X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-22953"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-22953
 
| Well ID: 34-111-22953
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.836873881, -81.24918831 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.83, -81.24 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 29: Line 29:
 
| Final Drill Date: 1983-08-11
 
| Final Drill Date: 1983-08-11
 
|-
 
|-
| Well Total Depth: 2477 ft
+
| Well Total Depth: 2477.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.836873881
+
| Latitude: 39.830000
 
|-
 
|-
| Longitude: -81.24918831
+
| Longitude: -81.240000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 93: Line 93:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 104: Line 104:
 
|-
 
|-
 
| 1997-06-29
 
| 1997-06-29
 +
| style="text-align: right;" | 1906
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 
| style="text-align: right;" | 1906
 
| style="text-align: right;" | 1906
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 112: Line 117:
 
| style="text-align: right;" | 2373
 
| style="text-align: right;" | 2373
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 +
|-
 +
|
 +
| style="text-align: right;" | 2177
 +
| style="text-align: right;" | 2373
 +
| style="text-align: right;" | 12
 +
|-
 +
|
 +
| style="text-align: right;" | 1906
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 117: Line 132:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 166: Line 181:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 179: Line 194:
 
| 1986
 
| 1986
 
| [[PARKSIDE PET OF OHIO INC]]
 
| [[PARKSIDE PET OF OHIO INC]]
| style="text-align: right;" | 2985
+
| style="text-align: right;" | 2985.00
| style="text-align: right;" | 110
+
| style="text-align: right;" | 110.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1987
 
| 1987
 
| [[PARKSIDE PET OF OHIO INC]]
 
| [[PARKSIDE PET OF OHIO INC]]
| style="text-align: right;" | 2008
+
| style="text-align: right;" | 2008.00
| style="text-align: right;" | 80
+
| style="text-align: right;" | 80.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1157
+
| style="text-align: right;" | 1157.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1989
 
| 1989
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 2006
+
| style="text-align: right;" | 2006.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1990
 
| 1990
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1485
+
| style="text-align: right;" | 1485.00
| style="text-align: right;" | 20
+
| style="text-align: right;" | 20.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 755
+
| style="text-align: right;" | 755.00
| style="text-align: right;" | 35
+
| style="text-align: right;" | 35.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 647
+
| style="text-align: right;" | 647.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 517
+
| style="text-align: right;" | 517.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 42
+
| style="text-align: right;" | 42.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1397
+
| style="text-align: right;" | 1397.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 904
+
| style="text-align: right;" | 904.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 896
+
| style="text-align: right;" | 896.00
| style="text-align: right;" | 18
+
| style="text-align: right;" | 18.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1213
+
| style="text-align: right;" | 1213.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1067
+
| style="text-align: right;" | 1067.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 644
+
| style="text-align: right;" | 644.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 557
+
| style="text-align: right;" | 557.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 489
+
| style="text-align: right;" | 489.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 487
+
| style="text-align: right;" | 487.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 549
+
| style="text-align: right;" | 549.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 804
+
| style="text-align: right;" | 804.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 706
+
| style="text-align: right;" | 706.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 620
+
| style="text-align: right;" | 620.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 599
+
| style="text-align: right;" | 599.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 101
+
| style="text-align: right;" | 101.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 311
+
| style="text-align: right;" | 311.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 337: Line 352:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 514: Line 529:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 537: Line 552:
 
| No Violations
 
| No Violations
 
| Preliminary Restoration  done information from Data Point
 
| Preliminary Restoration  done information from Data Point
 +
|-
 +
| PL10452
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 551: Line 572:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 21:44, 11 January 2021

Well Details

Well ID: 34-111-22953
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: G-R CONTRACTING INC
Well Pad ID:
Farm/Lease Name: CHRISTMAN
License Status: Producing
License Date: 1983-08-02
Spud Date: 1983-08-06
Spud Drilling Contractor: CHM DRLG
Final Drill Date: 1983-08-11
Well Total Depth: 2477.00 ft
Configuration: Vertical
Latitude: 39.830000
Longitude: -81.240000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1982-12-03 Issued Date 12/3/82 Expired Date 6/1/83 Acres 0107250 Tool Type CRA Proposed Formation OHIO SHALE Proposed Depth 00000 Proposed Drill Depth 00000
CO 1983-08-02 952 G-R CONTRACTING INC GeoDate 8/2/83
Oil and Gas 1983-08-02 Issued Date 8/2/83 Expired Date 1/29/84 Acres 0107250 Tool Type RTA Proposed Formation GORDON Proposed Depth 02477 Proposed Drill Depth 02477
Original Spud 1983-08-04 R.I. 8-6-83
Completed 1983-08-11 R.I. 8-6-83
Reached Total Depth 1983-08-11 R.I. 8-6-83
Completion Report Received 1983-09-14 R.I. 8-6-83
CO 1983-09-15 106 SHAFER BERMAN J GeoDate 12/3/82
Construction Permit Expires 1984-01-29 R.I. 8-6-83
Record Last Modified 2015-09-24 R.I. 8-6-83

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 1906 0
1906 0
2006-09-11 2177 2373 12
2177 2373 12
1906 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 60000 Gal 0 FRAC;60MG H2O

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1986 PARKSIDE PET OF OHIO INC 2985.00 110.00 365
1987 PARKSIDE PET OF OHIO INC 2008.00 80.00 365
1988 G-R CONTRACTING INC 1157.00 0.00 365
1989 G-R CONTRACTING INC 2006.00 0.00 365
1990 G-R CONTRACTING INC 1485.00 20.00 365
1996 G-R CONTRACTING INC 755.00 35.00 365
1997 G-R CONTRACTING INC 647.00 0.00 365
1998 G-R CONTRACTING INC 517.00 0.00 365
2000 G-R CONTRACTING INC 0.00 42.00 365
2001 G-R CONTRACTING INC 1397.00 0.00 365
2002 G-R CONTRACTING INC 904.00 0.00 365
2003 G-R CONTRACTING INC 896.00 18.00 365
2004 G-R CONTRACTING INC 1213.00 0.00 365
2005 G-R CONTRACTING INC 1067.00 0.00 365
2006 G-R CONTRACTING INC 0.00 0.00 365
2007 G-R CONTRACTING INC 644.00 0.00 365
2008 G-R CONTRACTING INC 557.00 0.00 365
2009 G-R CONTRACTING INC 489.00 0.00 365
2010 G-R CONTRACTING INC 487.00 0.00 365
2011 G-R CONTRACTING INC 549.00 0.00 365
2012 G-R CONTRACTING INC 804.00 0.00 366
2013 G-R CONTRACTING INC 706.00 0.00 365
2014 G-R CONTRACTING INC 620.00 0.00 365
2015 G-R CONTRACTING INC 599.00 0.00 365
2016 G-R CONTRACTING INC 101.00 0.00 365
2017 G-R CONTRACTING INC 311.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1986 PARKSIDE PET OF OHIO INC Brine 15 365
1987 PARKSIDE PET OF OHIO INC Brine 0 365
1988 G-R CONTRACTING INC Brine 0 365
1989 G-R CONTRACTING INC Brine 0 365
1990 G-R CONTRACTING INC Brine 0 365
1996 G-R CONTRACTING INC Brine 0 365
1997 G-R CONTRACTING INC Brine 0 365
1998 G-R CONTRACTING INC Brine 0 365
2000 G-R CONTRACTING INC Brine 0 365
2001 G-R CONTRACTING INC Brine 0 365
2002 G-R CONTRACTING INC Brine 0 365
2003 G-R CONTRACTING INC Brine 0 365
2004 G-R CONTRACTING INC Brine 0 365
2005 G-R CONTRACTING INC Brine 0 365
2006 G-R CONTRACTING INC Brine 0 365
2007 G-R CONTRACTING INC Brine 0 365
2008 G-R CONTRACTING INC Brine 0 365
2009 G-R CONTRACTING INC Brine 0 365
2010 G-R CONTRACTING INC Brine 0 365
2011 G-R CONTRACTING INC Brine 0 365
2012 G-R CONTRACTING INC Brine 0 366
2013 G-R CONTRACTING INC Brine 0 365
2014 G-R CONTRACTING INC Brine 0 365
2015 G-R CONTRACTING INC Brine 0 365
2016 G-R CONTRACTING INC Brine 0 365
2017 G-R CONTRACTING INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
000PL10452 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
PL10452 PL No Violations

For data sources see[9]

References