X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-23409"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-23409
 
| Well ID: 34-111-23409
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.825899060, -81.21189124 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.82, -81.21 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 11: Line 11:
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
|-
 
|-
| Municipality: [[Malaga,_Monroe_County,_Ohio|Malaga]]
+
| Municipality: [[Malaga_Township,_Monroe_County,_Ohio|Malaga Township]]
 
|-
 
|-
 
| Operator Name: [[G-R CONTRACTING INC]]
 
| Operator Name: [[G-R CONTRACTING INC]]
Line 29: Line 29:
 
| Final Drill Date: 1989-05-09
 
| Final Drill Date: 1989-05-09
 
|-
 
|-
| Well Total Depth: 2350 ft
+
| Well Total Depth: 2350.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.825899060
+
| Latitude: 39.820000
 
|-
 
|-
| Longitude: -81.21189124
+
| Longitude: -81.210000
 
|}
 
|}
For data sources see<ref name=RBDMS>{{cite web
+
For data sources see<ref>{{cite web
  | title = RBDMS
+
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| CO
 +
| 1989-03-15
 +
| 2107  GORDON ENERGY CORP  GeoDate  3/15/89
 +
|-
 +
| Oil and Gas
 +
| 1989-03-15
 +
| Issued Date 3/15/89 Expired Date 3/15/90 Acres 0020000 Tool Type RTA Proposed Formation BEREA/OH SH Proposed Depth 02350 Proposed Drill Depth 02350
 +
|-
 +
| Original Spud
 +
| 1989-05-03
 +
|
 +
|-
 +
| Completed
 +
| 1989-05-09
 +
|
 +
|-
 +
| Reached Total Depth
 +
| 1989-05-09
 +
|
 +
|-
 +
| Completion Report Received
 +
| 1989-07-11
 +
|
 +
|-
 +
| Construction Permit Expires
 +
| 1990-03-15
 +
|
 +
|-
 +
| CO
 +
| 1992-09-09
 +
| 952  G-R CONTRACTING INC  GeoDate  3/15/89
 +
|-
 +
| Record Last Modified
 +
| 2017-02-15
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
{| class="wikitable sortable" style="width: 50%"
+
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Interval Top (ft)
 
!scope="col" style="text-align: center"| Interval Top (ft)
Line 54: Line 103:
 
| style="text-align: right;" | 1910
 
| style="text-align: right;" | 1910
 
| style="text-align: right;" | 12
 
| style="text-align: right;" | 12
 +
|-
 +
|
 +
| style="text-align: right;" | 1902
 +
| style="text-align: right;" | 1911
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-06-29
 
| 1997-06-29
 +
| style="text-align: right;" | 1902
 +
| style="text-align: right;" | 1911
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 +
| style="text-align: right;" | 1904
 +
| style="text-align: right;" | 1910
 +
| style="text-align: right;" | 12
 +
|-
 +
|
 
| style="text-align: right;" | 1902
 
| style="text-align: right;" | 1902
 
| style="text-align: right;" | 1911
 
| style="text-align: right;" | 1911
Line 66: Line 130:
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name = RBDMS/>
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 50000 Gal
 +
| style="text-align: right;" | 19000
 +
|
 +
| BEREA
 +
|-
 +
|
 +
| ACID
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 400 Gal
 +
| style="text-align: right;" | 0
 +
|
 +
| BEREA
 +
|-
 +
|
 +
| ACID
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 265 Gal
 +
| style="text-align: right;" | 0
 +
|
 +
| 2 STAGE FRAC:SAND/WATER/ACID
 +
|-
 +
|
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 56000 Gal
 +
| style="text-align: right;" | 26500
 +
|
 +
| GORDON
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 77: Line 219:
 
| 1991
 
| 1991
 
| [[GORDON ENERGY CORP]]
 
| [[GORDON ENERGY CORP]]
| style="text-align: right;" | 2335
+
| style="text-align: right;" | 2335.00
| style="text-align: right;" | 18
+
| style="text-align: right;" | 18.00
 
| style="text-align: right;" | 310
 
| style="text-align: right;" | 310
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1151
+
| style="text-align: right;" | 1151.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 942
+
| style="text-align: right;" | 942.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 774
+
| style="text-align: right;" | 774.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 250
+
| style="text-align: right;" | 250.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 840
+
| style="text-align: right;" | 840.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 331
+
| style="text-align: right;" | 331.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 478
+
| style="text-align: right;" | 478.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 525
+
| style="text-align: right;" | 525.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 338
+
| style="text-align: right;" | 338.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 492
+
| style="text-align: right;" | 492.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 419
+
| style="text-align: right;" | 419.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 508
+
| style="text-align: right;" | 508.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 298
+
| style="text-align: right;" | 298.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 281
+
| style="text-align: right;" | 281.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 164
+
| style="text-align: right;" | 164.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 222
+
| style="text-align: right;" | 222.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 78
+
| style="text-align: right;" | 78.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 179
+
| style="text-align: right;" | 179.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 365
+
| style="text-align: right;" | 365.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 489
+
| style="text-align: right;" | 489.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 267
+
| style="text-align: right;" | 267.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web
+
For data sources see<ref>{{cite web
  | title = Ohio Combined Annual Production Data
+
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 355: Line 503:
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name=RBDMS/><ref name=Annual_Prod/>
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 370: Line 529:
 
| No Violations
 
| No Violations
 
| Preliminary Restoration  done information from Data Point
 
| Preliminary Restoration  done information from Data Point
 +
|-
 +
| PL10134
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 381: Line 546:
 
|-
 
|-
 
|}-->
 
|}-->
For data sources see<ref name=RBDMS/>
+
For data sources see<ref>{{cite web
<!--== Fracking Activities ==
+
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
==== Fracking Jobs ====
+
|publisher = [[Ohio Department of Natural Resources]]
{| class="wikitable sortable" width="95%"
+
| date = 2020-11-16
!scope="col" style="text-align: center"| Job Number
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
!scope="col" style="text-align: center"| Job Start Date
+
| accessdate = 2020-11-16 }}</ref>
!scope="col" style="text-align: center"| Job End Date
 
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 
!scope="col" style="text-align: center"| Total Water Volume (gal)
 
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" style="width: 100%"
 
!scope="col" style="text-align: center"| Job Number
 
!scope="col" style="text-align: center"| Trade Name
 
!scope="col" style="text-align: center"| Supplier
 
!scope="col" style="text-align: center"| Purpose
 
!scope="col" style="text-align: center"| Ingredient Name
 
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 
!scope="col" style="text-align: center"| Additive Percentage by Mass
 
!scope="col" style="text-align: center"| Job Percentage by Mass
 
!scope="col" style="text-align: center"| Mass Used (lb)
 
|-
 
|}-->
 
 
 
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Stimulation Date
 
!scope="col" style="text-align: center"| Chemical Agent
 
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 
!scope="col" style="text-align: center"| Fracking Fluid Volume
 
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 
!scope="col" style="text-align: center"| Fracking Company
 
!scope="col" style="text-align: center"| Comments
 
|-
 
|  
 
| H2O
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 50000 Gal
 
| style="text-align: right;" | 19000
 
|
 
| BEREA
 
|-
 
|
 
| ACID
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 400 Gal
 
| style="text-align: right;" | 0
 
|
 
| BEREA
 
|-
 
|
 
| ACID
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 265 Gal
 
| style="text-align: right;" | 0
 
|
 
| 2 STAGE FRAC:SAND/WATER/ACID
 
|-
 
|
 
| H2O
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 56000 Gal
 
| style="text-align: right;" | 26500
 
|
 
| GORDON
 
|-
 
|}
 
For data sources see<ref name = RBDMS/>
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Well Status
 
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 
!scope="col" style="text-align: center"| Comment
 
|-
 
| CO
 
| 1989-03-15
 
| 2107  GORDON ENERGY CORP  GeoDate  3/15/89
 
|-
 
| Oil and Gas
 
| 1989-03-15
 
| Issued Date 3/15/89 Expired Date 3/15/90 Acres 0020000 Tool Type RTA Proposed Formation BEREA/OH SH Proposed Depth 02350 Proposed Drill Depth 02350
 
|-
 
| Original Spud
 
| 1989-05-03
 
|
 
|-
 
| Completed
 
| 1989-05-09
 
|
 
|-
 
| Reached Total Depth
 
| 1989-05-09
 
|
 
|-
 
| Completion Report Received
 
| 1989-07-11
 
|
 
|-
 
| Construction Permit Expires
 
| 1990-03-15
 
|
 
|-
 
| CO
 
| 1992-09-09
 
| 952  G-R CONTRACTING INC  GeoDate  3/15/89
 
|-
 
| Record Last Modified
 
| 2017-02-15
 
|
 
|-
 
|}
 
For data sources see<ref name=RBDMS/>
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 23:14, 11 January 2021

Well Details

Well ID: 34-111-23409
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Malaga Township
Operator Name: G-R CONTRACTING INC
Well Pad ID:
Farm/Lease Name: AKERMAN EDWARD JR
License Status: Producing
License Date: 1989-03-15
Spud Date: 1989-05-03
Spud Drilling Contractor: G-R CONTRACTING
Final Drill Date: 1989-05-09
Well Total Depth: 2350.00 ft
Configuration: Vertical
Latitude: 39.820000
Longitude: -81.210000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1989-03-15 2107 GORDON ENERGY CORP GeoDate 3/15/89
Oil and Gas 1989-03-15 Issued Date 3/15/89 Expired Date 3/15/90 Acres 0020000 Tool Type RTA Proposed Formation BEREA/OH SH Proposed Depth 02350 Proposed Drill Depth 02350
Original Spud 1989-05-03
Completed 1989-05-09
Reached Total Depth 1989-05-09
Completion Report Received 1989-07-11
Construction Permit Expires 1990-03-15
CO 1992-09-09 952 G-R CONTRACTING INC GeoDate 3/15/89
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 1904 1910 12
1902 1911 0
1997-06-29 1902 1911 0
1904 1910 12
1902 1911 0
2006-09-11 2184 2204 16

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 50000 Gal 19000 BEREA
ACID 0 400 Gal 0 BEREA
ACID 0 265 Gal 0 2 STAGE FRAC:SAND/WATER/ACID
H2O 0 56000 Gal 26500 GORDON

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 GORDON ENERGY CORP 2335.00 18.00 310
1996 G-R CONTRACTING INC 1151.00 0.00 365
1997 G-R CONTRACTING INC 942.00 0.00 365
1998 G-R CONTRACTING INC 774.00 0.00 365
2000 G-R CONTRACTING INC 250.00 0.00 365
2001 G-R CONTRACTING INC 840.00 0.00 365
2002 G-R CONTRACTING INC 331.00 0.00 365
2003 G-R CONTRACTING INC 478.00 0.00 365
2004 G-R CONTRACTING INC 525.00 0.00 365
2005 G-R CONTRACTING INC 338.00 0.00 365
2006 G-R CONTRACTING INC 492.00 0.00 365
2007 G-R CONTRACTING INC 419.00 0.00 365
2008 G-R CONTRACTING INC 508.00 0.00 365
2009 G-R CONTRACTING INC 298.00 0.00 365
2010 G-R CONTRACTING INC 281.00 0.00 365
2011 G-R CONTRACTING INC 164.00 0.00 365
2012 G-R CONTRACTING INC 222.00 0.00 366
2013 G-R CONTRACTING INC 78.00 0.00 365
2014 G-R CONTRACTING INC 179.00 0.00 365
2015 G-R CONTRACTING INC 365.00 0.00 365
2016 G-R CONTRACTING INC 489.00 0.00 365
2017 G-R CONTRACTING INC 267.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 GORDON ENERGY CORP Brine 0 310
1996 G-R CONTRACTING INC Brine 0 365
1997 G-R CONTRACTING INC Brine 0 365
1998 G-R CONTRACTING INC Brine 0 365
2000 G-R CONTRACTING INC Brine 0 365
2001 G-R CONTRACTING INC Brine 0 365
2002 G-R CONTRACTING INC Brine 0 365
2003 G-R CONTRACTING INC Brine 0 365
2004 G-R CONTRACTING INC Brine 0 365
2005 G-R CONTRACTING INC Brine 0 365
2006 G-R CONTRACTING INC Brine 0 365
2007 G-R CONTRACTING INC Brine 0 365
2008 G-R CONTRACTING INC Brine 0 365
2009 G-R CONTRACTING INC Brine 0 365
2010 G-R CONTRACTING INC Brine 0 365
2011 G-R CONTRACTING INC Brine 0 365
2012 G-R CONTRACTING INC Brine 0 366
2013 G-R CONTRACTING INC Brine 0 365
2014 G-R CONTRACTING INC Brine 0 365
2015 G-R CONTRACTING INC Brine 0 365
2016 G-R CONTRACTING INC Brine 0 365
2017 G-R CONTRACTING INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
000PL10134 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
PL10134 PL No Violations

For data sources see[9]

References