If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-111-23229 | | Well ID: 34-111-23229 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.81, -81.31 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 11: | Line 11: | ||
| County: [[Monroe_County,_Ohio|Monroe]] | | County: [[Monroe_County,_Ohio|Monroe]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Seneca_Township,_Monroe_County,_Ohio|Seneca Township]] |
|- | |- | ||
| Operator Name: [[G-R CONTRACTING INC]] | | Operator Name: [[G-R CONTRACTING INC]] | ||
Line 29: | Line 29: | ||
| Final Drill Date: 1986-10-29 | | Final Drill Date: 1986-10-29 | ||
|- | |- | ||
− | | Well Total Depth: 1850 ft | + | | Well Total Depth: 1850.00 ft |
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.810000 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.310000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Well History == | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 69: | Line 69: | ||
| title = Risk Based Data Management System - Well and WellHistry Tables | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Perforation Treatments == | == Perforation Treatments == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 80: | Line 80: | ||
|- | |- | ||
| 2006-09-11 | | 2006-09-11 | ||
+ | | style="text-align: right;" | 1503 | ||
+ | | style="text-align: right;" | 1783 | ||
+ | | style="text-align: right;" | 27 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 1503 | ||
+ | | style="text-align: right;" | 1783 | ||
+ | | style="text-align: right;" | 27 | ||
+ | |- | ||
+ | | | ||
| style="text-align: right;" | 1503 | | style="text-align: right;" | 1503 | ||
| style="text-align: right;" | 1783 | | style="text-align: right;" | 1783 | ||
Line 88: | Line 98: | ||
| title = Risk Based Data Management System - Perfs Table | | title = Risk Based Data Management System - Perfs Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 137: | Line 147: | ||
| title = Risk Based Data Management System - tblStimulation Table | | title = Risk Based Data Management System - tblStimulation Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 150: | Line 160: | ||
| 1987 | | 1987 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 6254 | + | | style="text-align: right;" | 6254.00 |
− | | style="text-align: right;" | 665 | + | | style="text-align: right;" | 665.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1988 | | 1988 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 19755 | + | | style="text-align: right;" | 19755.00 |
− | | style="text-align: right;" | 104 | + | | style="text-align: right;" | 104.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1989 | | 1989 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 3062 | + | | style="text-align: right;" | 3062.00 |
− | | style="text-align: right;" | 281 | + | | style="text-align: right;" | 281.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1990 | | 1990 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 1869 | + | | style="text-align: right;" | 1869.00 |
− | | style="text-align: right;" | 57 | + | | style="text-align: right;" | 57.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1996 | | 1996 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 2879 | + | | style="text-align: right;" | 2879.00 |
− | | style="text-align: right;" | 58 | + | | style="text-align: right;" | 58.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1997 | | 1997 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 3042 | + | | style="text-align: right;" | 3042.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1998 | | 1998 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 2567 | + | | style="text-align: right;" | 2567.00 |
− | | style="text-align: right;" | 64 | + | | style="text-align: right;" | 64.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2000 | | 2000 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 1571 | + | | style="text-align: right;" | 1571.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2001 | | 2001 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2002 | | 2002 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 1176 | + | | style="text-align: right;" | 1176.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2003 | | 2003 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 1337 | + | | style="text-align: right;" | 1337.00 |
− | | style="text-align: right;" | 71 | + | | style="text-align: right;" | 71.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2004 | | 2004 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 726 | + | | style="text-align: right;" | 726.00 |
− | | style="text-align: right;" | 435 | + | | style="text-align: right;" | 435.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2005 | | 2005 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 1806 | + | | style="text-align: right;" | 1806.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2006 | | 2006 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 1368 | + | | style="text-align: right;" | 1368.00 |
− | | style="text-align: right;" | 195 | + | | style="text-align: right;" | 195.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2007 | | 2007 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 528 | + | | style="text-align: right;" | 528.00 |
− | | style="text-align: right;" | 164 | + | | style="text-align: right;" | 164.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2008 | | 2008 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 1070 | + | | style="text-align: right;" | 1070.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2009 | | 2009 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 499 | + | | style="text-align: right;" | 499.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2010 | | 2010 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 220 | + | | style="text-align: right;" | 220.00 |
− | | style="text-align: right;" | 711 | + | | style="text-align: right;" | 711.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2011 | | 2011 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 456 | + | | style="text-align: right;" | 456.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2012 | | 2012 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 539 | + | | style="text-align: right;" | 539.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
|- | |- | ||
| 2013 | | 2013 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 945 | + | | style="text-align: right;" | 945.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2014 | | 2014 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 461 | + | | style="text-align: right;" | 461.00 |
− | | style="text-align: right;" | 42 | + | | style="text-align: right;" | 42.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2015 | | 2015 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 677 | + | | style="text-align: right;" | 677.00 |
− | | style="text-align: right;" | 128 | + | | style="text-align: right;" | 128.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 175 | + | | style="text-align: right;" | 175.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2017 | | 2017 | ||
| [[G-R CONTRACTING INC]] | | [[G-R CONTRACTING INC]] | ||
− | | style="text-align: right;" | 328 | + | | style="text-align: right;" | 328.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
Line 302: | Line 312: | ||
| title = Risk Based Data Management System - Production Table - Oil and Gas Data | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<ref>{{cite web | <ref>{{cite web | ||
| title = Combined Production - Oil and Gas Data | | title = Combined Production - Oil and Gas Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
Line 473: | Line 483: | ||
| title = Risk Based Data Management System - Production Table - Brine Data | | title = Risk Based Data Management System - Production Table - Brine Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<ref>{{cite web | <ref>{{cite web | ||
| title = Combined Production - Brine Data | | title = Combined Production - Brine Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Inspection Data == | == Inspection Data == | ||
==== Inspections Performed ==== | ==== Inspections Performed ==== | ||
Line 490: | Line 500: | ||
!scope="col" style="text-align: center"| Inspection Result | !scope="col" style="text-align: center"| Inspection Result | ||
!scope="col" style="text-align: center"| Inspection Comments | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | -2084101045 | ||
+ | | 2018-3-7 0:00:0 | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | 0.20 | ||
|- | |- | ||
| 1812518986 | | 1812518986 | ||
Line 516: | Line 532: | ||
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Ohio Wells]] | [[Category:Ohio Wells]] |
Well ID: 34-111-23229 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: G-R CONTRACTING INC | |
Well Pad ID: | |
Farm/Lease Name: RUBEL | |
License Status: Producing | |
License Date: 1986-04-26 | |
Spud Date: 1986-10-27 | |
Spud Drilling Contractor: | |
Final Drill Date: 1986-10-29 | |
Well Total Depth: 1850.00 ft | |
Configuration: Vertical | |
Latitude: 39.810000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1986-10-27 | |
Completed | 1986-10-29 | |
Reached Total Depth | 1986-10-29 | |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 1503 | 1783 | 27 |
1503 | 1783 | 27 | |
1503 | 1783 | 27 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | & SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | G-R CONTRACTING INC | 6254.00 | 665.00 | 365 |
1988 | G-R CONTRACTING INC | 19755.00 | 104.00 | 365 |
1989 | G-R CONTRACTING INC | 3062.00 | 281.00 | 365 |
1990 | G-R CONTRACTING INC | 1869.00 | 57.00 | 365 |
1996 | G-R CONTRACTING INC | 2879.00 | 58.00 | 365 |
1997 | G-R CONTRACTING INC | 3042.00 | 0.00 | 365 |
1998 | G-R CONTRACTING INC | 2567.00 | 64.00 | 365 |
2000 | G-R CONTRACTING INC | 1571.00 | 0.00 | 365 |
2001 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2002 | G-R CONTRACTING INC | 1176.00 | 0.00 | 365 |
2003 | G-R CONTRACTING INC | 1337.00 | 71.00 | 365 |
2004 | G-R CONTRACTING INC | 726.00 | 435.00 | 365 |
2005 | G-R CONTRACTING INC | 1806.00 | 0.00 | 365 |
2006 | G-R CONTRACTING INC | 1368.00 | 195.00 | 365 |
2007 | G-R CONTRACTING INC | 528.00 | 164.00 | 365 |
2008 | G-R CONTRACTING INC | 1070.00 | 0.00 | 365 |
2009 | G-R CONTRACTING INC | 499.00 | 0.00 | 365 |
2010 | G-R CONTRACTING INC | 220.00 | 711.00 | 365 |
2011 | G-R CONTRACTING INC | 456.00 | 0.00 | 365 |
2012 | G-R CONTRACTING INC | 539.00 | 0.00 | 366 |
2013 | G-R CONTRACTING INC | 945.00 | 0.00 | 365 |
2014 | G-R CONTRACTING INC | 461.00 | 42.00 | 365 |
2015 | G-R CONTRACTING INC | 677.00 | 128.00 | 365 |
2016 | G-R CONTRACTING INC | 175.00 | 0.00 | 365 |
2017 | G-R CONTRACTING INC | 328.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | G-R CONTRACTING INC | Brine | 0 | 365 |
1988 | G-R CONTRACTING INC | Brine | 0 | 365 |
1989 | G-R CONTRACTING INC | Brine | 0 | 365 |
1990 | G-R CONTRACTING INC | Brine | 0 | 365 |
1996 | G-R CONTRACTING INC | Brine | 0 | 365 |
1997 | G-R CONTRACTING INC | Brine | 0 | 365 |
1998 | G-R CONTRACTING INC | Brine | 0 | 365 |
2000 | G-R CONTRACTING INC | Brine | 0 | 365 |
2001 | G-R CONTRACTING INC | Brine | 0 | 365 |
2002 | G-R CONTRACTING INC | Brine | 0 | 365 |
2003 | G-R CONTRACTING INC | Brine | 0 | 365 |
2004 | G-R CONTRACTING INC | Brine | 0 | 365 |
2005 | G-R CONTRACTING INC | Brine | 0 | 365 |
2006 | G-R CONTRACTING INC | Brine | 0 | 365 |
2007 | G-R CONTRACTING INC | Brine | 0 | 365 |
2008 | G-R CONTRACTING INC | Brine | 0 | 365 |
2009 | G-R CONTRACTING INC | Brine | 0 | 365 |
2010 | G-R CONTRACTING INC | Brine | 0 | 365 |
2011 | G-R CONTRACTING INC | Brine | 0 | 365 |
2012 | G-R CONTRACTING INC | Brine | 0 | 366 |
2013 | G-R CONTRACTING INC | Brine | 0 | 365 |
2014 | G-R CONTRACTING INC | Brine | 0 | 365 |
2015 | G-R CONTRACTING INC | Brine | 0 | 365 |
2016 | G-R CONTRACTING INC | Brine | 0 | 365 |
2017 | G-R CONTRACTING INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2084101045 | 2018-3-7 0:00:0 | PW | No Violations | 0.20 |
1812518986 | 2012-04-05 | Production Wells | No Violations | On the day of my inspection the well was complete with a plunger lift system. Tank battery contents included one 100 bbl oil storage tank and a mechanical separator. No violations were noted. |
2084101045 | 2018-03-07 | Production Wells | No Violations | Status check inspection found the well equipped with 8.625 diameter surface casing and 4.5 diameter production casing along with 1.900 diameter production tubing. The well is set up to be produced by the means of a plunger lift system. On location near the well head is the production facility consisting of a single 100 barrel steel tank and mechanical separator along with a gas sales meter with a current sales chart in the meter. |
For data sources see[9]