X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-23533"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-23533
 
| Well ID: 34-111-23533
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.836838642, -81.30901777 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.83, -81.3 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 29: Line 29:
 
| Final Drill Date: 1990-05-09
 
| Final Drill Date: 1990-05-09
 
|-
 
|-
| Well Total Depth: 2009 ft
+
| Well Total Depth: 2009.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.836838642
+
| Latitude: 39.830000
 
|-
 
|-
| Longitude: -81.30901777
+
| Longitude: -81.300000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 85: Line 85:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 99: Line 99:
 
| style="text-align: right;" | 1692
 
| style="text-align: right;" | 1692
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 +
|-
 +
|
 +
| style="text-align: right;" | 1682
 +
| style="text-align: right;" | 1692
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-06-29
 
| 1997-06-29
 +
| style="text-align: right;" | 1682
 +
| style="text-align: right;" | 1692
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 +
| style="text-align: right;" | 1683
 +
| style="text-align: right;" | 1692
 +
| style="text-align: right;" | 17
 +
|-
 +
|
 
| style="text-align: right;" | 1682
 
| style="text-align: right;" | 1682
 
| style="text-align: right;" | 1692
 
| style="text-align: right;" | 1692
Line 119: Line 134:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 168: Line 183:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 181: Line 196:
 
| 1996
 
| 1996
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 2105
+
| style="text-align: right;" | 2105.00
| style="text-align: right;" | 76
+
| style="text-align: right;" | 76.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 2014
+
| style="text-align: right;" | 2014.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1769
+
| style="text-align: right;" | 1769.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 607
+
| style="text-align: right;" | 607.00
| style="text-align: right;" | 77
+
| style="text-align: right;" | 77.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1910
+
| style="text-align: right;" | 1910.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 929
+
| style="text-align: right;" | 929.00
| style="text-align: right;" | 71
+
| style="text-align: right;" | 71.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 804
+
| style="text-align: right;" | 804.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 836
+
| style="text-align: right;" | 836.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 870
+
| style="text-align: right;" | 870.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1171
+
| style="text-align: right;" | 1171.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 678
+
| style="text-align: right;" | 678.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1310
+
| style="text-align: right;" | 1310.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1252
+
| style="text-align: right;" | 1252.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1305
+
| style="text-align: right;" | 1305.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1126
+
| style="text-align: right;" | 1126.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1445
+
| style="text-align: right;" | 1445.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1211
+
| style="text-align: right;" | 1211.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 3469
+
| style="text-align: right;" | 3469.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 4180
+
| style="text-align: right;" | 4180.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 3024
+
| style="text-align: right;" | 3024.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 309: Line 324:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 456: Line 471:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 479: Line 494:
 
| No Violations
 
| No Violations
 
| Preliminary Restoration  done information from Data Point
 
| Preliminary Restoration  done information from Data Point
 +
|-
 +
| PL10049
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 493: Line 514:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 22:22, 11 January 2021

Well Details

Well ID: 34-111-23533
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: G-R CONTRACTING INC
Well Pad ID:
Farm/Lease Name: RUBEL-TWINEM
License Status: Producing
License Date: 1990-03-01
Spud Date: 1990-05-03
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 1990-05-09
Well Total Depth: 2009.00 ft
Configuration: Vertical
Latitude: 39.830000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1990-03-01 952 G-R CONTRACTING INC GeoDate 3/1/90
Oil and Gas 1990-03-01 Issued Date 3/1/90 Expired Date 3/1/91 Acres 0020000 Tool Type RTA Proposed Formation BEREA/GORDON Proposed Depth 02009 Proposed Drill Depth 02009
Original Spud 1990-05-01
Completed 1990-05-09
Reached Total Depth 1990-05-09
Completion Report Received 1990-11-21
Construction Permit Expires 1991-03-01
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 1683 1692 17
1682 1692 0
1997-06-29 1682 1692 0
1683 1692 17
1682 1692 0
2006-09-11 1953 1963 1
2006-09-11 1798 1800 5

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 0 0 2 STAGE FRAC:WATER/SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1996 G-R CONTRACTING INC 2105.00 76.00 365
1997 G-R CONTRACTING INC 2014.00 0.00 365
1998 G-R CONTRACTING INC 1769.00 0.00 365
2000 G-R CONTRACTING INC 607.00 77.00 365
2001 G-R CONTRACTING INC 1910.00 0.00 365
2002 G-R CONTRACTING INC 929.00 71.00 365
2003 G-R CONTRACTING INC 804.00 0.00 365
2004 G-R CONTRACTING INC 836.00 0.00 365
2005 G-R CONTRACTING INC 870.00 0.00 365
2006 G-R CONTRACTING INC 1171.00 0.00 365
2007 G-R CONTRACTING INC 678.00 0.00 365
2008 G-R CONTRACTING INC 1310.00 0.00 365
2009 G-R CONTRACTING INC 1252.00 0.00 365
2010 G-R CONTRACTING INC 1305.00 0.00 365
2011 G-R CONTRACTING INC 1126.00 0.00 365
2012 G-R CONTRACTING INC 1445.00 0.00 366
2013 G-R CONTRACTING INC 1211.00 0.00 365
2014 G-R CONTRACTING INC 3469.00 0.00 365
2015 G-R CONTRACTING INC 4180.00 0.00 365
2016 G-R CONTRACTING INC 0.00 0.00 365
2017 G-R CONTRACTING INC 3024.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1996 G-R CONTRACTING INC Brine 0 365
1997 G-R CONTRACTING INC Brine 0 365
1998 G-R CONTRACTING INC Brine 0 365
2000 G-R CONTRACTING INC Brine 0 365
2001 G-R CONTRACTING INC Brine 0 365
2002 G-R CONTRACTING INC Brine 0 365
2003 G-R CONTRACTING INC Brine 0 365
2004 G-R CONTRACTING INC Brine 0 365
2005 G-R CONTRACTING INC Brine 0 365
2006 G-R CONTRACTING INC Brine 0 365
2007 G-R CONTRACTING INC Brine 0 365
2008 G-R CONTRACTING INC Brine 0 365
2009 G-R CONTRACTING INC Brine 0 365
2010 G-R CONTRACTING INC Brine 0 365
2011 G-R CONTRACTING INC Brine 0 365
2012 G-R CONTRACTING INC Brine 0 366
2013 G-R CONTRACTING INC Brine 0 365
2014 G-R CONTRACTING INC Brine 0 365
2015 G-R CONTRACTING INC Brine 0 365
2016 G-R CONTRACTING INC Brine 0 365
2017 G-R CONTRACTING INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
000PL10049 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
PL10049 PL No Violations

For data sources see[9]

References