X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-169-23995"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-169-23995
 
| Well ID: 34-169-23995
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.876670321, -81.95215426 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.87, -81.95 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 29: Line 29:
 
| Final Drill Date: 1987-05-09
 
| Final Drill Date: 1987-05-09
 
|-
 
|-
| Well Total Depth: 3520 ft
+
| Well Total Depth: 3520.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 40.876670321
+
| Latitude: 40.870000
 
|-
 
|-
| Longitude: -81.95215426
+
| Longitude: -81.950000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 90: Line 90:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 101: Line 101:
 
|-
 
|-
 
| 2006-09-11
 
| 2006-09-11
 +
| style="text-align: right;" | 3367
 +
| style="text-align: right;" | 3425
 +
| style="text-align: right;" | 21
 +
|-
 +
|
 +
| style="text-align: right;" | 3367
 +
| style="text-align: right;" | 3425
 +
| style="text-align: right;" | 21
 +
|-
 +
|
 
| style="text-align: right;" | 3367
 
| style="text-align: right;" | 3367
 
| style="text-align: right;" | 3425
 
| style="text-align: right;" | 3425
Line 109: Line 119:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 158: Line 168:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 171: Line 181:
 
| 1987
 
| 1987
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 3238
+
| style="text-align: right;" | 3238.00
| style="text-align: right;" | 158
+
| style="text-align: right;" | 158.00
 
| style="text-align: right;" | 152
 
| style="text-align: right;" | 152
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 6445
+
| style="text-align: right;" | 6445.00
| style="text-align: right;" | 150
+
| style="text-align: right;" | 150.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1989
 
| 1989
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 3738
+
| style="text-align: right;" | 3738.00
| style="text-align: right;" | 151
+
| style="text-align: right;" | 151.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1990
 
| 1990
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 2192
+
| style="text-align: right;" | 2192.00
| style="text-align: right;" | 70
+
| style="text-align: right;" | 70.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 2120
+
| style="text-align: right;" | 2120.00
| style="text-align: right;" | 70
+
| style="text-align: right;" | 70.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 741
+
| style="text-align: right;" | 741.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 985
+
| style="text-align: right;" | 985.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 279
+
| style="text-align: right;" | 279.00
| style="text-align: right;" | 61
+
| style="text-align: right;" | 61.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 10
+
| style="text-align: right;" | 10.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 22
+
| style="text-align: right;" | 22.00
| style="text-align: right;" | 42
+
| style="text-align: right;" | 42.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 51
+
| style="text-align: right;" | 51.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 35
+
| style="text-align: right;" | 35.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 157
+
| style="text-align: right;" | 157.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 283
+
| style="text-align: right;" | 283.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 749
+
| style="text-align: right;" | 749.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 787
+
| style="text-align: right;" | 787.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1051
+
| style="text-align: right;" | 1051.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 731
+
| style="text-align: right;" | 731.00
| style="text-align: right;" | 39
+
| style="text-align: right;" | 39.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 521
+
| style="text-align: right;" | 521.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 528
+
| style="text-align: right;" | 528.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 373
+
| style="text-align: right;" | 373.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 445
+
| style="text-align: right;" | 445.00
| style="text-align: right;" | 40
+
| style="text-align: right;" | 40.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 412
+
| style="text-align: right;" | 412.00
| style="text-align: right;" | 12
+
| style="text-align: right;" | 12.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 429
+
| style="text-align: right;" | 429.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 391
+
| style="text-align: right;" | 391.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 274
+
| style="text-align: right;" | 274.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 228
+
| style="text-align: right;" | 228.00
| style="text-align: right;" | 53
+
| style="text-align: right;" | 53.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 231
+
| style="text-align: right;" | 231.00
| style="text-align: right;" | 37
+
| style="text-align: right;" | 37.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 363
+
| style="text-align: right;" | 363.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 429
+
| style="text-align: right;" | 429.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 440
+
| style="text-align: right;" | 440.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 359: Line 369:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 566: Line 576:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 583: Line 593:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -14715297
 +
| 2017-5-15 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -1828113255
 +
| 2014-12-19 0:00
 +
| PW
 +
| No Violations
 +
| 0.50
 
|-
 
|-
 
| 00000PL572
 
| 00000PL572
Line 619: Line 641:
 
| No Violations
 
| No Violations
 
| Inspected production well on 12/31/2015.  The tank battery consists of 1-100 bbl steel tank, 1-horizontal separator, and 1-underground brine vault located within an earthen dike.  Well identification is clearly displayed at the tank battery.  The well is equipped with a pump jack with an electric motor.  No problems were noted at the time of the inspection.
 
| Inspected production well on 12/31/2015.  The tank battery consists of 1-100 bbl steel tank, 1-horizontal separator, and 1-underground brine vault located within an earthen dike.  Well identification is clearly displayed at the tank battery.  The well is equipped with a pump jack with an electric motor.  No problems were noted at the time of the inspection.
 +
|-
 +
| 2134556501
 +
| 2020-9-30 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| 346633602
 +
| 2018-3-13 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| PL572
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 633: Line 673:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 06:48, 12 January 2021

Well Details

Well ID: 34-169-23995
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Wayne Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: WEINMAN
License Status: Producing
License Date: 1984-11-28
Spud Date: 1987-05-06
Spud Drilling Contractor:
Final Drill Date: 1987-05-09
Well Total Depth: 3520.00 ft
Configuration: Vertical
Latitude: 40.870000
Longitude: -81.950000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1984-11-28 179 RIMCO OPERATING INC GeoDate 11/28/84
Oil and Gas 1984-11-28 Issued Date 11/28/84 Expired Date 5/27/85 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
Construction Permit Expires 1985-05-27 RI 3-21-87 PERMIT EXPIRED
Original Spud 1987-05-06 RI 3-21-87 PERMIT EXPIRED
Completed 1987-05-09 RI 3-21-87 PERMIT EXPIRED
Reached Total Depth 1987-05-09 RI 3-21-87 PERMIT EXPIRED
Change of Owner 2014-04-01 Operator changed from 179, RIMCO OPERATING INC to 169, SMAIL JAMES R INC

THIS WELL HAD BEEN ORIGNALLY PERMITTED BY RIMCO BUT REISSUED AND DRILLED BY SMAIL. THERE ARE NO CHANGE OF OWNER DOCUMENTS FROM RIMCO TO OR FROM SMAIL IN THE OWNER FILE. SMAIL HAS ALWAYS REPORTED PRODUCTION. I TRANSFERRED THE WELL TO SMAIL TODAY TO CORRECT THE OWNERSHIP. MM

Change of Owner 2019-04-29 Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2019-04-29 RI 3-21-87 PERMIT EXPIRED

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3367 3425 21
3367 3425 21
3367 3425 21

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 51000 Gal 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 JAMES R SMAIL INC 3238.00 158.00 152
1988 JAMES R SMAIL INC 6445.00 150.00 365
1989 JAMES R SMAIL INC 3738.00 151.00 365
1990 JAMES R SMAIL INC 2192.00 70.00 365
1991 JAMES R SMAIL INC 2120.00 70.00 365
1992 JAMES R SMAIL INC 741.00 0.00 365
1993 JAMES R SMAIL INC 985.00 0.00 365
1994 JAMES R SMAIL INC 279.00 61.00 365
1995 JAMES R SMAIL INC 10.00 0.00 365
1996 JAMES R SMAIL INC 22.00 42.00 365
1997 JAMES R SMAIL INC 51.00 0.00 365
1998 JAMES R SMAIL INC 35.00 0.00 365
1999 JAMES R SMAIL INC 157.00 0.00 365
2000 JAMES R SMAIL INC 283.00 0.00 365
2001 JAMES R SMAIL INC 749.00 0.00 365
2002 JAMES R SMAIL INC 787.00 0.00 365
2003 JAMES R SMAIL INC 1051.00 0.00 365
2004 JAMES R SMAIL INC 731.00 39.00 365
2005 JAMES R SMAIL INC 521.00 0.00 365
2006 JAMES R SMAIL INC 528.00 0.00 365
2007 JAMES R SMAIL INC 373.00 0.00 365
2008 JAMES R SMAIL INC 445.00 40.00 365
2009 JAMES R SMAIL INC 412.00 12.00 365
2010 JAMES R SMAIL INC 429.00 0.00 365
2011 JAMES R SMAIL INC 391.00 0.00 365
2013 JAMES R SMAIL INC 274.00 0.00 365
2014 JAMES R SMAIL INC 228.00 53.00 365
2015 JAMES R SMAIL INC 231.00 37.00 365
2016 JAMES R SMAIL INC 363.00 0.00 365
2017 JAMES R SMAIL INC 429.00 0.00 365
2018 JAMES R SMAIL INC 440.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 JAMES R SMAIL INC Brine 60 152
1988 JAMES R SMAIL INC Brine 10 365
1989 JAMES R SMAIL INC Brine 20 365
1990 JAMES R SMAIL INC Brine 35 365
1991 JAMES R SMAIL INC Brine 0 365
1992 JAMES R SMAIL INC Brine 30 365
1993 JAMES R SMAIL INC Brine 0 365
1994 JAMES R SMAIL INC Brine 0 365
1995 JAMES R SMAIL INC Brine 0 365
1996 JAMES R SMAIL INC Brine 0 365
1997 JAMES R SMAIL INC Brine 75 365
1998 JAMES R SMAIL INC Brine 0 365
1999 JAMES R SMAIL INC Brine 20 365
2000 JAMES R SMAIL INC Brine 365
2001 JAMES R SMAIL INC Brine 365
2002 JAMES R SMAIL INC Brine 0 365
2003 JAMES R SMAIL INC Brine 0 365
2004 JAMES R SMAIL INC Brine 0 365
2005 JAMES R SMAIL INC Brine 0 365
2006 JAMES R SMAIL INC Brine 0 365
2007 JAMES R SMAIL INC Brine 0 365
2008 JAMES R SMAIL INC Brine 0 365
2009 JAMES R SMAIL INC Brine 0 365
2010 JAMES R SMAIL INC Brine 25 365
2011 JAMES R SMAIL INC Brine 30 365
2013 JAMES R SMAIL INC Brine 30 365
2014 JAMES R SMAIL INC Brine 35 365
2015 JAMES R SMAIL INC Brine 54 365
2016 JAMES R SMAIL INC Brine 71 365
2017 JAMES R SMAIL INC Brine 115 365
2018 JAMES R SMAIL INC Brine 49 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-14715297 2017-5-15 0:00: PW No Violations
-1828113255 2014-12-19 0:00 PW No Violations 0.50
00000PL572 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0014715297 2017-05-15 Production Wells No Violations Inspected production well on 05/15/2017. The tank battery consists of 1-100 bbl steel tank, 1-horizontal separator, and 1-underground brine vault (shared with the D&L Ryder #3 well, PN: 169-25168), located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
0346633602 2018-03-13 Production Wells No Violations Inspected production well on 03/13/2018. The tank battery consists of 1-100 bbl steel tank, 1-horizontal separator, 1-drip, 1-meter box, and 1-underground brine vault (shared), located within an earthen dike; the diked area and noted equipment are shared with the D&L Ryder #3 and Bridle #4 wells (PN: 169-25168/25123). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1462092303 2013-05-06 Production Wells No Violations This is a producing pump unit. There are no apparent problems at this time.
1828113255 2014-12-19 Production Wells No Violations This is a pumping unit well. There are no apparent issues at this time.
1923880528 2015-12-31 Production Wells No Violations Inspected production well on 12/31/2015. The tank battery consists of 1-100 bbl steel tank, 1-horizontal separator, and 1-underground brine vault located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection.
2134556501 2020-9-30 0:00: PW No Violations
346633602 2018-3-13 0:00: PW No Violations
PL572 PL No Violations

For data sources see[9]

References