7 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1282930399 2010-08-25 Production Wells No Violations On day of inspection well is supplied with a pump jack and 6 1/4 casing and 2tubing and an electric motor. There were two 100bbl tanks moved and diked up on hill. Old tanks were bad.

For data sources see[7]

References