X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-22807"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-22807
 
| Well ID: 34-153-22807
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.0870418554, -81.540852745 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.08, -81.54 | width=100% | height=100% }}
 
|-
 
|-
| County:
+
| Country: United States
 
|-
 
|-
| Municipality:
+
| State: Ohio
 
|-
 
|-
| Operator Name:
+
| County: <County>
 
|-
 
|-
| Well Pad ID:
+
| Municipality:  
 
|-
 
|-
| Farm/Lease Name:
+
| Operator Name: [[EVERFLOW EASTERN PARTNERS LP]]
 
|-
 
|-
| First Permit Date:
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date:
+
| Farm/Lease Name: ST JOSEPH UNIT
 +
|-
 +
| License Status: Producing
 +
|-
 +
| License Date: 1995-01-18
 
|-
 
|-
 
| Spud Date: 1995-01-26
 
| Spud Date: 1995-01-26
 
|-
 
|-
| Unconventional:
+
| Spud Drilling Contractor: [[J & J DIRECTIONAL SERVICE]]
 +
|-
 +
| Final Drill Date: 1995-02-12
 +
|-
 +
| Well Total Depth: 4498.00 ft
 +
|-
 +
| Configuration: Directional
 +
|-
 +
| Latitude: 41.080000
 +
|-
 +
| Longitude: -81.540000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| CO
 +
| 1995-01-18
 +
| 84  EVERFLOW EASTERN PTNS L P  GeoDate  1/18/95
 +
|-
 +
| Oil and Gas
 +
| 1995-01-18
 +
| Issued Date 1/18/95 Expired Date 1/18/96 Acres 0027770 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04498 Proposed Drill Depth 04498
 +
|-
 +
| Original Spud
 +
| 1995-01-26
 +
| CHG TGT/ COORDS 11-18-95
 +
|-
 +
| Completed
 +
| 1995-02-12
 +
| CHG TGT/ COORDS 11-18-95
 +
|-
 +
| Reached Total Depth
 +
| 1995-02-12
 +
| CHG TGT/ COORDS 11-18-95
 +
|-
 +
| Completion Report Received
 +
| 1995-02-24
 +
| CHG TGT/ COORDS 11-18-95
 +
|-
 +
| Construction Permit Expires
 +
| 1996-01-18
 +
| CHG TGT/ COORDS 11-18-95
 +
|-
 +
| Record Last Modified
 +
| 2017-02-15
 +
| CHG TGT/ COORDS 11-18-95
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 1997-06-29
 +
| style="text-align: right;" | 4216
 +
| style="text-align: right;" | 4322
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 +
| style="text-align: right;" | 4216
 +
| style="text-align: right;" | 4322
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-09-11
 +
| style="text-align: right;" | 4253
 +
| style="text-align: right;" | 4324
 +
| style="text-align: right;" | 75
 +
|-
 +
|
 +
| style="text-align: right;" | 4253
 +
| style="text-align: right;" | 4324
 +
| style="text-align: right;" | 75
 
|-
 
|-
| Horizontal:
+
|  
 +
| style="text-align: right;" | 4216
 +
| style="text-align: right;" | 4322
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Producing: No
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|-
| Violations: 0
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 
|-
 
|-
| Latitude: 41.0870418554
+
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| Longitude: -81.540852745
+
|  
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 120000 Gal
 +
| style="text-align: right;" | 80000
 +
|
 +
| FRAC W/120M GAL WATER & 80M# SAND
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | OIL QUANTITY
+
|-
!scope="col" | OIL PRODUCTION DAYS
+
| 1995
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 13883.00
 +
| style="text-align: right;" | 696.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1996
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 16737.00
 +
| style="text-align: right;" | 629.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1997
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 9165.00
 +
| style="text-align: right;" | 666.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1998
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 11415.00
 +
| style="text-align: right;" | 774.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1999
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 14351.00
 +
| style="text-align: right;" | 814.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2000
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 7219.00
 +
| style="text-align: right;" | 431.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2001
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 17317.00
 +
| style="text-align: right;" | 821.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2002
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 11268.00
 +
| style="text-align: right;" | 784.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2003
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 9190.00
 +
| style="text-align: right;" | 282.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2004
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 10894.00
 +
| style="text-align: right;" | 707.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2005
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 7340.00
 +
| style="text-align: right;" | 391.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2006
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 8484.00
 +
| style="text-align: right;" | 336.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2007
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 4069.00
 +
| style="text-align: right;" | 32.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2008
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 8294.00
 +
| style="text-align: right;" | 772.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2009
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 8669.00
 +
| style="text-align: right;" | 177.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2010
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 9257.00
 +
| style="text-align: right;" | 559.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2011
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 8619.00
 +
| style="text-align: right;" | 420.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2012
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 8233.00
 +
| style="text-align: right;" | 312.00
 +
| style="text-align: right;" | 366
 +
|-
 +
| 2013
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 6936.00
 +
| style="text-align: right;" | 192.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 6384.00
 +
| style="text-align: right;" | 219.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 5159.00
 +
| style="text-align: right;" | 13.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 4767.00
 +
| style="text-align: right;" | 180.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 3905.00
 +
| style="text-align: right;" | 90.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| style="text-align: right;" | 5045.00
 +
| style="text-align: right;" | 435.00
 +
| style="text-align: right;" | 365
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
{| class="wikitable sortable" width="95%"
+
{| class="wikitable sortable"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | TYPE
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | QUANTITY
+
!scope="col" style="text-align: center"| Waste Type
!scope="col" | UNITS
+
!scope="col" style="text-align: center"| Quantity (bbl)
!scope="col" | DISPOSAL METHOD
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | WASTE FACILITY PERMIT ID
+
|-
!scope="col" | WASTE FACILITY NAME
+
| 1995
!scope="col" | FACILITY CITY
+
| [[EVERFLOW EASTERN PARTNERS LP]]
!scope="col" | FACILITY STATE
+
| Brine
 +
| style="text-align: right;" | 2974
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1996
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 4307
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1997
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 3359
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1998
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 3685
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1999
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 3508
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2000
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 2817
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2001
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 3371
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2002
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 3307
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2003
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 2663
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2004
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 2858
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2005
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 2369
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2006
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 2467
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2007
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 1660
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2008
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 3016
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2009
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 1888
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2010
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 3177
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2011
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 2490
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2012
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 2315
 +
| style="text-align: right;" | 366
 +
|-
 +
| 2013
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 1976
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 1641
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 1444
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 1390
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 1374
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[EVERFLOW EASTERN PARTNERS LP]]
 +
| Brine
 +
| style="text-align: right;" | 2441
 +
| style="text-align: right;" | 365
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION_COMMENT
+
| -2024035067
 +
| 2016-3-15 0:00:
 +
| UP
 +
| No Violations
 +
|
 +
|-
 +
| 2024035067
 +
| 2016-03-15
 +
| UrbanProduction Wells
 +
| No Violations
 +
| The St. Joseph Unit # 1-D was completed on 2 / 1995. A review of RBDMS data base indicated that the well was current in the reporting of the production volumes. The well was constructed with 458 8.625 surface casing, 4471 of 4.5 production casing with 2.375 tubing and rods. The well was operated as an electric pump jack. The well was secured with a combination of privacy chain link and  wood fencing. The access was locked. The signage on the well was current and legible. The well head was free of leaks. The well was shut in and was being operated on a two (2) weeks on with three (3) months off cycle. An earthen dike surrounded the tank battery. The tank battery consisted of one (1) 210 barrel oil tank, one (1) 33 barrel poly brine tank and a mechanical horizontal separator. All load line were plugged and locked. The tank battery was fenced and locked with the required I.D. signage. The tank battery was leak free at the time of this inspection. No violations cited.
 +
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 06:47, 12 January 2021

Well Details

Well ID: 34-153-22807
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: ST JOSEPH UNIT
License Status: Producing
License Date: 1995-01-18
Spud Date: 1995-01-26
Spud Drilling Contractor: J & J DIRECTIONAL SERVICE
Final Drill Date: 1995-02-12
Well Total Depth: 4498.00 ft
Configuration: Directional
Latitude: 41.080000
Longitude: -81.540000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1995-01-18 84 EVERFLOW EASTERN PTNS L P GeoDate 1/18/95
Oil and Gas 1995-01-18 Issued Date 1/18/95 Expired Date 1/18/96 Acres 0027770 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04498 Proposed Drill Depth 04498
Original Spud 1995-01-26 CHG TGT/ COORDS 11-18-95
Completed 1995-02-12 CHG TGT/ COORDS 11-18-95
Reached Total Depth 1995-02-12 CHG TGT/ COORDS 11-18-95
Completion Report Received 1995-02-24 CHG TGT/ COORDS 11-18-95
Construction Permit Expires 1996-01-18 CHG TGT/ COORDS 11-18-95
Record Last Modified 2017-02-15 CHG TGT/ COORDS 11-18-95

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4216 4322 0
4216 4322 0
2006-09-11 4253 4324 75
4253 4324 75
4216 4322 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 120000 Gal 80000 FRAC W/120M GAL WATER & 80M# SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1995 EVERFLOW EASTERN PARTNERS LP 13883.00 696.00 365
1996 EVERFLOW EASTERN PARTNERS LP 16737.00 629.00 365
1997 EVERFLOW EASTERN PARTNERS LP 9165.00 666.00 365
1998 EVERFLOW EASTERN PARTNERS LP 11415.00 774.00 365
1999 EVERFLOW EASTERN PARTNERS LP 14351.00 814.00 365
2000 EVERFLOW EASTERN PARTNERS LP 7219.00 431.00 365
2001 EVERFLOW EASTERN PARTNERS LP 17317.00 821.00 365
2002 EVERFLOW EASTERN PARTNERS LP 11268.00 784.00 365
2003 EVERFLOW EASTERN PARTNERS LP 9190.00 282.00 365
2004 EVERFLOW EASTERN PARTNERS LP 10894.00 707.00 365
2005 EVERFLOW EASTERN PARTNERS LP 7340.00 391.00 365
2006 EVERFLOW EASTERN PARTNERS LP 8484.00 336.00 365
2007 EVERFLOW EASTERN PARTNERS LP 4069.00 32.00 365
2008 EVERFLOW EASTERN PARTNERS LP 8294.00 772.00 365
2009 EVERFLOW EASTERN PARTNERS LP 8669.00 177.00 365
2010 EVERFLOW EASTERN PARTNERS LP 9257.00 559.00 365
2011 EVERFLOW EASTERN PARTNERS LP 8619.00 420.00 365
2012 EVERFLOW EASTERN PARTNERS LP 8233.00 312.00 366
2013 EVERFLOW EASTERN PARTNERS LP 6936.00 192.00 365
2014 EVERFLOW EASTERN PARTNERS LP 6384.00 219.00 365
2015 EVERFLOW EASTERN PARTNERS LP 5159.00 13.00 365
2016 EVERFLOW EASTERN PARTNERS LP 4767.00 180.00 365
2017 EVERFLOW EASTERN PARTNERS LP 3905.00 90.00 365
2018 EVERFLOW EASTERN PARTNERS LP 5045.00 435.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1995 EVERFLOW EASTERN PARTNERS LP Brine 2974 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 4307 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 3359 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 3685 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 3508 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 2817 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 3371 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 3307 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 2663 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 2858 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 2369 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 2467 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 1660 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 3016 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 1888 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 3177 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 2490 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 2315 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 1976 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 1641 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 1444 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 1390 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 1374 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 2441 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2024035067 2016-3-15 0:00: UP No Violations
2024035067 2016-03-15 UrbanProduction Wells No Violations The St. Joseph Unit # 1-D was completed on 2 / 1995. A review of RBDMS data base indicated that the well was current in the reporting of the production volumes. The well was constructed with 458 8.625 surface casing, 4471 of 4.5 production casing with 2.375 tubing and rods. The well was operated as an electric pump jack. The well was secured with a combination of privacy chain link and wood fencing. The access was locked. The signage on the well was current and legible. The well head was free of leaks. The well was shut in and was being operated on a two (2) weeks on with three (3) months off cycle. An earthen dike surrounded the tank battery. The tank battery consisted of one (1) 210 barrel oil tank, one (1) 33 barrel poly brine tank and a mechanical horizontal separator. All load line were plugged and locked. The tank battery was fenced and locked with the required I.D. signage. The tank battery was leak free at the time of this inspection. No violations cited.

For data sources see[9]

References