If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-169-23293 | | Well ID: 34-169-23293 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.69, -82.01 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 29: | Line 29: | ||
| Final Drill Date: 1982-07-09 | | Final Drill Date: 1982-07-09 | ||
|- | |- | ||
− | | Well Total Depth: 3255 ft | + | | Well Total Depth: 3255.00 ft |
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.690000 |
|- | |- | ||
− | | Longitude: -82. | + | | Longitude: -82.010000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Well History == | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 89: | Line 89: | ||
| title = Risk Based Data Management System - Well and WellHistry Tables | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Perforation Treatments == | == Perforation Treatments == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 100: | Line 100: | ||
|- | |- | ||
| 2006-09-11 | | 2006-09-11 | ||
+ | | style="text-align: right;" | 3070 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 18 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 3070 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 18 | ||
+ | |- | ||
+ | | | ||
| style="text-align: right;" | 3070 | | style="text-align: right;" | 3070 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 108: | Line 118: | ||
| title = Risk Based Data Management System - Perfs Table | | title = Risk Based Data Management System - Perfs Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 157: | Line 167: | ||
| title = Risk Based Data Management System - tblStimulation Table | | title = Risk Based Data Management System - tblStimulation Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 170: | Line 180: | ||
| 1987 | | 1987 | ||
| [[BUCKEYE CRUDE EXPL INC]] | | [[BUCKEYE CRUDE EXPL INC]] | ||
− | | style="text-align: right;" | 4038 | + | | style="text-align: right;" | 4038.00 |
− | | style="text-align: right;" | 69 | + | | style="text-align: right;" | 69.00 |
| style="text-align: right;" | 250 | | style="text-align: right;" | 250 | ||
|- | |- | ||
| 1990 | | 1990 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 571 | + | | style="text-align: right;" | 571.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1991 | | 1991 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 1465 | + | | style="text-align: right;" | 1465.00 |
− | | style="text-align: right;" | 63 | + | | style="text-align: right;" | 63.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1992 | | 1992 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 1627 | + | | style="text-align: right;" | 1627.00 |
− | | style="text-align: right;" | 77 | + | | style="text-align: right;" | 77.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1993 | | 1993 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 1119 | + | | style="text-align: right;" | 1119.00 |
− | | style="text-align: right;" | 41 | + | | style="text-align: right;" | 41.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1994 | | 1994 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 976 | + | | style="text-align: right;" | 976.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1995 | | 1995 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 999 | + | | style="text-align: right;" | 999.00 |
− | | style="text-align: right;" | 79 | + | | style="text-align: right;" | 79.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1996 | | 1996 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 625 | + | | style="text-align: right;" | 625.00 |
− | | style="text-align: right;" | 52 | + | | style="text-align: right;" | 52.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1997 | | 1997 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 272 | + | | style="text-align: right;" | 272.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1998 | | 1998 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 626 | + | | style="text-align: right;" | 626.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1999 | | 1999 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 839 | + | | style="text-align: right;" | 839.00 |
− | | style="text-align: right;" | 146 | + | | style="text-align: right;" | 146.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2000 | | 2000 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 737 | + | | style="text-align: right;" | 737.00 |
− | | style="text-align: right;" | 34 | + | | style="text-align: right;" | 34.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2001 | | 2001 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 525 | + | | style="text-align: right;" | 525.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2002 | | 2002 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 494 | + | | style="text-align: right;" | 494.00 |
− | | style="text-align: right;" | 61 | + | | style="text-align: right;" | 61.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2003 | | 2003 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 255 | + | | style="text-align: right;" | 255.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2004 | | 2004 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 157 | + | | style="text-align: right;" | 157.00 |
− | | style="text-align: right;" | 74 | + | | style="text-align: right;" | 74.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2005 | | 2005 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 200 | + | | style="text-align: right;" | 200.00 |
− | | style="text-align: right;" | 42 | + | | style="text-align: right;" | 42.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2006 | | 2006 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 240 | + | | style="text-align: right;" | 240.00 |
− | | style="text-align: right;" | 35 | + | | style="text-align: right;" | 35.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2007 | | 2007 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 246 | + | | style="text-align: right;" | 246.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2008 | | 2008 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 260 | + | | style="text-align: right;" | 260.00 |
− | | style="text-align: right;" | 52 | + | | style="text-align: right;" | 52.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2009 | | 2009 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 122 | + | | style="text-align: right;" | 122.00 |
− | | style="text-align: right;" | 30 | + | | style="text-align: right;" | 30.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2010 | | 2010 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 54 | + | | style="text-align: right;" | 54.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2011 | | 2011 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 131 | + | | style="text-align: right;" | 131.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2012 | | 2012 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 262 | + | | style="text-align: right;" | 262.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
|- | |- | ||
| 2013 | | 2013 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 264 | + | | style="text-align: right;" | 264.00 |
− | | style="text-align: right;" | 54 | + | | style="text-align: right;" | 54.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2014 | | 2014 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 267 | + | | style="text-align: right;" | 267.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2015 | | 2015 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 269 | + | | style="text-align: right;" | 269.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 308 | + | | style="text-align: right;" | 308.00 |
− | | style="text-align: right;" | 72 | + | | style="text-align: right;" | 72.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2017 | | 2017 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 256 | + | | style="text-align: right;" | 256.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2018 | | 2018 | ||
| [[JAMES R SMAIL INC]] | | [[JAMES R SMAIL INC]] | ||
− | | style="text-align: right;" | 264 | + | | style="text-align: right;" | 264.00 |
− | | style="text-align: right;" | 36 | + | | style="text-align: right;" | 36.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
Line 352: | Line 362: | ||
| title = Risk Based Data Management System - Production Table - Oil and Gas Data | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<ref>{{cite web | <ref>{{cite web | ||
| title = Combined Production - Oil and Gas Data | | title = Combined Production - Oil and Gas Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
Line 553: | Line 563: | ||
| title = Risk Based Data Management System - Production Table - Brine Data | | title = Risk Based Data Management System - Production Table - Brine Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<ref>{{cite web | <ref>{{cite web | ||
| title = Combined Production - Brine Data | | title = Combined Production - Brine Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Inspection Data == | == Inspection Data == | ||
==== Inspections Performed ==== | ==== Inspections Performed ==== | ||
Line 570: | Line 580: | ||
!scope="col" style="text-align: center"| Inspection Result | !scope="col" style="text-align: center"| Inspection Result | ||
!scope="col" style="text-align: center"| Inspection Comments | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | -1098033188 | ||
+ | | 2016-5-18 0:00: | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -353229502 | ||
+ | | 2020-4-21 0:00: | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | | ||
|- | |- | ||
| 00000PL999 | | 00000PL999 | ||
Line 600: | Line 622: | ||
| No Violations | | No Violations | ||
| This pumping unit well has no apparent problems nor compliance issues at this time. | | This pumping unit well has no apparent problems nor compliance issues at this time. | ||
+ | |- | ||
+ | | 399073369 | ||
+ | | 2014-7-1 0:00:0 | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | 0.50 | ||
+ | |- | ||
+ | | PL999 | ||
+ | | | ||
+ | | PL | ||
+ | | No Violations | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
Line 614: | Line 648: | ||
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Ohio Wells]] | [[Category:Ohio Wells]] |
Well ID: 34-169-23293 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.69,"lon":-82.01,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Clinton Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: SCHLABACH | |
License Status: Producing | |
License Date: 1982-04-08 | |
Spud Date: 1982-06-09 | |
Spud Drilling Contractor: MILLER DRILLING | |
Final Drill Date: 1982-07-09 | |
Well Total Depth: 3255.00 ft | |
Configuration: Vertical | |
Latitude: 40.690000 | |
Longitude: -82.010000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-04-08 | Issued Date 4/9/82 Expired Date 10/6/82 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03255 Proposed Drill Depth 03255 |
Original Spud | 1982-06-10 | |
Completed | 1982-07-09 | |
Reached Total Depth | 1982-07-09 | |
Completion Report Received | 1982-08-08 | |
CO | 1982-08-28 | 169 SMAIL JAMES R GeoDate 4/8/82 |
Construction Permit Expires | 1982-10-06 | |
Change of Owner | 2019-04-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-04-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3070 | 18 | |
3070 | 18 | ||
3070 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 50000 Gal | 30000 | FRAC: 50MG H2O, 30M SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | BUCKEYE CRUDE EXPL INC | 4038.00 | 69.00 | 250 |
1990 | JAMES R SMAIL INC | 571.00 | 0.00 | 365 |
1991 | JAMES R SMAIL INC | 1465.00 | 63.00 | 365 |
1992 | JAMES R SMAIL INC | 1627.00 | 77.00 | 365 |
1993 | JAMES R SMAIL INC | 1119.00 | 41.00 | 365 |
1994 | JAMES R SMAIL INC | 976.00 | 0.00 | 365 |
1995 | JAMES R SMAIL INC | 999.00 | 79.00 | 365 |
1996 | JAMES R SMAIL INC | 625.00 | 52.00 | 365 |
1997 | JAMES R SMAIL INC | 272.00 | 0.00 | 365 |
1998 | JAMES R SMAIL INC | 626.00 | 0.00 | 365 |
1999 | JAMES R SMAIL INC | 839.00 | 146.00 | 365 |
2000 | JAMES R SMAIL INC | 737.00 | 34.00 | 365 |
2001 | JAMES R SMAIL INC | 525.00 | 0.00 | 365 |
2002 | JAMES R SMAIL INC | 494.00 | 61.00 | 365 |
2003 | JAMES R SMAIL INC | 255.00 | 0.00 | 365 |
2004 | JAMES R SMAIL INC | 157.00 | 74.00 | 365 |
2005 | JAMES R SMAIL INC | 200.00 | 42.00 | 365 |
2006 | JAMES R SMAIL INC | 240.00 | 35.00 | 365 |
2007 | JAMES R SMAIL INC | 246.00 | 0.00 | 365 |
2008 | JAMES R SMAIL INC | 260.00 | 52.00 | 365 |
2009 | JAMES R SMAIL INC | 122.00 | 30.00 | 365 |
2010 | JAMES R SMAIL INC | 54.00 | 0.00 | 365 |
2011 | JAMES R SMAIL INC | 131.00 | 0.00 | 365 |
2012 | JAMES R SMAIL INC | 262.00 | 0.00 | 366 |
2013 | JAMES R SMAIL INC | 264.00 | 54.00 | 365 |
2014 | JAMES R SMAIL INC | 267.00 | 0.00 | 365 |
2015 | JAMES R SMAIL INC | 269.00 | 0.00 | 365 |
2016 | JAMES R SMAIL INC | 308.00 | 72.00 | 365 |
2017 | JAMES R SMAIL INC | 256.00 | 0.00 | 365 |
2018 | JAMES R SMAIL INC | 264.00 | 36.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | BUCKEYE CRUDE EXPL INC | Brine | 2 | 250 |
1990 | JAMES R SMAIL INC | Brine | 0 | 365 |
1991 | JAMES R SMAIL INC | Brine | 0 | 365 |
1992 | JAMES R SMAIL INC | Brine | 0 | 365 |
1993 | JAMES R SMAIL INC | Brine | 0 | 365 |
1994 | JAMES R SMAIL INC | Brine | 0 | 365 |
1995 | JAMES R SMAIL INC | Brine | 0 | 365 |
1996 | JAMES R SMAIL INC | Brine | 0 | 365 |
1997 | JAMES R SMAIL INC | Brine | 0 | 365 |
1998 | JAMES R SMAIL INC | Brine | 30 | 365 |
1999 | JAMES R SMAIL INC | Brine | 365 | |
2000 | JAMES R SMAIL INC | Brine | 15 | 365 |
2001 | JAMES R SMAIL INC | Brine | 365 | |
2002 | JAMES R SMAIL INC | Brine | 0 | 365 |
2003 | JAMES R SMAIL INC | Brine | 0 | 365 |
2004 | JAMES R SMAIL INC | Brine | 0 | 365 |
2005 | JAMES R SMAIL INC | Brine | 0 | 365 |
2006 | JAMES R SMAIL INC | Brine | 0 | 365 |
2007 | JAMES R SMAIL INC | Brine | 0 | 365 |
2008 | JAMES R SMAIL INC | Brine | 30 | 365 |
2009 | JAMES R SMAIL INC | Brine | 0 | 365 |
2010 | JAMES R SMAIL INC | Brine | 0 | 365 |
2011 | JAMES R SMAIL INC | Brine | 0 | 365 |
2012 | JAMES R SMAIL INC | Brine | 0 | 366 |
2013 | JAMES R SMAIL INC | Brine | 0 | 365 |
2014 | JAMES R SMAIL INC | Brine | 0 | 365 |
2015 | JAMES R SMAIL INC | Brine | 0 | 365 |
2016 | JAMES R SMAIL INC | Brine | 0 | 365 |
2017 | JAMES R SMAIL INC | Brine | 0 | 365 |
2018 | JAMES R SMAIL INC | Brine | 25 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1098033188 | 2016-5-18 0:00: | PW | No Violations | |
-353229502 | 2020-4-21 0:00: | PW | No Violations | |
00000PL999 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0399073369 | 2014-07-01 | Production Wells | No Violations | This is a pumping unit well. There are no apparent problems at this time. |
1098033188 | 2016-05-18 | Production Wells | No Violations | Inspected production well on 05/18/2016. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, and 1-underground brine vault, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor, a drip tank, and meter. No problems were noted at the time of the inspection. |
1120720290 | 2017-06-06 | Production Wells | No Violations | Inspected production well on 06/06/2017. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, and 1-underground brine vault, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor, and a drip and meter. No problems were noted at the time of the inspection. |
2142449785 | 2015-07-10 | Production Wells | No Violations | This pumping unit well has no apparent problems nor compliance issues at this time. |
399073369 | 2014-7-1 0:00:0 | PW | No Violations | 0.50 |
PL999 | PL | No Violations |
For data sources see[9]