If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-031-27221 | | Well ID: 34-031-27221 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.18, -82.15 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | | + | | County: [[Coshocton_County,_Ohio|Coshocton]] |
|- | |- | ||
− | | | + | | Municipality: [[Pike_Township,_Coshocton_County,_Ohio|Pike Township]] |
|- | |- | ||
− | | | + | | Operator Name: [[WHEELER MICHAEL D]] |
|- | |- | ||
− | | | + | | Well Pad ID: |
|- | |- | ||
− | | | + | | Farm/Lease Name: HARRIS LOREN & BRENDA |
+ | |- | ||
+ | | License Status: Producing | ||
+ | |- | ||
+ | | License Date: 2013-07-29 | ||
|- | |- | ||
| Spud Date: 2014-01-09 | | Spud Date: 2014-01-09 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[WHEELER MICHAEL D]] |
+ | |- | ||
+ | | Final Drill Date: 2014-03-06 | ||
+ | |- | ||
+ | | Well Total Depth: 3128.00 ft | ||
+ | |- | ||
+ | | Configuration: Vertical | ||
+ | |- | ||
+ | | Latitude: 40.180000 | ||
|- | |- | ||
− | | | + | | Longitude: -82.150000 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2013-07-29 | ||
+ | | Proposed Formations:CLINTON, Issued Date:7/29/2013, Expired Date:7/29/2015 12:00:00 PM, Drilling unit acres:53.17, Proposed Well Type:OG, Proposed Well Class:POOL | ||
+ | |- | ||
+ | | Reached Total Depth | ||
+ | | 2014-03-06 | ||
+ | | | ||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 2014-05-16 | ||
+ | | | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2015-07-29 | ||
+ | | | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-15 | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <!--== Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | |}--> |
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
|- | |- | ||
− | | | + | |}--> |
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
|- | |- | ||
− | | | + | |}--> |
+ | == Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
|- | |- | ||
− | | | + | | 2014-05-12 |
+ | | H2O | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 61490 Gal | ||
+ | | style="text-align: right;" | 30000 | ||
+ | | [[Producers Service Corporation]] | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblStimulation Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Period |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Operator Name |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Production Days |
− | + | |- | |
− | + | | 2014 | |
+ | | [[MACKENCO INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 784.00 | ||
+ | | style="text-align: right;" | 200 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[MACKENCO INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 462.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[MACKENCO INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 230.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[MACKENCO INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 232.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[MACKENCO INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 27.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
− | {| class="wikitable sortable" | + | {| class="wikitable sortable" |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Period |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Operator Name |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Waste Type |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Quantity (bbl) |
− | + | !scope="col" style="text-align: center"| Production Days | |
− | + | |- | |
− | + | | 2014 | |
− | + | | [[MACKENCO INC]] | |
− | + | | Brine | |
+ | | style="text-align: right;" | 100 | ||
+ | | style="text-align: right;" | 200 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[MACKENCO INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 78 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[MACKENCO INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 27 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[MACKENCO INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 26 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[MACKENCO INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 27 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | ||
− | |||
|- | |- | ||
| -109178416 | | -109178416 | ||
− | | 2014- | + | | 2014-2-6 0:00:0 |
− | | | + | | DD |
− | | | + | | No Violations |
− | + | | | |
− | |||
− | | | ||
− | |||
|- | |- | ||
| -1385716914 | | -1385716914 | ||
− | | 2014- | + | | 2014-2-20 0:00: |
− | | | + | | DD |
− | | | + | | No Violations |
− | | | + | | |
− | |||
− | |||
− | |||
|- | |- | ||
| -1390914943 | | -1390914943 | ||
− | | 2013-12-23 | + | | 2013-12-23 0:00 |
− | | | + | | DD |
− | | | + | | No Violations |
− | + | | | |
− | |||
− | | | ||
|- | |- | ||
+ | | -1789891088 | ||
+ | | 2015-7-23 0:00: | ||
+ | | PL | ||
+ | | No Violations | ||
+ | | | ||
|- | |- | ||
| -179221657 | | -179221657 | ||
+ | | 2014-1-10 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -2134911099 | ||
+ | | 2015-5-14 0:00: | ||
+ | | PL | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | 0109178416 | ||
+ | | 2014-02-06 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 2310 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. | ||
+ | |- | ||
+ | | 0172215884 | ||
+ | | 2014-02-12 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 2600 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. | ||
+ | |- | ||
+ | | 0179221657 | ||
| 2014-01-10 | | 2014-01-10 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | On the day of my inspection I found that Wheeler Drilling had set 45 | + | | No Violations |
− | + | | On the day of my inspection I found that Wheeler Drilling had set 45 of 11.75 conductor. They were drilling at a depth of 60 with a 10.875 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. No violations at this time. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1049865265 | | 1049865265 | ||
| 2014-02-27 | | 2014-02-27 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 3040 | + | | No Violations |
− | + | | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 3040 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1051810004 | | 1051810004 | ||
| 2014-03-05 | | 2014-03-05 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | On the day of my inspection I found that Wheeler Drilling had set 3084 | + | | No Violations |
− | + | | On the day of my inspection I found that Wheeler Drilling had set 3084 of used, tested and drifted 4.5 casing cemented with 55 sacks of class A cement by Cemenco on 3/3/14. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site. | |
− | |||
− | |||
|- | |- | ||
+ | | 1385716914 | ||
+ | | 2014-02-20 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 2860 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. | ||
|- | |- | ||
| 1389023705 | | 1389023705 | ||
| 2014-01-06 | | 2014-01-06 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| On the day of my inspection I found that Wheeler Drilling was not drilling. The well will tentatively be spudded on Jan 8, 2014. The drilling operation is currently on hold due to inclement weather. | | On the day of my inspection I found that Wheeler Drilling was not drilling. The well will tentatively be spudded on Jan 8, 2014. The drilling operation is currently on hold due to inclement weather. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1389816109 | | 1389816109 | ||
| 2014-01-15 | | 2014-01-15 | ||
− | | | + | | Casing String Witnessed |
− | | On the day of my inspection Wheeler Drilling ran 473 | + | | No Violations |
− | + | | On the day of my inspection Wheeler Drilling ran 473 of used, tested and drifted 8.625 casing. Cemenco pumped 500 lbs of gel and 100 lbs of cotton seed hulls, followed by 135 sacks of class A cement. Circulation was established during displacement and was maintained through the remainder of the job. There were approximately 20 barrels of cement returns. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1389881290 | | 1389881290 | ||
| 2014-01-16 | | 2014-01-16 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| On the day of my inspection I witnessed the surface casing pressure test. The casing was pressured up to 300 psi and shut in for 30 minutes. Approximately 28 psi was lost during the test. The casing passed. Mackenco was authorized to resume drilling operations. | | On the day of my inspection I witnessed the surface casing pressure test. The casing was pressured up to 300 psi and shut in for 30 minutes. Approximately 28 psi was lost during the test. The casing passed. Mackenco was authorized to resume drilling operations. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1390315887 | | 1390315887 | ||
| 2014-01-21 | | 2014-01-21 | ||
− | | | + | | Casing String Witnessed |
− | | On the day of my inspection I found that Wheeler Drilling ran new 7 | + | | No Violations |
− | + | | On the day of my inspection I found that Wheeler Drilling ran new 7 intermediate casing to 883. Cemenco power-mudded the casing to surface. The permit was posted, there were no sags in the pit liner and I found no leaks or spills. | |
− | |||
− | |||
|- | |- | ||
+ | | 1390914943 | ||
+ | | 2013-12-23 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | On the day of my inspection I found that Wheeler Drilling was rigged up but not drilling. They had not spudded the well yet. The lease road was still under construction. | ||
|- | |- | ||
| 1390920801 | | 1390920801 | ||
| 2014-01-27 | | 2014-01-27 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 1500 | + | | No Violations |
− | + | | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 1500 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. No violations at this time. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1661613488 | | 1661613488 | ||
| 2013-12-12 | | 2013-12-12 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| On the day of my inspection I found that the location and lease road were cut. Wheeler Drilling was moving the drilling equipment into position, preparing to rig up. The drilling pit was not dug. | | On the day of my inspection I found that the location and lease road were cut. Wheeler Drilling was moving the drilling equipment into position, preparing to rig up. The drilling pit was not dug. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 172215884 | ||
+ | | 2014-2-12 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | 1789891088 | ||
+ | | 2015-07-23 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | On the day of my inspection I found that the site and the area bordering the lease road was growing with well established tall grasses and broadleaf vegetation. I found no signs of erosion. This site passes preliminary restoration. | ||
+ | |- | ||
+ | | 2011037493 | ||
+ | | 2014-09-29 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | On the day of my inspection I found that the pit had been closed, and the site had been graded and seeded. The grass growth was minimal. I found no drilling equipment or materials. The well was equipped with a pumping unit. The tank battery consisted of one 210 barrel storage tank, one 100 barrel brine tank and an earthen dike. Identification was posted and I found no leaks or spills. This site does not pass restoration at this time. | ||
|- | |- | ||
− | | | + | | 2134911099 |
− | | | + | | 2015-05-14 |
− | | | + | | Preliminary Restoration |
− | | On the day of my inspection I found that | + | | No Violations |
− | + | | On the day of my inspection I found that the site and lease road still had numerous bare spots and signs of erosion. I contacted Mac McConnell and told him that the restoration must be finished right away. | |
− | |||
− | |||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-031-27221 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.18,"lon":-82.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Pike Township | |
Operator Name: WHEELER MICHAEL D | |
Well Pad ID: | |
Farm/Lease Name: HARRIS LOREN & BRENDA | |
License Status: Producing | |
License Date: 2013-07-29 | |
Spud Date: 2014-01-09 | |
Spud Drilling Contractor: WHEELER MICHAEL D | |
Final Drill Date: 2014-03-06 | |
Well Total Depth: 3128.00 ft | |
Configuration: Vertical | |
Latitude: 40.180000 | |
Longitude: -82.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-29 | Proposed Formations:CLINTON, Issued Date:7/29/2013, Expired Date:7/29/2015 12:00:00 PM, Drilling unit acres:53.17, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-03-06 | |
Completion Report Received | 2014-05-16 | |
Construction Permit Expires | 2015-07-29 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-05-12 | H2O | 0 | 61490 Gal | 30000 | Producers Service Corporation |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | MACKENCO INC | 0.00 | 784.00 | 200 |
2015 | MACKENCO INC | 0.00 | 462.00 | 365 |
2016 | MACKENCO INC | 0.00 | 230.00 | 365 |
2017 | MACKENCO INC | 0.00 | 232.00 | 365 |
2018 | MACKENCO INC | 0.00 | 27.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | MACKENCO INC | Brine | 100 | 200 |
2015 | MACKENCO INC | Brine | 78 | 365 |
2016 | MACKENCO INC | Brine | 27 | 365 |
2017 | MACKENCO INC | Brine | 26 | 365 |
2018 | MACKENCO INC | Brine | 27 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-109178416 | 2014-2-6 0:00:0 | DD | No Violations | |
-1385716914 | 2014-2-20 0:00: | DD | No Violations | |
-1390914943 | 2013-12-23 0:00 | DD | No Violations | |
-1789891088 | 2015-7-23 0:00: | PL | No Violations | |
-179221657 | 2014-1-10 0:00: | DD | No Violations | |
-2134911099 | 2015-5-14 0:00: | PL | No Violations | |
0109178416 | 2014-02-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 2310 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. |
0172215884 | 2014-02-12 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 2600 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. |
0179221657 | 2014-01-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling had set 45 of 11.75 conductor. They were drilling at a depth of 60 with a 10.875 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. No violations at this time. |
1049865265 | 2014-02-27 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 3040 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. |
1051810004 | 2014-03-05 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling had set 3084 of used, tested and drifted 4.5 casing cemented with 55 sacks of class A cement by Cemenco on 3/3/14. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site. |
1385716914 | 2014-02-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 2860 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. |
1389023705 | 2014-01-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling was not drilling. The well will tentatively be spudded on Jan 8, 2014. The drilling operation is currently on hold due to inclement weather. |
1389816109 | 2014-01-15 | Casing String Witnessed | No Violations | On the day of my inspection Wheeler Drilling ran 473 of used, tested and drifted 8.625 casing. Cemenco pumped 500 lbs of gel and 100 lbs of cotton seed hulls, followed by 135 sacks of class A cement. Circulation was established during displacement and was maintained through the remainder of the job. There were approximately 20 barrels of cement returns. |
1389881290 | 2014-01-16 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed the surface casing pressure test. The casing was pressured up to 300 psi and shut in for 30 minutes. Approximately 28 psi was lost during the test. The casing passed. Mackenco was authorized to resume drilling operations. |
1390315887 | 2014-01-21 | Casing String Witnessed | No Violations | On the day of my inspection I found that Wheeler Drilling ran new 7 intermediate casing to 883. Cemenco power-mudded the casing to surface. The permit was posted, there were no sags in the pit liner and I found no leaks or spills. |
1390914943 | 2013-12-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling was rigged up but not drilling. They had not spudded the well yet. The lease road was still under construction. |
1390920801 | 2014-01-27 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling was drilling at a depth of 1500 with a 6.5 bit. The permit was posted and I found no leaks or spills. There were no sags or tears in the pit liner. No violations at this time. |
1661613488 | 2013-12-12 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the location and lease road were cut. Wheeler Drilling was moving the drilling equipment into position, preparing to rig up. The drilling pit was not dug. |
172215884 | 2014-2-12 0:00: | DD | No Violations | |
1789891088 | 2015-07-23 | Preliminary Restoration | No Violations | On the day of my inspection I found that the site and the area bordering the lease road was growing with well established tall grasses and broadleaf vegetation. I found no signs of erosion. This site passes preliminary restoration. |
2011037493 | 2014-09-29 | Preliminary Restoration | No Violations | On the day of my inspection I found that the pit had been closed, and the site had been graded and seeded. The grass growth was minimal. I found no drilling equipment or materials. The well was equipped with a pumping unit. The tank battery consisted of one 210 barrel storage tank, one 100 barrel brine tank and an earthen dike. Identification was posted and I found no leaks or spills. This site does not pass restoration at this time. |
2134911099 | 2015-05-14 | Preliminary Restoration | No Violations | On the day of my inspection I found that the site and lease road still had numerous bare spots and signs of erosion. I contacted Mac McConnell and told him that the restoration must be finished right away. |
For data sources see[8]