If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-031-23380 | | Well ID: 34-031-23380 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.41, -81.99 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 11: | Line 11: | ||
| County: [[Coshocton_County,_Ohio|Coshocton]] | | County: [[Coshocton_County,_Ohio|Coshocton]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Clark_Township,_Coshocton_County,_Ohio|Clark Township]] |
|- | |- | ||
| Operator Name: [[MASON PRODUCING INC]] | | Operator Name: [[MASON PRODUCING INC]] | ||
Line 29: | Line 29: | ||
| Final Drill Date: 1980-04-30 | | Final Drill Date: 1980-04-30 | ||
|- | |- | ||
− | | Well Total Depth: 3583 ft | + | | Well Total Depth: 3583.00 ft |
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.410000 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.990000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Well History == | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 89: | Line 89: | ||
| title = Risk Based Data Management System - Well and WellHistry Tables | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Perforation Treatments == | == Perforation Treatments == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 100: | Line 100: | ||
|- | |- | ||
| 2006-09-11 | | 2006-09-11 | ||
+ | | style="text-align: right;" | 3502 | ||
+ | | style="text-align: right;" | 3549 | ||
+ | | style="text-align: right;" | 25 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 3502 | ||
+ | | style="text-align: right;" | 3549 | ||
+ | | style="text-align: right;" | 25 | ||
+ | |- | ||
+ | | | ||
| style="text-align: right;" | 3502 | | style="text-align: right;" | 3502 | ||
| style="text-align: right;" | 3549 | | style="text-align: right;" | 3549 | ||
Line 108: | Line 118: | ||
| title = Risk Based Data Management System - Perfs Table | | title = Risk Based Data Management System - Perfs Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 157: | Line 167: | ||
| title = Risk Based Data Management System - tblStimulation Table | | title = Risk Based Data Management System - tblStimulation Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 170: | Line 180: | ||
| 1984 | | 1984 | ||
| [[MASON JOHN C]] | | [[MASON JOHN C]] | ||
− | | style="text-align: right;" | 9993 | + | | style="text-align: right;" | 9993.00 |
− | | style="text-align: right;" | 1158 | + | | style="text-align: right;" | 1158.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1985 | | 1985 | ||
| [[MASON JOHN C]] | | [[MASON JOHN C]] | ||
− | | style="text-align: right;" | 8241 | + | | style="text-align: right;" | 8241.00 |
− | | style="text-align: right;" | 865 | + | | style="text-align: right;" | 865.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1986 | | 1986 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 3834 | + | | style="text-align: right;" | 3834.00 |
− | | style="text-align: right;" | 471 | + | | style="text-align: right;" | 471.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1987 | | 1987 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 4850 | + | | style="text-align: right;" | 4850.00 |
− | | style="text-align: right;" | 781 | + | | style="text-align: right;" | 781.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1988 | | 1988 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 3827 | + | | style="text-align: right;" | 3827.00 |
− | | style="text-align: right;" | 628 | + | | style="text-align: right;" | 628.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1989 | | 1989 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 3078 | + | | style="text-align: right;" | 3078.00 |
− | | style="text-align: right;" | 573 | + | | style="text-align: right;" | 573.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1990 | | 1990 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 2509 | + | | style="text-align: right;" | 2509.00 |
− | | style="text-align: right;" | 384 | + | | style="text-align: right;" | 384.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1991 | | 1991 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 5471 | + | | style="text-align: right;" | 5471.00 |
− | | style="text-align: right;" | 929 | + | | style="text-align: right;" | 929.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1992 | | 1992 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 1153 | + | | style="text-align: right;" | 1153.00 |
− | | style="text-align: right;" | 205 | + | | style="text-align: right;" | 205.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1993 | | 1993 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 744 | + | | style="text-align: right;" | 744.00 |
− | | style="text-align: right;" | 181 | + | | style="text-align: right;" | 181.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1994 | | 1994 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 751 | + | | style="text-align: right;" | 751.00 |
− | | style="text-align: right;" | 180 | + | | style="text-align: right;" | 180.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1995 | | 1995 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 451 | + | | style="text-align: right;" | 451.00 |
− | | style="text-align: right;" | 130 | + | | style="text-align: right;" | 130.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1996 | | 1996 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 184 | + | | style="text-align: right;" | 184.00 |
− | | style="text-align: right;" | 130 | + | | style="text-align: right;" | 130.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1997 | | 1997 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 349 | + | | style="text-align: right;" | 349.00 |
− | | style="text-align: right;" | 100 | + | | style="text-align: right;" | 100.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1998 | | 1998 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 659 | + | | style="text-align: right;" | 659.00 |
− | | style="text-align: right;" | 54 | + | | style="text-align: right;" | 54.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1999 | | 1999 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 551 | + | | style="text-align: right;" | 551.00 |
− | | style="text-align: right;" | 107 | + | | style="text-align: right;" | 107.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2000 | | 2000 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 667 | + | | style="text-align: right;" | 667.00 |
− | | style="text-align: right;" | 105 | + | | style="text-align: right;" | 105.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2001 | | 2001 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 545 | + | | style="text-align: right;" | 545.00 |
− | | style="text-align: right;" | 103 | + | | style="text-align: right;" | 103.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2002 | | 2002 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 49 | + | | style="text-align: right;" | 49.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 31 | | style="text-align: right;" | 31 | ||
|- | |- | ||
| 2003 | | 2003 | ||
| [[MASON DRILLING INC]] | | [[MASON DRILLING INC]] | ||
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2004 | | 2004 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 471 | + | | style="text-align: right;" | 471.00 |
− | | style="text-align: right;" | 25 | + | | style="text-align: right;" | 25.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2005 | | 2005 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 473 | + | | style="text-align: right;" | 473.00 |
− | | style="text-align: right;" | 48 | + | | style="text-align: right;" | 48.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2006 | | 2006 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 599 | + | | style="text-align: right;" | 599.00 |
− | | style="text-align: right;" | 49 | + | | style="text-align: right;" | 49.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2007 | | 2007 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 447 | + | | style="text-align: right;" | 447.00 |
− | | style="text-align: right;" | 42 | + | | style="text-align: right;" | 42.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2008 | | 2008 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 256 | + | | style="text-align: right;" | 256.00 |
− | | style="text-align: right;" | 22 | + | | style="text-align: right;" | 22.00 |
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
|- | |- | ||
| 2009 | | 2009 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 258 | + | | style="text-align: right;" | 258.00 |
− | | style="text-align: right;" | 48 | + | | style="text-align: right;" | 48.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2010 | | 2010 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 305 | + | | style="text-align: right;" | 305.00 |
− | | style="text-align: right;" | 25 | + | | style="text-align: right;" | 25.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2011 | | 2011 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 261 | + | | style="text-align: right;" | 261.00 |
− | | style="text-align: right;" | 48 | + | | style="text-align: right;" | 48.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2012 | | 2012 | ||
| [[MASON PRODUCING INC]] | | [[MASON PRODUCING INC]] | ||
− | | style="text-align: right;" | 283 | + | | style="text-align: right;" | 283.00 |
− | | style="text-align: right;" | 25 | + | | style="text-align: right;" | 25.00 |
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
|- | |- | ||
Line 346: | Line 356: | ||
| title = Risk Based Data Management System - Production Table - Oil and Gas Data | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<ref>{{cite web | <ref>{{cite web | ||
| title = Combined Production - Oil and Gas Data | | title = Combined Production - Oil and Gas Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
Line 541: | Line 551: | ||
| title = Risk Based Data Management System - Production Table - Brine Data | | title = Risk Based Data Management System - Production Table - Brine Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<ref>{{cite web | <ref>{{cite web | ||
| title = Combined Production - Brine Data | | title = Combined Production - Brine Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Inspection Data == | == Inspection Data == | ||
==== Inspections Performed ==== | ==== Inspections Performed ==== | ||
Line 558: | Line 568: | ||
!scope="col" style="text-align: center"| Inspection Result | !scope="col" style="text-align: center"| Inspection Result | ||
!scope="col" style="text-align: center"| Inspection Comments | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | -1280744810 | ||
+ | | 2013-6-24 0:00: | ||
+ | | FR | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -1738518395 | ||
+ | | 2011-4-8 0:00:0 | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -594130299 | ||
+ | | 2012-10-11 0:00 | ||
+ | | PB | ||
+ | | No Violations | ||
+ | | | ||
|- | |- | ||
| 0594130299 | | 0594130299 | ||
Line 608: | Line 636: | ||
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Ohio Wells]] | [[Category:Ohio Wells]] |
Well ID: 34-031-23380 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.41,"lon":-81.99,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Clark Township | |
Operator Name: MASON PRODUCING INC | |
Well Pad ID: | |
Farm/Lease Name: ALICE BICKEL | |
License Status: Final Restoration | |
License Date: 2012-05-22 | |
Spud Date: 1980-03-22 | |
Spud Drilling Contractor: | |
Final Drill Date: 1980-04-30 | |
Well Total Depth: 3583.00 ft | |
Configuration: Vertical | |
Latitude: 40.410000 | |
Longitude: -81.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1979-12-10 | 1983 MASON DRILLING INC GeoDate 12/10/79 |
Original Spud | 1980-03-22 | R.I. 12-19-79, R.L. 1-30-80, R.L. 4-23-80 |
Completed | 1980-04-30 | R.I. 12-19-79, R.L. 1-30-80, R.L. 4-23-80 |
Reached Total Depth | 1980-04-30 | R.I. 12-19-79, R.L. 1-30-80, R.L. 4-23-80 |
Change of Owner | 2002-12-30 | Operator changed from 1983, MASON DRILLING INC to 7333, MASON PRODUCING |
APP | 2012-05-22 | Proposed Formations:CLINTON, Issued Date:5/22/2012, Expired Date:5/22/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2012-10-11 | R.I. 12-19-79, R.L. 1-30-80, R.L. 4-23-80 |
Record Last Modified | 2013-07-02 | R.I. 12-19-79, R.L. 1-30-80, R.L. 4-23-80 |
Construction Permit Expires | 2014-05-22 | R.I. 12-19-79, R.L. 1-30-80, R.L. 4-23-80 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3502 | 3549 | 25 |
3502 | 3549 | 25 | |
3502 | 3549 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1300 Bbl | 25000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MASON JOHN C | 9993.00 | 1158.00 | 0 |
1985 | MASON JOHN C | 8241.00 | 865.00 | 365 |
1986 | MASON DRILLING INC | 3834.00 | 471.00 | 365 |
1987 | MASON DRILLING INC | 4850.00 | 781.00 | 365 |
1988 | MASON DRILLING INC | 3827.00 | 628.00 | 365 |
1989 | MASON DRILLING INC | 3078.00 | 573.00 | 365 |
1990 | MASON DRILLING INC | 2509.00 | 384.00 | 365 |
1991 | MASON DRILLING INC | 5471.00 | 929.00 | 365 |
1992 | MASON DRILLING INC | 1153.00 | 205.00 | 365 |
1993 | MASON DRILLING INC | 744.00 | 181.00 | 365 |
1994 | MASON DRILLING INC | 751.00 | 180.00 | 365 |
1995 | MASON DRILLING INC | 451.00 | 130.00 | 365 |
1996 | MASON DRILLING INC | 184.00 | 130.00 | 365 |
1997 | MASON DRILLING INC | 349.00 | 100.00 | 365 |
1998 | MASON DRILLING INC | 659.00 | 54.00 | 365 |
1999 | MASON DRILLING INC | 551.00 | 107.00 | 365 |
2000 | MASON DRILLING INC | 667.00 | 105.00 | 0 |
2001 | MASON DRILLING INC | 545.00 | 103.00 | 365 |
2002 | MASON PRODUCING INC | 49.00 | 0.00 | 31 |
2003 | MASON DRILLING INC | 0.00 | 0.00 | 365 |
2004 | MASON PRODUCING INC | 471.00 | 25.00 | 365 |
2005 | MASON PRODUCING INC | 473.00 | 48.00 | 365 |
2006 | MASON PRODUCING INC | 599.00 | 49.00 | 365 |
2007 | MASON PRODUCING INC | 447.00 | 42.00 | 365 |
2008 | MASON PRODUCING INC | 256.00 | 22.00 | 366 |
2009 | MASON PRODUCING INC | 258.00 | 48.00 | 365 |
2010 | MASON PRODUCING INC | 305.00 | 25.00 | 365 |
2011 | MASON PRODUCING INC | 261.00 | 48.00 | 365 |
2012 | MASON PRODUCING INC | 283.00 | 25.00 | 366 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MASON JOHN C | Brine | 0 | 0 |
1985 | MASON JOHN C | Brine | 31 | 365 |
1986 | MASON DRILLING INC | Brine | 25 | 365 |
1987 | MASON DRILLING INC | Brine | 35 | 365 |
1988 | MASON DRILLING INC | Brine | 30 | 365 |
1989 | MASON DRILLING INC | Brine | 22 | 365 |
1990 | MASON DRILLING INC | Brine | 38 | 365 |
1991 | MASON DRILLING INC | Brine | 29 | 365 |
1992 | MASON DRILLING INC | Brine | 10 | 365 |
1993 | MASON DRILLING INC | Brine | 3 | 365 |
1994 | MASON DRILLING INC | Brine | 8 | 365 |
1995 | MASON DRILLING INC | Brine | 0 | 365 |
1996 | MASON DRILLING INC | Brine | 0 | 365 |
1997 | MASON DRILLING INC | Brine | 15 | 365 |
1998 | MASON DRILLING INC | Brine | 5 | 365 |
1999 | MASON DRILLING INC | Brine | 365 | |
2000 | MASON DRILLING INC | Brine | 0 | |
2001 | MASON DRILLING INC | Brine | 3 | 365 |
2002 | MASON DRILLING INC | Brine | 0 | 334 |
2003 | MASON DRILLING INC | Brine | 0 | 365 |
2004 | MASON PRODUCING INC | Brine | 0 | 365 |
2005 | MASON PRODUCING INC | Brine | 0 | 365 |
2006 | MASON PRODUCING INC | Brine | 0 | 365 |
2007 | MASON PRODUCING INC | Brine | 3 | 365 |
2008 | MASON PRODUCING INC | Brine | 0 | 366 |
2009 | MASON PRODUCING INC | Brine | 0 | 365 |
2010 | MASON PRODUCING INC | Brine | 0 | 365 |
2011 | MASON PRODUCING INC | Brine | 0 | 365 |
2012 | MASON PRODUCING INC | Brine | 0 | 366 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1280744810 | 2013-6-24 0:00: | FR | No Violations | |
-1738518395 | 2011-4-8 0:00:0 | PW | No Violations | |
-594130299 | 2012-10-11 0:00 | PB | No Violations | |
0594130299 | 2012-10-11 | Plug / Plug Back | No Violations | On the day of my inspection I found that the fluid level was down to 200. Wheeler Drilling shoveled 7 tons of clay to fill the well to surface. They cut the casing off 30 below grade and capped the well with a steel plate inscribed with ODNR - 3380. |
1035856660 | 2012-10-10 | Plug / Plug Back | No Violations | On the day of my inspection I found that Wheeler Drilling set a brush/stone bridge at 1000. They pulled 470 of 8 casing and then shoveled 4 tons of clay into the well. A pre-cast concrete plug was set at 470 and then 4 tons of clay was shoveled into the well. Wheeler Drilling shut down for the day to let the clay settle overnight. |
1280744810 | 2013-06-24 | Final Restoration | No Violations | I received a fax copy of a signed landowner waiver for the final restoration of this well site. The pits are filled, the site is rough graded and the production equipment has been removed. All other restoration requirements have been waived by the landowner. This site passes final restoration. |
1350311487 | 2012-10-09 | Plug / Plug Back | No Violations | On the day of my inspection Wheeler Drilling ripped the 4.5 casing at 3210, pulled 8 joints and shoveled 4 tons of clay into the well. They pulled the rest of the 4.5 casing from the well, set a pre-cast concrete plug at 2488 and shoveled 5.5 tons of clay into the well. |
1484988577 | 2013-05-20 | Final Restoration | No Violations | On the day of my inspection I found that the area had been rough graded after the well was plugged and nothing else had been done to restore the area. The landowner approached me and claimed that he wanted to build on the site and he wanted the access road left in place. I informed him of his right to waive the restoration. I contacted Mason Producing, who claims they will get a landowner waiver form out to him as soon as possible. |
1738518395 | 2011-04-08 | Production Wells | No Violations | Rain most of the day. Pumping well equipped for production. |
For data sources see[9]