X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-169-22012"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-169-22012
 
| Well ID: 34-169-22012
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.965578110, -81.94643856 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.96, -81.94 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 9: Line 9:
 
| State: Ohio
 
| State: Ohio
 
|-
 
|-
| County: <County>
+
| County: [[Wayne_County,_Ohio|Wayne]]
 
|-
 
|-
| Municipality: [[Canaan Township,_Wayne_County,_Ohio|Canaan Township]]
+
| Municipality: [[Canaan_Township,_Wayne_County,_Ohio|Canaan Township]]
 
|-
 
|-
 
| Operator Name: [[HARLEY DRILLING & PRODUCING LT]]
 
| Operator Name: [[HARLEY DRILLING & PRODUCING LT]]
Line 29: Line 29:
 
| Final Drill Date: 1978-02-25
 
| Final Drill Date: 1978-02-25
 
|-
 
|-
| Well Total Depth: 3175 ft
+
| Well Total Depth: 3175.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 40.965578110
+
| Latitude: 40.960000
 
|-
 
|-
| Longitude: -81.94643856
+
| Longitude: -81.940000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 73: Line 73:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Perforation Treatments ==
 
<!--== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 130: Line 130:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 143: Line 143:
 
| 1984
 
| 1984
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2711
+
| style="text-align: right;" | 2711.00
| style="text-align: right;" | 713
+
| style="text-align: right;" | 713.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985
 
| 1985
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2771
+
| style="text-align: right;" | 2771.00
| style="text-align: right;" | 726
+
| style="text-align: right;" | 726.00
 
| style="text-align: right;" | 312
 
| style="text-align: right;" | 312
 
|-
 
|-
 
| 1986
 
| 1986
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 3590
+
| style="text-align: right;" | 3590.00
| style="text-align: right;" | 403
+
| style="text-align: right;" | 403.00
 
| style="text-align: right;" | 295
 
| style="text-align: right;" | 295
 
|-
 
|-
 
| 1987
 
| 1987
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2935
+
| style="text-align: right;" | 2935.00
| style="text-align: right;" | 685
+
| style="text-align: right;" | 685.00
 
| style="text-align: right;" | 285
 
| style="text-align: right;" | 285
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 3947
+
| style="text-align: right;" | 3947.00
| style="text-align: right;" | 559
+
| style="text-align: right;" | 559.00
 
| style="text-align: right;" | 215
 
| style="text-align: right;" | 215
 
|-
 
|-
 
| 1989
 
| 1989
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 3959
+
| style="text-align: right;" | 3959.00
| style="text-align: right;" | 398
+
| style="text-align: right;" | 398.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1990
 
| 1990
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2933
+
| style="text-align: right;" | 2933.00
| style="text-align: right;" | 472
+
| style="text-align: right;" | 472.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2885
+
| style="text-align: right;" | 2885.00
| style="text-align: right;" | 396
+
| style="text-align: right;" | 396.00
 
| style="text-align: right;" | 208
 
| style="text-align: right;" | 208
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2726
+
| style="text-align: right;" | 2726.00
| style="text-align: right;" | 396
+
| style="text-align: right;" | 396.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2250
+
| style="text-align: right;" | 2250.00
| style="text-align: right;" | 391
+
| style="text-align: right;" | 391.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 1825
+
| style="text-align: right;" | 1825.00
| style="text-align: right;" | 164
+
| style="text-align: right;" | 164.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 1485
+
| style="text-align: right;" | 1485.00
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2811
+
| style="text-align: right;" | 2811.00
| style="text-align: right;" | 318
+
| style="text-align: right;" | 318.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 2555
+
| style="text-align: right;" | 2555.00
| style="text-align: right;" | 161
+
| style="text-align: right;" | 161.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 3043
+
| style="text-align: right;" | 3043.00
| style="text-align: right;" | 331
+
| style="text-align: right;" | 331.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 1169
+
| style="text-align: right;" | 1169.00
| style="text-align: right;" | 159
+
| style="text-align: right;" | 159.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 1680
+
| style="text-align: right;" | 1680.00
| style="text-align: right;" | 173
+
| style="text-align: right;" | 173.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 524
+
| style="text-align: right;" | 524.00
| style="text-align: right;" | 163
+
| style="text-align: right;" | 163.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 37
+
| style="text-align: right;" | 37.00
| style="text-align: right;" | 159
+
| style="text-align: right;" | 159.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 142
+
| style="text-align: right;" | 142.00
| style="text-align: right;" | 168
+
| style="text-align: right;" | 168.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 21
+
| style="text-align: right;" | 21.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 164
+
| style="text-align: right;" | 164.00
| style="text-align: right;" | 308
+
| style="text-align: right;" | 308.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 239
+
| style="text-align: right;" | 239.00
| style="text-align: right;" | 182
+
| style="text-align: right;" | 182.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 151
+
| style="text-align: right;" | 151.00
| style="text-align: right;" | 155
+
| style="text-align: right;" | 155.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 359
+
| style="text-align: right;" | 359.00
| style="text-align: right;" | 167
+
| style="text-align: right;" | 167.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 160
+
| style="text-align: right;" | 160.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 188
+
| style="text-align: right;" | 188.00
| style="text-align: right;" | 108
+
| style="text-align: right;" | 108.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 560
+
| style="text-align: right;" | 560.00
| style="text-align: right;" | 105
+
| style="text-align: right;" | 105.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 317
+
| style="text-align: right;" | 317.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 567
+
| style="text-align: right;" | 567.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 372
+
| style="text-align: right;" | 372.00
| style="text-align: right;" | 165
+
| style="text-align: right;" | 165.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 523
+
| style="text-align: right;" | 523.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 753
+
| style="text-align: right;" | 753.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 701
+
| style="text-align: right;" | 701.00
| style="text-align: right;" | 118
+
| style="text-align: right;" | 118.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[HARLEY DRILLING & PRODUCING LT]]
 
| [[HARLEY DRILLING & PRODUCING LT]]
| style="text-align: right;" | 489
+
| style="text-align: right;" | 489.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 355: Line 355:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 586: Line 586:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 603: Line 603:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -130527653
 +
| 2016-3-15 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -585082595
 +
| 2017-4-25 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -70546199
 +
| 2018-4-23 0:00:
 +
| PW
 +
| No Violations
 +
|
 
|-
 
|-
 
| 0070546199
 
| 0070546199
Line 621: Line 639:
 
| No Violations
 
| No Violations
 
| Inspected production well on 04/25/2017.  The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator, located within an earthen dike.  Well identification is clearly displayed at the tank battery.  The well is equipped with a pump jack with an electric motor, and a compressor.  No problems were noted at the time of the inspection.
 
| Inspected production well on 04/25/2017.  The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator, located within an earthen dike.  Well identification is clearly displayed at the tank battery.  The well is equipped with a pump jack with an electric motor, and a compressor.  No problems were noted at the time of the inspection.
 +
|-
 +
| 2084533328
 +
| 2019-9-27 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| 2139764993
 +
| 2020-5-14 0:00:
 +
| PW
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 635: Line 665:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 05:51, 12 January 2021

Well Details

Well ID: 34-169-22012
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Canaan Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: COTTON JAMES R & ETHEL M
License Status: Producing
License Date: 1978-01-19
Spud Date: 1978-01-09
Spud Drilling Contractor:
Final Drill Date: 1978-02-25
Well Total Depth: 3175.00 ft
Configuration: Vertical
Latitude: 40.960000
Longitude: -81.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1978-01-09 FDT=GRAY
CO 1978-01-19 337 HARLEY DRILLING & PRODUCI GeoDate 1/19/78
Completed 1978-02-25 FDT=GRAY
Reached Total Depth 1978-02-25 FDT=GRAY
Record Last Modified 2019-06-04 FDT=GRAY

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 3000 Bbl 50000

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 HARLEY DRILLING & PRODUCING LT 2711.00 713.00 0
1985 HARLEY DRILLING & PRODUCING LT 2771.00 726.00 312
1986 HARLEY DRILLING & PRODUCING LT 3590.00 403.00 295
1987 HARLEY DRILLING & PRODUCING LT 2935.00 685.00 285
1988 HARLEY DRILLING & PRODUCING LT 3947.00 559.00 215
1989 HARLEY DRILLING & PRODUCING LT 3959.00 398.00 365
1990 HARLEY DRILLING & PRODUCING LT 2933.00 472.00 365
1991 HARLEY DRILLING & PRODUCING LT 2885.00 396.00 208
1992 HARLEY DRILLING & PRODUCING LT 2726.00 396.00 365
1993 HARLEY DRILLING & PRODUCING LT 2250.00 391.00 0
1994 HARLEY DRILLING & PRODUCING LT 1825.00 164.00 0
1995 HARLEY DRILLING & PRODUCING LT 1485.00 312.00 0
1996 HARLEY DRILLING & PRODUCING LT 2811.00 318.00 0
1997 HARLEY DRILLING & PRODUCING LT 2555.00 161.00 0
1998 HARLEY DRILLING & PRODUCING LT 3043.00 331.00 365
1999 HARLEY DRILLING & PRODUCING LT 1169.00 159.00 365
2000 HARLEY DRILLING & PRODUCING LT 1680.00 173.00 365
2001 HARLEY DRILLING & PRODUCING LT 524.00 163.00 365
2002 HARLEY DRILLING & PRODUCING LT 37.00 159.00 365
2003 HARLEY DRILLING & PRODUCING LT 142.00 168.00 365
2004 HARLEY DRILLING & PRODUCING LT 21.00 0.00 365
2005 HARLEY DRILLING & PRODUCING LT 164.00 308.00 365
2006 HARLEY DRILLING & PRODUCING LT 239.00 182.00 365
2007 HARLEY DRILLING & PRODUCING LT 151.00 155.00 365
2008 HARLEY DRILLING & PRODUCING LT 359.00 167.00 365
2009 HARLEY DRILLING & PRODUCING LT 160.00 0.00 365
2010 HARLEY DRILLING & PRODUCING LT 188.00 108.00 365
2011 HARLEY DRILLING & PRODUCING LT 560.00 105.00 365
2012 HARLEY DRILLING & PRODUCING LT 317.00 0.00 366
2013 HARLEY DRILLING & PRODUCING LT 567.00 0.00 365
2014 HARLEY DRILLING & PRODUCING LT 372.00 165.00 365
2015 HARLEY DRILLING & PRODUCING LT 523.00 0.00 365
2016 HARLEY DRILLING & PRODUCING LT 753.00 0.00 365
2017 HARLEY DRILLING & PRODUCING LT 701.00 118.00 365
2018 HARLEY DRILLING & PRODUCING LT 489.00 0.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 HARLEY DRILLING & PRODUCING LT Brine 0 0
1985 HARLEY DRILLING & PRODUCING LT Brine 0 312
1986 HARLEY DRILLING & PRODUCING LT Brine 0 295
1987 HARLEY DRILLING & PRODUCING LT Brine 0 285
1988 HARLEY DRILLING & PRODUCING LT Brine 0 215
1989 HARLEY DRILLING & PRODUCING LT Brine 0 365
1990 HARLEY DRILLING & PRODUCING LT Brine 0 365
1991 HARLEY DRILLING & PRODUCING LT Brine 0 208
1992 HARLEY DRILLING & PRODUCING LT Brine 0 365
1993 HARLEY DRILLING & PRODUCING LT Brine 0 0
1994 HARLEY DRILLING & PRODUCING LT Brine 0 0
1995 HARLEY DRILLING & PRODUCING LT Brine 0 0
1996 HARLEY DRILLING & PRODUCING LT Brine 228 0
1997 HARLEY DRILLING & PRODUCING LT Brine 0
1998 HARLEY DRILLING & PRODUCING LT Brine 0 365
1999 HARLEY DRILLING & PRODUCING LT Brine 0 365
2000 HARLEY DRILLING & PRODUCING LT Brine 0 365
2001 HARLEY DRILLING & PRODUCING LT Brine 0 365
2002 HARLEY DRILLING & PRODUCING LT Brine 0 365
2003 HARLEY DRILLING & PRODUCING LT Brine 0 365
2004 HARLEY DRILLING & PRODUCING LT Brine 0 365
2005 HARLEY DRILLING & PRODUCING LT Brine 0 365
2006 HARLEY DRILLING & PRODUCING LT Brine 0 365
2007 HARLEY DRILLING & PRODUCING LT Brine 0 365
2008 HARLEY DRILLING & PRODUCING LT Brine 0 365
2009 HARLEY DRILLING & PRODUCING LT Brine 0 365
2010 HARLEY DRILLING & PRODUCING LT Brine 0 365
2011 HARLEY DRILLING & PRODUCING LT Brine 0 365
2012 HARLEY DRILLING & PRODUCING LT Brine 0 366
2013 HARLEY DRILLING & PRODUCING LT Brine 0 365
2014 HARLEY DRILLING & PRODUCING LT Brine 5 365
2015 HARLEY DRILLING & PRODUCING LT Brine 0 365
2016 HARLEY DRILLING & PRODUCING LT Brine 0 365
2017 HARLEY DRILLING & PRODUCING LT Brine 0 365
2018 HARLEY DRILLING & PRODUCING LT Brine 0 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-130527653 2016-3-15 0:00: PW No Violations
-585082595 2017-4-25 0:00: PW No Violations
-70546199 2018-4-23 0:00: PW No Violations
0070546199 2018-04-23 Production Wells No Violations Inspected production well on 04/23/2018. The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor, a drip, and compressor. No problems were noted at the time of the inspection.
0130527653 2016-03-15 Production Wells No Violations Inspected production well on 03/15/2016. The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator located within a very shallow earthen dike. The dike needs built-up on the backside in order to effectively serve as containment in the case of a release. The well is equipped with a pump jack with an electric motor and a compressor. Well identification is posted at both the tank battery and the wellhead, but the API Number listed at the wellhead is incorrect. Jason Klauss with Harley Drilling was notified of both issues and will have them addressed promptly. No other problems were noted at the time of the inspection.
0585082595 2017-04-25 Production Wells No Violations Inspected production well on 04/25/2017. The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor, and a compressor. No problems were noted at the time of the inspection.
2084533328 2019-9-27 0:00: PW No Violations
2139764993 2020-5-14 0:00: PW No Violations

For data sources see[8]

References