If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-089-26113 | | Well ID: 34-089-26113 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.08, -82.56 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | Operator Name: [[ | + | | County: [[Licking_County,_Ohio|Licking]] |
+ | |- | ||
+ | | Municipality: [[Granville_Township,_Licking_County,_Ohio|Granville Township]] | ||
+ | |- | ||
+ | | Operator Name: [[DAVID R HILL INC]] | ||
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: KLARK UNIT |
|- | |- | ||
− | | | + | | License Status: Producing |
|- | |- | ||
− | | | + | | License Date: 2012-08-29 |
|- | |- | ||
| Spud Date: 2012-10-22 | | Spud Date: 2012-10-22 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[KILBARGER DRLG]] |
− | |||
− | |||
|- | |- | ||
− | | | + | | Final Drill Date: 2012-11-13 |
|- | |- | ||
− | | | + | | Well Total Depth: 4263.00 ft |
|- | |- | ||
− | | | + | | Configuration: Directional |
|- | |- | ||
− | | | + | | Latitude: 40.080000 |
|- | |- | ||
+ | | Longitude: -82.560000 | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | + | !scope="col" style="text-align: center"| Well Status |
− | + | !scope="col" style="width: 15%;text-align: center"| Well Status Date | |
− | !scope="col" | + | !scope="col" style="text-align: center"| Comment |
− | + | |- | |
− | !scope="col" | + | | APP |
− | + | | 2012-08-29 | |
− | + | | Proposed Formations:ROSE RUN/TREMPEALEAU, Issued Date:8/29/2012, Expired Date:8/29/2014 12:00:00 PM, Drilling unit acres:45.5336, Proposed Well Type:OG, Proposed Well Class:POOL | |
+ | |- | ||
+ | | Correction to Well | ||
+ | | 2012-11-02 | ||
+ | | CORRECTION TO UNIT SIZE, SURFACE AND TARGET X-Y COORDINATES--LAT/LONGS. | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
− | | | + | | 2012-11-13 |
| | | | ||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 2013-02-15 | ||
| | | | ||
+ | |- | ||
+ | | Correction to Well | ||
+ | | 2013-04-05 | ||
+ | | CORRECTION TO SURFACE INFORMATION: FOOTAGE FROM AS DRILLED SURVEY PLAT. CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. NO CHANGE TO UNIT SIZE. | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2014-08-29 | ||
| | | | ||
− | | | + | |- |
+ | | Correction to Well | ||
+ | | 2015-07-02 | ||
+ | | UPDATE TO UNIT SIZE AND SURFACE-TARGET INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-10-23 | ||
| | | | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
+ | |- | ||
+ | | 2013-02-21 | ||
+ | | style="text-align: right;" | 4066 | ||
+ | | style="text-align: right;" | 4082 | ||
+ | | style="text-align: right;" | 50 | ||
+ | |- | ||
+ | | 2013-02-21 | ||
+ | | style="text-align: right;" | 4035 | ||
+ | | style="text-align: right;" | 4050 | ||
+ | | style="text-align: right;" | 47 | ||
|- | |- | ||
− | |||
− | |||
− | |||
| | | | ||
+ | | style="text-align: right;" | 4035 | ||
+ | | style="text-align: right;" | 4050 | ||
+ | | style="text-align: right;" | 47 | ||
+ | |- | ||
| | | | ||
− | | style="text-align:right;" | | + | | style="text-align: right;" | 4066 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 4082 |
+ | | style="text-align: right;" | 50 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 4035 | ||
+ | | style="text-align: right;" | 4050 | ||
+ | | style="text-align: right;" | 47 | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Ohio Department of Natural Resources | + | | title = Risk Based Data Management System - Perfs Table |
− | | publisher = [http:// | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = 2015- | + | | date = 2020-11-16 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | == Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
+ | |- | ||
+ | | 2012-11-26 | ||
+ | | ACID | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 2000 Gal | ||
+ | | style="text-align: right;" | 0 | ||
+ | | [[Producers Service Corporation]] | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblStimulation Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 755.00 | ||
+ | | style="text-align: right;" | 272.00 | ||
+ | | style="text-align: right;" | 95 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 94173.00 | ||
+ | | style="text-align: right;" | 7187.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 76886.00 | ||
+ | | style="text-align: right;" | 8548.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 32128.00 | ||
+ | | style="text-align: right;" | 6744.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 34521.00 | ||
+ | | style="text-align: right;" | 6551.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 32349.00 | ||
+ | | style="text-align: right;" | 6560.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 95 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 40 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | + | |- |
− | + | | -1279143201 | |
+ | | 2020-8-6 0:00:0 | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | 0.50 | ||
+ | |- | ||
+ | | -2058462035 | ||
+ | | 2013-10-11 0:00 | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -890782552 | ||
+ | | 2013-10-16 0:00 | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | 0399616570 | ||
+ | | 2012-11-06 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | I inspected drilling operations today. Kilbarger tripping in drill pipe during inspection. No violations. | ||
+ | |- | ||
+ | | 0890782552 | ||
+ | | 2013-10-16 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | I inspected this location today. Dan Walker with Dave Hill Inc. was on location. During inspection the company was installing a combuster to flare gas being dumped off from the separator. The company is correcting a problem that was affecting a house south of the location. | ||
|- | |- | ||
| 1356703052 | | 1356703052 | ||
| 2012-10-25 | | 2012-10-25 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| Today I witnessed the cementing of the 8 surface casing for David R. Hill Inc. on Kilbarger rig 1. Universal Well Services was contracted to cement the casing. Circulation was established. Good cement returns were observed and cement stayed at the surface. No cement basket was used on the casing. | | Today I witnessed the cementing of the 8 surface casing for David R. Hill Inc. on Kilbarger rig 1. Universal Well Services was contracted to cement the casing. Circulation was established. Good cement returns were observed and cement stayed at the surface. No cement basket was used on the casing. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1358273694 | | 1358273694 | ||
| 2012-11-04 | | 2012-11-04 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | On 10/31/2012 John Suhar with David R. Hill Inc. called to inform me that the well was going crooked once they began drilling directionally. The plan was to set a cement plug through drill pipe to use as a kick off plug just below the surface casing. Universal Well Services was on location on 11/1/2012 to set a cement plug. The first plug was a 650 foot plug from 2300 | + | | No Violations |
− | + | | On 10/31/2012 John Suhar with David R. Hill Inc. called to inform me that the well was going crooked once they began drilling directionally. The plan was to set a cement plug through drill pipe to use as a kick off plug just below the surface casing. Universal Well Services was on location on 11/1/2012 to set a cement plug. The first plug was a 650 foot plug from 2300 to 1650 set with 50/50 poz. cement. The second plug was a 350 foot plug from 1390 to 1040 set with 50/50 poz. cement. The third plug was a 540 foot plug from 1040 to 500 set with Class A cement. All plugs were witnessed. Kilbarger waited 24 hours before they went back to drilling. Cement tickets are attached with surface tickets. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1382123228 | | 1382123228 | ||
| 2013-10-11 | | 2013-10-11 | ||
− | | | + | | Preliminary Restoration |
+ | | No Violations | ||
| This inspection was conducted as a preliminary restoration status check. The well was equipped with a rabbit wellhead. The well produces into (2) 100 barrel tanks inside an earthen dike. A gas separator sits outside of the tank battery. Each tank has a charcoal filter. Identification posted at the tank battery. The area has been restored. Restoration meets ORC 1509.072. | | This inspection was conducted as a preliminary restoration status check. The well was equipped with a rabbit wellhead. The well produces into (2) 100 barrel tanks inside an earthen dike. A gas separator sits outside of the tank battery. Each tank has a charcoal filter. Identification posted at the tank battery. The area has been restored. Restoration meets ORC 1509.072. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2002942919 | | 2002942919 | ||
| 2012-11-04 | | 2012-11-04 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| On 11/4/2012 I received a phone call from John Suhar with David R. Hill. He informed me that the well was going crooked again. Universal Well Services was contracted to set another cement kick off plug. I was not able to witness this job. Cement tickets are attached with the surface tickets. | | On 11/4/2012 I received a phone call from John Suhar with David R. Hill. He informed me that the well was going crooked again. Universal Well Services was contracted to set another cement kick off plug. I was not able to witness this job. Cement tickets are attached with the surface tickets. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2058462035 |
| 2013-10-11 | | 2013-10-11 | ||
− | | | + | | Production Wells |
− | | I inspected this location in regards to a complaint about a gas odor. The complainant, Mrs. Jobeth Fruechnicht, claims that her house was overtaken with a strong gas odor and was making her children ill. Mrs. | + | | No Violations |
− | + | | I inspected this location in regards to a complaint about a gas odor. The complainant, Mrs. Jobeth Fruechnicht, claims that her house was overtaken with a strong gas odor and was making her children ill. Mrs. Fruechnichts house is located just to the south of the well location. I inspected the location. My gas detector did not pick up any methane during inspection. I called and left a message for David R. Hill Inc. in regards to the complaint. During the inspection the pumper pulled in. He informed me what was happening was the separator was dumping gas in the tanks as the line pressure was too high to sell gas into and this was the reason for the gas odor. He explained that they were working on correcting the problem. I stopped by the complainants house and informed her that the company is working on the problem and should not be an issue in the future. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 2124071477 | | 2124071477 | ||
| 2012-10-23 | | 2012-10-23 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| I witnessed the cementing of the conductor casing today for David R. Hill Inc. on Kilbarger rig 1. Universal Well Service was on location to cement the casing. Circulation was established. Good cement returns were observed and stayed at the surface. No cement basket was used. | | I witnessed the cementing of the conductor casing today for David R. Hill Inc. on Kilbarger rig 1. Universal Well Service was on location to cement the casing. Circulation was established. Good cement returns were observed and stayed at the surface. No cement basket was used. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 399616570 | | 399616570 | ||
− | | 2012-11- | + | | 2012-11-6 0:00: |
− | | | + | | DD |
− | | | + | | No Violations |
− | |||
− | |||
| | | | ||
|- | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
|- | |- | ||
− | | - | + | |}--> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2020-11-16 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-089-26113 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.08,"lon":-82.56,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Granville Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: KLARK UNIT | |
License Status: Producing | |
License Date: 2012-08-29 | |
Spud Date: 2012-10-22 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2012-11-13 | |
Well Total Depth: 4263.00 ft | |
Configuration: Directional | |
Latitude: 40.080000 | |
Longitude: -82.560000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-08-29 | Proposed Formations:ROSE RUN/TREMPEALEAU, Issued Date:8/29/2012, Expired Date:8/29/2014 12:00:00 PM, Drilling unit acres:45.5336, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2012-11-02 | CORRECTION TO UNIT SIZE, SURFACE AND TARGET X-Y COORDINATES--LAT/LONGS. |
Reached Total Depth | 2012-11-13 | |
Completion Report Received | 2013-02-15 | |
Correction to Well | 2013-04-05 | CORRECTION TO SURFACE INFORMATION: FOOTAGE FROM AS DRILLED SURVEY PLAT. CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. NO CHANGE TO UNIT SIZE. |
Construction Permit Expires | 2014-08-29 | |
Correction to Well | 2015-07-02 | UPDATE TO UNIT SIZE AND SURFACE-TARGET INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-02-21 | 4066 | 4082 | 50 |
2013-02-21 | 4035 | 4050 | 47 |
4035 | 4050 | 47 | |
4066 | 4082 | 50 | |
4035 | 4050 | 47 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-11-26 | ACID | 15 | 2000 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | DAVID R HILL INC | 755.00 | 272.00 | 95 |
2014 | DAVID R HILL INC | 94173.00 | 7187.00 | 365 |
2015 | DAVID R HILL INC | 76886.00 | 8548.00 | 365 |
2016 | DAVID R HILL INC | 32128.00 | 6744.00 | 365 |
2017 | DAVID R HILL INC | 34521.00 | 6551.00 | 365 |
2018 | DAVID R HILL INC | 32349.00 | 6560.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | DAVID R HILL INC | Brine | 0 | 95 |
2014 | DAVID R HILL INC | Brine | 40 | 365 |
2015 | DAVID R HILL INC | Brine | 0 | 365 |
2016 | DAVID R HILL INC | Brine | 0 | 365 |
2017 | DAVID R HILL INC | Brine | 0 | 365 |
2018 | DAVID R HILL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1279143201 | 2020-8-6 0:00:0 | PW | No Violations | 0.50 |
-2058462035 | 2013-10-11 0:00 | PW | No Violations | |
-890782552 | 2013-10-16 0:00 | PW | No Violations | |
0399616570 | 2012-11-06 | Drill / Deepen / Reopen | No Violations | I inspected drilling operations today. Kilbarger tripping in drill pipe during inspection. No violations. |
0890782552 | 2013-10-16 | Production Wells | No Violations | I inspected this location today. Dan Walker with Dave Hill Inc. was on location. During inspection the company was installing a combuster to flare gas being dumped off from the separator. The company is correcting a problem that was affecting a house south of the location. |
1356703052 | 2012-10-25 | Drill / Deepen / Reopen | No Violations | Today I witnessed the cementing of the 8 surface casing for David R. Hill Inc. on Kilbarger rig 1. Universal Well Services was contracted to cement the casing. Circulation was established. Good cement returns were observed and cement stayed at the surface. No cement basket was used on the casing. |
1358273694 | 2012-11-04 | Drill / Deepen / Reopen | No Violations | On 10/31/2012 John Suhar with David R. Hill Inc. called to inform me that the well was going crooked once they began drilling directionally. The plan was to set a cement plug through drill pipe to use as a kick off plug just below the surface casing. Universal Well Services was on location on 11/1/2012 to set a cement plug. The first plug was a 650 foot plug from 2300 to 1650 set with 50/50 poz. cement. The second plug was a 350 foot plug from 1390 to 1040 set with 50/50 poz. cement. The third plug was a 540 foot plug from 1040 to 500 set with Class A cement. All plugs were witnessed. Kilbarger waited 24 hours before they went back to drilling. Cement tickets are attached with surface tickets. |
1382123228 | 2013-10-11 | Preliminary Restoration | No Violations | This inspection was conducted as a preliminary restoration status check. The well was equipped with a rabbit wellhead. The well produces into (2) 100 barrel tanks inside an earthen dike. A gas separator sits outside of the tank battery. Each tank has a charcoal filter. Identification posted at the tank battery. The area has been restored. Restoration meets ORC 1509.072. |
2002942919 | 2012-11-04 | Drill / Deepen / Reopen | No Violations | On 11/4/2012 I received a phone call from John Suhar with David R. Hill. He informed me that the well was going crooked again. Universal Well Services was contracted to set another cement kick off plug. I was not able to witness this job. Cement tickets are attached with the surface tickets. |
2058462035 | 2013-10-11 | Production Wells | No Violations | I inspected this location in regards to a complaint about a gas odor. The complainant, Mrs. Jobeth Fruechnicht, claims that her house was overtaken with a strong gas odor and was making her children ill. Mrs. Fruechnichts house is located just to the south of the well location. I inspected the location. My gas detector did not pick up any methane during inspection. I called and left a message for David R. Hill Inc. in regards to the complaint. During the inspection the pumper pulled in. He informed me what was happening was the separator was dumping gas in the tanks as the line pressure was too high to sell gas into and this was the reason for the gas odor. He explained that they were working on correcting the problem. I stopped by the complainants house and informed her that the company is working on the problem and should not be an issue in the future. |
2124071477 | 2012-10-23 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the conductor casing today for David R. Hill Inc. on Kilbarger rig 1. Universal Well Service was on location to cement the casing. Circulation was established. Good cement returns were observed and stayed at the surface. No cement basket was used. |
399616570 | 2012-11-6 0:00: | DD | No Violations |
For data sources see[9]