X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-23316"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-23316
 
| Well ID: 34-111-23316
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.792615330, -81.19392865 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.79, -81.19 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 11: Line 11:
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
|-
 
|-
| Municipality: [[Summit Township,_Monroe_County,_Ohio|Summit Township]]
+
| Municipality: [[Summit_Township,_Monroe_County,_Ohio|Summit Township]]
 
|-
 
|-
 
| Operator Name: [[G-R CONTRACTING INC]]
 
| Operator Name: [[G-R CONTRACTING INC]]
Line 29: Line 29:
 
| Final Drill Date: 1988-07-29
 
| Final Drill Date: 1988-07-29
 
|-
 
|-
| Well Total Depth: 2402 ft
+
| Well Total Depth: 2402.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.792615330
+
| Latitude: 39.790000
 
|-
 
|-
| Longitude: -81.19392865
+
| Longitude: -81.190000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 89: Line 89:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 103: Line 103:
 
| style="text-align: right;" | 1941
 
| style="text-align: right;" | 1941
 
| style="text-align: right;" | 8
 
| style="text-align: right;" | 8
 +
|-
 +
|
 +
| style="text-align: right;" | 1944
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-09-11
 
| 2006-09-11
Line 108: Line 113:
 
| style="text-align: right;" | 2238
 
| style="text-align: right;" | 2238
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 +
|-
 +
|
 +
| style="text-align: right;" | 1937
 +
| style="text-align: right;" | 1941
 +
| style="text-align: right;" | 8
 +
|-
 +
|
 +
| style="text-align: right;" | 1937
 +
| style="text-align: right;" | 1941
 +
| style="text-align: right;" | 8
 
|-
 
|-
 
| 1997-06-29
 
| 1997-06-29
Line 118: Line 133:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 191: Line 206:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 204: Line 219:
 
| 1988
 
| 1988
 
| [[GORDON ENERGY CORP]]
 
| [[GORDON ENERGY CORP]]
| style="text-align: right;" | 3779
+
| style="text-align: right;" | 3779.00
| style="text-align: right;" | 147
+
| style="text-align: right;" | 147.00
 
| style="text-align: right;" | 144
 
| style="text-align: right;" | 144
 
|-
 
|-
 
| 1989
 
| 1989
 
| [[GORDON ENERGY CORP]]
 
| [[GORDON ENERGY CORP]]
| style="text-align: right;" | 9921
+
| style="text-align: right;" | 9921.00
| style="text-align: right;" | 100
+
| style="text-align: right;" | 100.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[GORDON ENERGY CORP]]
 
| [[GORDON ENERGY CORP]]
| style="text-align: right;" | 2739
+
| style="text-align: right;" | 2739.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 310
 
| style="text-align: right;" | 310
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 675
+
| style="text-align: right;" | 675.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 538
+
| style="text-align: right;" | 538.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 482
+
| style="text-align: right;" | 482.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 195
+
| style="text-align: right;" | 195.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 638
+
| style="text-align: right;" | 638.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 239
+
| style="text-align: right;" | 239.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 324
+
| style="text-align: right;" | 324.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 389
+
| style="text-align: right;" | 389.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 129
+
| style="text-align: right;" | 129.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 32
+
| style="text-align: right;" | 32.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 25
+
| style="text-align: right;" | 25.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 150
+
| style="text-align: right;" | 150.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 149
+
| style="text-align: right;" | 149.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 159
+
| style="text-align: right;" | 159.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 99
+
| style="text-align: right;" | 99.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 84
+
| style="text-align: right;" | 84.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 113
+
| style="text-align: right;" | 113.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 100
+
| style="text-align: right;" | 100.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 327
+
| style="text-align: right;" | 327.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 83
+
| style="text-align: right;" | 83.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 350: Line 365:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 515: Line 530:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 544: Line 559:
 
| No Violations
 
| No Violations
 
| On this day, I found the well equipped with 8.625 inch diameter surface casing, 4.5 inch diameter production casing with the valve open, 2 inch diameter tubing with the valve open, and produced by a plunger lift system. A gas regulator is connected to the 4.5 inch casing with a 0.25 inch diameter copper line. There is (1) 100 barrel steel tank, vertical separator, and drip tank all contained within an earthen dike. The production facility is shared with permit number 2-2204. The well is properly identified and the production records are current.
 
| On this day, I found the well equipped with 8.625 inch diameter surface casing, 4.5 inch diameter production casing with the valve open, 2 inch diameter tubing with the valve open, and produced by a plunger lift system. A gas regulator is connected to the 4.5 inch casing with a 0.25 inch diameter copper line. There is (1) 100 barrel steel tank, vertical separator, and drip tank all contained within an earthen dike. The production facility is shared with permit number 2-2204. The well is properly identified and the production records are current.
 +
|-
 +
| 525389562
 +
| 2018-1-22 0:00:
 +
| PW
 +
| No Violations
 +
| 0.50
 +
|-
 +
| PL10207
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 558: Line 585:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 23:08, 11 January 2021

Well Details

Well ID: 34-111-23316
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Summit Township
Operator Name: G-R CONTRACTING INC
Well Pad ID:
Farm/Lease Name: HINDERLONG
License Status: Producing
License Date: 1988-04-12
Spud Date: 1988-07-25
Spud Drilling Contractor: G-R CONTRACTING
Final Drill Date: 1988-07-29
Well Total Depth: 2402.00 ft
Configuration: Vertical
Latitude: 39.790000
Longitude: -81.190000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1988-04-12 2107 GORDON ENERGY CORP GeoDate 4/12/88
Oil and Gas 1988-04-12 Issued Date 4/12/88 Expired Date 4/12/89 Acres 0020000 Tool Type RTA Proposed Formation OHIO SHALE Proposed Depth 02402 Proposed Drill Depth 02402
Original Spud 1988-07-25
Completed 1988-07-29
Reached Total Depth 1988-07-29
Completion Report Received 1988-08-10
Construction Permit Expires 1989-04-12
CO 1992-09-09 952 G-R CONTRACTING INC GeoDate 4/12/88
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 1937 1941 8
1944 0
2006-09-11 2218 2238 12
1937 1941 8
1937 1941 8
1997-06-29 1944 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 150 Gal 0 2 STAGE FRAC:WATER/ACID/SAND
ACID 0 500 Gal 0 BEREA
H2O 0 1140 Bbl 11100 BEREA
H2O 0 1330 Bbl 33300 GORDON

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1988 GORDON ENERGY CORP 3779.00 147.00 144
1989 GORDON ENERGY CORP 9921.00 100.00 365
1991 GORDON ENERGY CORP 2739.00 0.00 310
1996 G-R CONTRACTING INC 675.00 0.00 365
1997 G-R CONTRACTING INC 538.00 0.00 365
1998 G-R CONTRACTING INC 482.00 0.00 365
2000 G-R CONTRACTING INC 195.00 0.00 365
2001 G-R CONTRACTING INC 638.00 0.00 365
2002 G-R CONTRACTING INC 239.00 0.00 365
2003 G-R CONTRACTING INC 324.00 0.00 365
2004 G-R CONTRACTING INC 389.00 0.00 365
2005 G-R CONTRACTING INC 0.00 0.00 365
2006 G-R CONTRACTING INC 129.00 0.00 365
2007 G-R CONTRACTING INC 32.00 0.00 365
2008 G-R CONTRACTING INC 25.00 0.00 365
2009 G-R CONTRACTING INC 150.00 0.00 365
2010 G-R CONTRACTING INC 149.00 0.00 365
2011 G-R CONTRACTING INC 159.00 0.00 365
2012 G-R CONTRACTING INC 99.00 0.00 366
2013 G-R CONTRACTING INC 84.00 0.00 365
2014 G-R CONTRACTING INC 113.00 0.00 365
2015 G-R CONTRACTING INC 100.00 0.00 365
2016 G-R CONTRACTING INC 327.00 0.00 365
2017 G-R CONTRACTING INC 83.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1988 GORDON ENERGY CORP Brine 0 144
1989 GORDON ENERGY CORP Brine 0 365
1991 GORDON ENERGY CORP Brine 0 310
1996 G-R CONTRACTING INC Brine 0 365
1997 G-R CONTRACTING INC Brine 0 365
1998 G-R CONTRACTING INC Brine 0 365
2000 G-R CONTRACTING INC Brine 0 365
2001 G-R CONTRACTING INC Brine 0 365
2002 G-R CONTRACTING INC Brine 0 365
2003 G-R CONTRACTING INC Brine 0 365
2004 G-R CONTRACTING INC Brine 0 365
2005 G-R CONTRACTING INC Brine 0 365
2006 G-R CONTRACTING INC Brine 0 365
2007 G-R CONTRACTING INC Brine 0 365
2008 G-R CONTRACTING INC Brine 0 365
2009 G-R CONTRACTING INC Brine 0 365
2010 G-R CONTRACTING INC Brine 0 365
2011 G-R CONTRACTING INC Brine 0 365
2012 G-R CONTRACTING INC Brine 0 366
2013 G-R CONTRACTING INC Brine 0 365
2014 G-R CONTRACTING INC Brine 0 365
2015 G-R CONTRACTING INC Brine 0 365
2016 G-R CONTRACTING INC Brine 0 365
2017 G-R CONTRACTING INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
000PL10207 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0525389562 2018-01-22 Production Wells No Violations On this day, I found the well equipped with 8.625 inch diameter surface casing, 4.5 inch diameter production casing with the valve open, 2 inch diameter tubing with the valve open, and produced by a plunger lift system. A gas regulator is connected to the 4.5 inch casing with a 0.25 inch diameter copper line. There is (1) 100 barrel steel tank, vertical separator, and drip tank all contained within an earthen dike. The production facility is shared with permit number 2-2204. The well is properly identified and the production records are current.
525389562 2018-1-22 0:00: PW No Violations 0.50
PL10207 PL No Violations

For data sources see[9]

References