If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-22852 | | Well ID: 34-153-22852 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.06, -81.49 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 9: | Line 9: | ||
| State: Ohio | | State: Ohio | ||
|- | |- | ||
− | | County: | + | | County: <County> |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: [[EVERFLOW EASTERN | + | | Operator Name: [[EVERFLOW EASTERN PARTNERS LP]] |
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 1996-11-07 |
|- | |- | ||
| Spud Date: 1997-01-21 | | Spud Date: 1997-01-21 | ||
Line 29: | Line 29: | ||
| Final Drill Date: 1997-02-02 | | Final Drill Date: 1997-02-02 | ||
|- | |- | ||
− | | Well Total Depth: 4583 ft | + | | Well Total Depth: 4583.00 ft |
|- | |- | ||
| Configuration: Directional | | Configuration: Directional | ||
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.060000 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.490000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Well History == | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 89: | Line 89: | ||
| title = Risk Based Data Management System - Well and WellHistry Tables | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Perforation Treatments == | == Perforation Treatments == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 100: | Line 100: | ||
|- | |- | ||
| 1997-06-29 | | 1997-06-29 | ||
+ | | style="text-align: right;" | 4326 | ||
+ | | style="text-align: right;" | 4407 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | | ||
| style="text-align: right;" | 4326 | | style="text-align: right;" | 4326 | ||
| style="text-align: right;" | 4407 | | style="text-align: right;" | 4407 | ||
Line 108: | Line 113: | ||
| style="text-align: right;" | 4408 | | style="text-align: right;" | 4408 | ||
| style="text-align: right;" | 90 | | style="text-align: right;" | 90 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 4346 | ||
+ | | style="text-align: right;" | 4408 | ||
+ | | style="text-align: right;" | 90 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 4326 | ||
+ | | style="text-align: right;" | 4407 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
Line 113: | Line 128: | ||
| title = Risk Based Data Management System - Perfs Table | | title = Risk Based Data Management System - Perfs Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 162: | Line 177: | ||
| title = Risk Based Data Management System - tblStimulation Table | | title = Risk Based Data Management System - tblStimulation Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 174: | Line 189: | ||
|- | |- | ||
| 1997 | | 1997 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 1171 | + | | style="text-align: right;" | 1171.00 |
− | | style="text-align: right;" | 277 | + | | style="text-align: right;" | 277.00 |
| style="text-align: right;" | 152 | | style="text-align: right;" | 152 | ||
|- | |- | ||
| 1998 | | 1998 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 18260 | + | | style="text-align: right;" | 18260.00 |
− | | style="text-align: right;" | 262 | + | | style="text-align: right;" | 262.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 1999 | | 1999 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 11859 | + | | style="text-align: right;" | 11859.00 |
− | | style="text-align: right;" | 159 | + | | style="text-align: right;" | 159.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2000 | | 2000 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 8691 | + | | style="text-align: right;" | 8691.00 |
− | | style="text-align: right;" | 126 | + | | style="text-align: right;" | 126.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2001 | | 2001 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 7206 | + | | style="text-align: right;" | 7206.00 |
− | | style="text-align: right;" | 23 | + | | style="text-align: right;" | 23.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2002 | | 2002 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 6483 | + | | style="text-align: right;" | 6483.00 |
− | | style="text-align: right;" | 69 | + | | style="text-align: right;" | 69.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2003 | | 2003 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 5696 | + | | style="text-align: right;" | 5696.00 |
− | | style="text-align: right;" | 79 | + | | style="text-align: right;" | 79.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2004 | | 2004 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 4933 | + | | style="text-align: right;" | 4933.00 |
− | | style="text-align: right;" | 55 | + | | style="text-align: right;" | 55.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2005 | | 2005 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 4822 | + | | style="text-align: right;" | 4822.00 |
− | | style="text-align: right;" | 36 | + | | style="text-align: right;" | 36.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2006 | | 2006 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 4342 | + | | style="text-align: right;" | 4342.00 |
− | | style="text-align: right;" | 55 | + | | style="text-align: right;" | 55.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2007 | | 2007 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 4296 | + | | style="text-align: right;" | 4296.00 |
− | | style="text-align: right;" | 93 | + | | style="text-align: right;" | 93.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2008 | | 2008 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 4651 | + | | style="text-align: right;" | 4651.00 |
− | | style="text-align: right;" | 90 | + | | style="text-align: right;" | 90.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2009 | | 2009 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 4370 | + | | style="text-align: right;" | 4370.00 |
− | | style="text-align: right;" | 69 | + | | style="text-align: right;" | 69.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2010 | | 2010 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 3983 | + | | style="text-align: right;" | 3983.00 |
− | | style="text-align: right;" | 62 | + | | style="text-align: right;" | 62.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2011 | | 2011 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 3277 | + | | style="text-align: right;" | 3277.00 |
− | | style="text-align: right;" | 52 | + | | style="text-align: right;" | 52.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2012 | | 2012 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 2959 | + | | style="text-align: right;" | 2959.00 |
− | | style="text-align: right;" | 42 | + | | style="text-align: right;" | 42.00 |
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
|- | |- | ||
| 2013 | | 2013 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 3226 | + | | style="text-align: right;" | 3226.00 |
− | | style="text-align: right;" | 121 | + | | style="text-align: right;" | 121.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2014 | | 2014 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 2830 | + | | style="text-align: right;" | 2830.00 |
− | | style="text-align: right;" | 62 | + | | style="text-align: right;" | 62.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2015 | | 2015 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 2606 | + | | style="text-align: right;" | 2606.00 |
− | | style="text-align: right;" | 69 | + | | style="text-align: right;" | 69.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2016 | | 2016 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 2180 | + | | style="text-align: right;" | 2180.00 |
− | | style="text-align: right;" | 44 | + | | style="text-align: right;" | 44.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2017 | | 2017 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 2228 | + | | style="text-align: right;" | 2228.00 |
− | | style="text-align: right;" | 31 | + | | style="text-align: right;" | 31.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
| 2018 | | 2018 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
− | | style="text-align: right;" | 2424 | + | | style="text-align: right;" | 2424.00 |
− | | style="text-align: right;" | 0 | + | | style="text-align: right;" | 0.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
Line 309: | Line 324: | ||
| title = Risk Based Data Management System - Production Table - Oil and Gas Data | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<ref>{{cite web | <ref>{{cite web | ||
| title = Combined Production - Oil and Gas Data | | title = Combined Production - Oil and Gas Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
Line 327: | Line 342: | ||
|- | |- | ||
| 1997 | | 1997 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 1323 | | style="text-align: right;" | 1323 | ||
Line 333: | Line 348: | ||
|- | |- | ||
| 1998 | | 1998 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 603 | | style="text-align: right;" | 603 | ||
Line 339: | Line 354: | ||
|- | |- | ||
| 1999 | | 1999 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 360 | | style="text-align: right;" | 360 | ||
Line 345: | Line 360: | ||
|- | |- | ||
| 2000 | | 2000 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 221 | | style="text-align: right;" | 221 | ||
Line 351: | Line 366: | ||
|- | |- | ||
| 2001 | | 2001 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 199 | | style="text-align: right;" | 199 | ||
Line 357: | Line 372: | ||
|- | |- | ||
| 2002 | | 2002 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 174 | | style="text-align: right;" | 174 | ||
Line 363: | Line 378: | ||
|- | |- | ||
| 2003 | | 2003 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 92 | | style="text-align: right;" | 92 | ||
Line 369: | Line 384: | ||
|- | |- | ||
| 2004 | | 2004 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 147 | | style="text-align: right;" | 147 | ||
Line 375: | Line 390: | ||
|- | |- | ||
| 2005 | | 2005 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 204 | | style="text-align: right;" | 204 | ||
Line 381: | Line 396: | ||
|- | |- | ||
| 2006 | | 2006 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 126 | | style="text-align: right;" | 126 | ||
Line 387: | Line 402: | ||
|- | |- | ||
| 2007 | | 2007 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 121 | | style="text-align: right;" | 121 | ||
Line 393: | Line 408: | ||
|- | |- | ||
| 2008 | | 2008 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 141 | | style="text-align: right;" | 141 | ||
Line 399: | Line 414: | ||
|- | |- | ||
| 2009 | | 2009 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 89 | | style="text-align: right;" | 89 | ||
Line 405: | Line 420: | ||
|- | |- | ||
| 2010 | | 2010 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 70 | | style="text-align: right;" | 70 | ||
Line 411: | Line 426: | ||
|- | |- | ||
| 2011 | | 2011 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 58 | | style="text-align: right;" | 58 | ||
Line 417: | Line 432: | ||
|- | |- | ||
| 2012 | | 2012 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 86 | | style="text-align: right;" | 86 | ||
Line 423: | Line 438: | ||
|- | |- | ||
| 2013 | | 2013 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 89 | | style="text-align: right;" | 89 | ||
Line 429: | Line 444: | ||
|- | |- | ||
| 2014 | | 2014 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 71 | | style="text-align: right;" | 71 | ||
Line 435: | Line 450: | ||
|- | |- | ||
| 2015 | | 2015 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 50 | | style="text-align: right;" | 50 | ||
Line 441: | Line 456: | ||
|- | |- | ||
| 2016 | | 2016 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 56 | | style="text-align: right;" | 56 | ||
Line 447: | Line 462: | ||
|- | |- | ||
| 2017 | | 2017 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 27 | | style="text-align: right;" | 27 | ||
Line 453: | Line 468: | ||
|- | |- | ||
| 2018 | | 2018 | ||
− | | [[EVERFLOW EASTERN | + | | [[EVERFLOW EASTERN PARTNERS LP]] |
| Brine | | Brine | ||
| style="text-align: right;" | 47 | | style="text-align: right;" | 47 | ||
Line 462: | Line 477: | ||
| title = Risk Based Data Management System - Production Table - Brine Data | | title = Risk Based Data Management System - Production Table - Brine Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<ref>{{cite web | <ref>{{cite web | ||
| title = Combined Production - Brine Data | | title = Combined Production - Brine Data | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Inspection Data == | <!--== Inspection Data == | ||
==== Inspections Performed ==== | ==== Inspections Performed ==== |
Well ID: 34-153-22852 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.06,"lon":-81.49,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: HOBAN UNIT | |
License Status: Producing | |
License Date: 1996-11-07 | |
Spud Date: 1997-01-21 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1997-02-02 | |
Well Total Depth: 4583.00 ft | |
Configuration: Directional | |
Latitude: 41.060000 | |
Longitude: -81.490000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1996-11-07 | 84 EVERFLOW EASTERN PTNS L P GeoDate 11/7/96 |
Oil and Gas | 1996-11-07 | Issued Date 11/7/96 Expired Date 11/7/97 Acres 0050320 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04583 Proposed Drill Depth 04583 |
Original Spud | 1997-01-21 | |
Completed | 1997-02-02 | |
Reached Total Depth | 1997-02-02 | |
Completion Report Received | 1997-03-06 | |
Correction to Well | 1997-08-01 | CHANGE IN X AND Y COORDS. AND FOOTAGE DESCRIPTION. X=2,276,850; Y=510,775; SURFACE FOOTAGE NOW IS 870'SL & 1420'EL OF TWP. CIVIL TOWNSHIP FOR SURFACE IS PORTAGE. |
Construction Permit Expires | 1997-11-07 | |
Record Last Modified | 2019-06-14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4326 | 4407 | 0 |
4326 | 4407 | 0 | |
2006-09-11 | 4346 | 4408 | 90 |
4346 | 4408 | 90 | |
4326 | 4407 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 16340 Gal | 73000 | FRAC W/116,340 GAL WATER AND 73M# |
For data sources see[4]