X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-035-22056"

m
m
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-035-22056
 
| Well ID: 34-035-22056
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.4561465, -81.51520666 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.45, -81.51 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Cuyahoga County, Ohio|Cuyahoga]]
+
| Country: United States
 +
|-
 +
| State: Ohio
 +
|-
 +
| County: <County>
 
|-
 
|-
 
| Municipality:  
 
| Municipality:  
 
|-
 
|-
| Operator Name: [[KLEESE DEVELOPMENT ASSOCS]]
+
| Operator Name: [[KLEESE DEVELOPMENT ASSOCIATES]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: CITY OF CLEVELAND
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2008-07-07
 
|-
 
|-
 
| Spud Date: 2008-11-25
 
| Spud Date: 2008-11-25
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[CAPSTAR DRILLING]]
 +
|-
 +
| Final Drill Date: 2008-12-04
 +
|-
 +
| Well Total Depth: 3745.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 41.450000
 
|-
 
|-
| Violations: 0
+
| Longitude: -81.510000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
| Latitude: 41.4561465
+
| APP
 +
| 2008-07-07
 +
| Proposed Formations:CLINTON, Issued Date:7/7/2008, Expired Date:7/7/2009 6:00:00 AM, Drilling unit acres:26.817, Proposed Well Type:OG, Proposed Well Class:POOL
 
|-
 
|-
| Longitude: -81.51520666
+
| Reached Total Depth
 +
| 2008-12-04
 +
 +
|-
 +
| Completion Report Received
 +
| 2009-05-04
 +
 +
|-
 +
| Construction Permit Expires
 +
| 2009-07-07
 +
 +
|-
 +
| Record Last Modified
 +
| 2017-02-15
 +
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Perforation Date
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Interval Top (ft)
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Interval Base (ft)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Number of Shots
!scope="col" | CONDENSATE PRODUCTION DAYS
+
|-
!scope="col" | OIL QUANTITY
+
| 2009-08-06
!scope="col" | OIL PRODUCTION DAYS
+
| style="text-align: right;" | 3577
 +
| style="text-align: right;" | 3602
 +
| style="text-align: right;" | 27
 
|-
 
|-
| 2009-0
 
| style="text-align:right;" | 0.0
 
 
|  
 
|  
 +
| style="text-align: right;" | 3577
 +
| style="text-align: right;" | 3602
 +
| style="text-align: right;" | 27
 +
|-
 
|  
 
|  
|  
+
| style="text-align: right;" | 3577
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 3602
|  
+
| style="text-align: right;" | 27
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| 2010-0
 
| style="text-align:right;" | 7403.0
 
 
|  
 
|  
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 61253 Gal
 +
| style="text-align: right;" | 40000
 
|  
 
|  
 
|  
 
|  
| style="text-align:right;" | 139.0
 
|
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2009
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2010
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| style="text-align: right;" | 7403.00
 +
| style="text-align: right;" | 139.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2012
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| style="text-align: right;" | 7721.00
 +
| style="text-align: right;" | 84.00
 +
| style="text-align: right;" | 366
 +
|-
 +
| 2013
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| style="text-align: right;" | 2632.00
 +
| style="text-align: right;" | 48.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| style="text-align: right;" | 1386.00
 +
| style="text-align: right;" | 76.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| style="text-align: right;" | 1052.00
 +
| style="text-align: right;" | 104.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| style="text-align: right;" | 1520.00
 +
| style="text-align: right;" | 118.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| style="text-align: right;" | 351.00
 +
| style="text-align: right;" | 45.00
 +
| style="text-align: right;" | 270
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2009
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2010
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2012
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 366
 
|-
 
|-
| 2012-0
+
| 2013
| style="text-align:right;" | 7721.0
+
| [[KLEESE DEVELOPMENT ASSOCIATES]]
|
+
| Brine
|
+
| style="text-align: right;" | 92
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 84.0
 
|
 
 
|-
 
|-
 +
| 2014
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| Brine
 +
| style="text-align: right;" | 102
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2013-0
+
| 2015
| style="text-align:right;" | 2632.0
+
| [[KLEESE DEVELOPMENT ASSOCIATES]]
|
+
| Brine
|
+
| style="text-align: right;" | 64
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 48.0
 
|
 
 
|-
 
|-
 +
| 2016
 +
| [[KLEESE DEVELOPMENT ASSOCIATES]]
 +
| Brine
 +
| style="text-align: right;" | 22
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2014-0
+
| 2017
| style="text-align:right;" | 1386.0
+
| [[KLEESE DEVELOPMENT ASSOCIATES]]
| style="text-align:right;" | 365.0
+
| Brine
|  
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 270
| style="text-align:right;" | 76.0
 
| style="text-align:right;" | 365.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Production Table - Brine Data
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date =  2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2020-11-16
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
 
| -1112700360
 
| -1112700360
| 2013-02-19
+
| 2013-2-19 0:00:
 +
| PL
 +
| No Violations
 +
|
 +
|-
 +
| -2024757632
 +
| 2008-7-31 0:00:
 +
| DD
 +
| No Violations
 +
|
 +
|-
 +
| -2043853639
 +
| 2008-11-3 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
| The wellhead consists of a pumpjack unit in an 6-foot fenced enclosure.  The associated tank battery consists of 1 210-barrel (BBL) tank, 1 50 BBL tank,  and a mechanical separator, also in a separate, locked enclosure. The spacing is in accordance with the rule. The tank battery dike is adequate. There is also a 50-BBL poly tank located at the wellhead, which has an earthen secondary containment. The dike drain is open. I contacted Matt Kleese and advised him about the open dike drain. There has been no production reports filed for this unit since 2010. I contacted Maryann at Kleese Dev. Assoc. She indicated that they may have forgotten to file the 2011 production report.
+
|-
 +
| -311476593
 +
| 2008-11-25 0:00
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -537059462
 +
| 2009-1-23 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -609473306
 +
| 2017-3-2 0:00:0
 +
| UP
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -705133431
 +
| 2013-9-11 0:00:
 +
| UP
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 +
| 0096011158
 +
| 2012-01-12
 +
| UrbanProduction Wells
 +
| No Violations
 +
| On 1/12/2012, DNR Inspector Richard Skidmore, completed an urban production well inspection status check for DNR Inspector Ray Wallace.  The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05.  Inspection passed.
 +
|-
 +
| 0311476593
 +
| 2008-11-25
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| rig moving on to location
 +
|-
 +
| 0537059462
 +
| 2009-01-23
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| area graded
 +
|-
 +
| 0609473306
 +
| 2017-03-02
 +
| UrbanProduction Wells
 +
| No Violations
 +
| I inspected this producing well location as follow-up to a previous compliance notice issued following an uncontrolled release of oil from a ruptured flow-line. At the time of this inspection, the flow-line had been repaired and the areas impacted effectively remediated and restored. Fittings and connections at the wellhead were secure and free from signs of leakage or problems.
 +
|-
 +
| 0705133431
 +
| 2013-09-11
 +
| UrbanProduction Wells
 +
| No Violations
 +
| Performed a follow-up inspection after rupture of sales line. A portion of the impacted area has been re-seeded. The unit is back in production. The screening vegetation around the tank battery is mostly dead and will need re-planted. I will follow-up with Kleese to track the on-going restoration of the impacted area until completed.
 +
|-
 +
| 1112700360
 +
| 2013-02-19
 +
| Preliminary Restoration
 +
| No Violations
 +
| The wellhead consists of a pumpjack unit in an 6-foot fenced enclosure.  The associated tank battery consists of 1 210-barrel (BBL) tank, 1 50 BBL tank,  and a mechanical separator, also in a separate, locked enclosure. The spacing is in accordance with the rule. The tank battery dike is adequate. There is also a 50-BBL poly tank located at the wellhead, which has an earthen secondary containment. The dike drain is open. I contacted Matt Kleese and advised him about the open dike drain. There has been no production reports filed for this unit since 2010. I contacted Maryann at Kleese Dev. Assoc. She indicated that they may have forgotten to file the 2011 production report.
 
|-
 
|-
 
| 1377549931
 
| 1377549931
 
| 2013-08-20
 
| 2013-08-20
|  
+
| UrbanProduction Wells
 +
| No Violations
 
| Got a call from the ODNR Uniontown office regarding a report of an oil release associated with this producing unit. Upon my arrival I observed crews from Kleese Development performing mitigation of a surficial coating of oil which had originated from a break in the sales line from this unit. Matt Kleese reported that the incident was reported at 1130 and Kleese crews were on site within the hour. Upon arrival, the Kleese crews shut-in the unit and relieved pressure from the line. They believe that the sales line became over-pressurized and ruptured. I estimate that less than one barrel of oil was released from the line. Also on site is a crew from the City of Cleveland Utilities Department HazMat team. I spoke with Mr. Juan Roman, a representative of the Hazmat Division, and he indicated that a groundskeeper witnessed the event and made the report. The property on which the well is located is owned by the City of Cleveland. He indicated that they were satisfied with the response by Kleese to the incident. I told him that I would be following up to confirm that the incident is appropriately mitigated and the proper repairs are made.
 
| Got a call from the ODNR Uniontown office regarding a report of an oil release associated with this producing unit. Upon my arrival I observed crews from Kleese Development performing mitigation of a surficial coating of oil which had originated from a break in the sales line from this unit. Matt Kleese reported that the incident was reported at 1130 and Kleese crews were on site within the hour. Upon arrival, the Kleese crews shut-in the unit and relieved pressure from the line. They believe that the sales line became over-pressurized and ruptured. I estimate that less than one barrel of oil was released from the line. Also on site is a crew from the City of Cleveland Utilities Department HazMat team. I spoke with Mr. Juan Roman, a representative of the Hazmat Division, and he indicated that a groundskeeper witnessed the event and made the report. The property on which the well is located is owned by the City of Cleveland. He indicated that they were satisfied with the response by Kleese to the incident. I told him that I would be following up to confirm that the incident is appropriately mitigated and the proper repairs are made.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1403939049
 
| 1403939049
 
| 2008-12-02
 
| 2008-12-02
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| freezing weather pump froze up
 
| freezing weather pump froze up
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1432838646
 
| 1432838646
 
| 2015-05-28
 
| 2015-05-28
|  
+
| UrbanProduction Wells
 +
| Violations Noted
 
| I inspected this well location following a phone notification from Kleese Development Assoc (KDA). That there had been a release of oil from the pumping unit. According to the report, a contract pumper noticed the leakage at some point during the day on 05/27/2015. Upon my arrival I spoke with Jim Adams from J Well (contract pumper). He indicated that an estimated 1 barrel or less of oil was release from a flow-line connection which failed near the pumping unit, within the containment. I observed a 30 ft. x 10 ft. area within the containment of free oil and oil-impacted ballast and soil.  At the time of this inspection, crews from KDA are working on mitigating the areas impacted by the release and removing free oil with a vac truck. Impacted soils will be removed and disposed. The well has been shut-in during these activities which are on-going. In addition, an area of stressed vegetation that extends 75 feet downslope from the well is being mitigated. Clean-up and mitigation, including site restoration, must be completed within 30 days. Please contact Inspector Stephen Tompkins at (330) 907-4647 regarding this inspection.
 
| I inspected this well location following a phone notification from Kleese Development Assoc (KDA). That there had been a release of oil from the pumping unit. According to the report, a contract pumper noticed the leakage at some point during the day on 05/27/2015. Upon my arrival I spoke with Jim Adams from J Well (contract pumper). He indicated that an estimated 1 barrel or less of oil was release from a flow-line connection which failed near the pumping unit, within the containment. I observed a 30 ft. x 10 ft. area within the containment of free oil and oil-impacted ballast and soil.  At the time of this inspection, crews from KDA are working on mitigating the areas impacted by the release and removing free oil with a vac truck. Impacted soils will be removed and disposed. The well has been shut-in during these activities which are on-going. In addition, an area of stressed vegetation that extends 75 feet downslope from the well is being mitigated. Clean-up and mitigation, including site restoration, must be completed within 30 days. Please contact Inspector Stephen Tompkins at (330) 907-4647 regarding this inspection.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1678596089
 +
| 2017-09-28
 +
| UrbanProduction Wells
 +
| No Violations
 +
| I inspected this well as a follow-up to a previous inspection and associated compliance notice issued for the following issues: There had been an uncontrolled release of oil impacting the area surrounding the well.  At the time of this inspection, all impacted areas have been remediated and display good growth of vegetation. The well is in production, with secure fittings at the well and battery. Areas down-gradient of the well had shown some erosional impacts from surface drainage around the well, but the erosional deficits appear to have improved.
 
|-
 
|-
 
| 1714162519
 
| 1714162519
 
| 2010-08-20
 
| 2010-08-20
|  
+
| Preliminary Restoration
|  
+
| No Violations
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1835043054
 
| 1835043054
 
| 2008-11-06
 
| 2008-11-06
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| drilling
 
| drilling
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1935405940
 
| 1935405940
 
| 2013-08-22
 
| 2013-08-22
|  
+
| UrbanProduction Wells
 +
| No Violations
 
| The pipe break has been repaired and the area of the break and subsequent impact has been partially regraded. Addtiional re-grading will be needed followed by re-seeding. I met with Frank Petrik, regulatory compliance manager for the Cleveland Department of Utilities who was on site. We talked to Jim Adams, contract pumper for Kleese who was also on site. Jim was returning the producing unit to operation. He indicated that the suspected cause of the line break was partailly due to a faulty valve at the Dominion metering station. Jim reported that Dominion has since fixed the valve and the unit is producing at normal operating pressure of 80 PSI. Jim indicated that final grading and seeding was pending. I observed an area of dead grass, approximately 500 square feet in area, beside the wellhead.
 
| The pipe break has been repaired and the area of the break and subsequent impact has been partially regraded. Addtiional re-grading will be needed followed by re-seeding. I met with Frank Petrik, regulatory compliance manager for the Cleveland Department of Utilities who was on site. We talked to Jim Adams, contract pumper for Kleese who was also on site. Jim was returning the producing unit to operation. He indicated that the suspected cause of the line break was partailly due to a faulty valve at the Dominion metering station. Jim reported that Dominion has since fixed the valve and the unit is producing at normal operating pressure of 80 PSI. Jim indicated that final grading and seeding was pending. I observed an area of dead grass, approximately 500 square feet in area, beside the wellhead.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 2024757632
| -2024757632
 
 
| 2008-07-31
 
| 2008-07-31
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Making location
 
| Making location
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 2043853639
| -2043853639
 
 
| 2008-11-03
 
| 2008-11-03
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| pits closed area being leveled
 
| pits closed area being leveled
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2069000520
 
| 2069000520
 
| 2008-12-01
 
| 2008-12-01
|  
+
| Drill / Deepen /  Reopen
| switching to fluid 2500'
+
| No Violations
|
+
| switching to fluid 2500
|
 
|
 
 
|-
 
|-
 +
| 96011158
 +
| 2012-1-12 0:00:
 +
| UP
 +
| No Violations
 +
| 1.00
 
|-
 
|-
| -311476593
+
|}
| 2008-11-25
+
==== Violations Commited ====
|  
+
{| class="wikitable sortable" width="95%"
| rig moving on to location
+
!scope="col" style="text-align: center"| Inspection ID
|  
+
!scope="col" style="text-align: center"| Violation ID
|  
+
!scope="col" style="text-align: center"| Violation Date
|  
+
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 
|-
 
|-
|-
+
| 1432838646
| -537059462
+
| US-OH-112662
| 2009-01-23
+
| 2015-06-02
|
 
| area graded
 
|
 
|
 
|
 
|-
 
|-
 
| -705133431
 
| 2013-09-11
 
|
 
| Performed a follow-up inspection after rupture of sales line. A portion of the impacted area has been re-seeded. The unit is back in production. The screening vegetation around the tank battery is mostly dead and will need re-planted. I will follow-up with Kleese to track the on-going restoration of the impacted area until completed.
 
|
 
|
 
|
 
|-
 
|-
 
| 96011158
 
| 2012-01-12
 
|
 
| On 1/12/2012, DNR Inspector Richard Skidmore, completed an urban production well inspection status check for DNR Inspector Ray Wallace.  The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05.  Inspection passed.
 
|
 
|
 
 
|  
 
|  
 +
| Well operation causing pollution and contamination
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 08:12, 12 January 2021

Well Details

Well ID: 34-035-22056
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: KLEESE DEVELOPMENT ASSOCIATES
Well Pad ID:
Farm/Lease Name: CITY OF CLEVELAND
License Status: Producing
License Date: 2008-07-07
Spud Date: 2008-11-25
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2008-12-04
Well Total Depth: 3745.00 ft
Configuration: Vertical
Latitude: 41.450000
Longitude: -81.510000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-07-07 Proposed Formations:CLINTON, Issued Date:7/7/2008, Expired Date:7/7/2009 6:00:00 AM, Drilling unit acres:26.817, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-12-04
Completion Report Received 2009-05-04
Construction Permit Expires 2009-07-07
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-08-06 3577 3602 27
3577 3602 27
3577 3602 27

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 61253 Gal 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 KLEESE DEVELOPMENT ASSOCIATES 0.00 0.00 365
2010 KLEESE DEVELOPMENT ASSOCIATES 7403.00 139.00 365
2012 KLEESE DEVELOPMENT ASSOCIATES 7721.00 84.00 366
2013 KLEESE DEVELOPMENT ASSOCIATES 2632.00 48.00 365
2014 KLEESE DEVELOPMENT ASSOCIATES 1386.00 76.00 365
2015 KLEESE DEVELOPMENT ASSOCIATES 1052.00 104.00 365
2016 KLEESE DEVELOPMENT ASSOCIATES 1520.00 118.00 365
2017 KLEESE DEVELOPMENT ASSOCIATES 351.00 45.00 270

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2010 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2012 KLEESE DEVELOPMENT ASSOCIATES Brine 0 366
2013 KLEESE DEVELOPMENT ASSOCIATES Brine 92 365
2014 KLEESE DEVELOPMENT ASSOCIATES Brine 102 365
2015 KLEESE DEVELOPMENT ASSOCIATES Brine 64 365
2016 KLEESE DEVELOPMENT ASSOCIATES Brine 22 365
2017 KLEESE DEVELOPMENT ASSOCIATES Brine 0 270

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1112700360 2013-2-19 0:00: PL No Violations
-2024757632 2008-7-31 0:00: DD No Violations
-2043853639 2008-11-3 0:00: DD No Violations
-311476593 2008-11-25 0:00 DD No Violations
-537059462 2009-1-23 0:00: DD No Violations
-609473306 2017-3-2 0:00:0 UP No Violations 1.00
-705133431 2013-9-11 0:00: UP No Violations
0096011158 2012-01-12 UrbanProduction Wells No Violations On 1/12/2012, DNR Inspector Richard Skidmore, completed an urban production well inspection status check for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed.
0311476593 2008-11-25 Drill / Deepen / Reopen No Violations rig moving on to location
0537059462 2009-01-23 Drill / Deepen / Reopen No Violations area graded
0609473306 2017-03-02 UrbanProduction Wells No Violations I inspected this producing well location as follow-up to a previous compliance notice issued following an uncontrolled release of oil from a ruptured flow-line. At the time of this inspection, the flow-line had been repaired and the areas impacted effectively remediated and restored. Fittings and connections at the wellhead were secure and free from signs of leakage or problems.
0705133431 2013-09-11 UrbanProduction Wells No Violations Performed a follow-up inspection after rupture of sales line. A portion of the impacted area has been re-seeded. The unit is back in production. The screening vegetation around the tank battery is mostly dead and will need re-planted. I will follow-up with Kleese to track the on-going restoration of the impacted area until completed.
1112700360 2013-02-19 Preliminary Restoration No Violations The wellhead consists of a pumpjack unit in an 6-foot fenced enclosure. The associated tank battery consists of 1 210-barrel (BBL) tank, 1 50 BBL tank, and a mechanical separator, also in a separate, locked enclosure. The spacing is in accordance with the rule. The tank battery dike is adequate. There is also a 50-BBL poly tank located at the wellhead, which has an earthen secondary containment. The dike drain is open. I contacted Matt Kleese and advised him about the open dike drain. There has been no production reports filed for this unit since 2010. I contacted Maryann at Kleese Dev. Assoc. She indicated that they may have forgotten to file the 2011 production report.
1377549931 2013-08-20 UrbanProduction Wells No Violations Got a call from the ODNR Uniontown office regarding a report of an oil release associated with this producing unit. Upon my arrival I observed crews from Kleese Development performing mitigation of a surficial coating of oil which had originated from a break in the sales line from this unit. Matt Kleese reported that the incident was reported at 1130 and Kleese crews were on site within the hour. Upon arrival, the Kleese crews shut-in the unit and relieved pressure from the line. They believe that the sales line became over-pressurized and ruptured. I estimate that less than one barrel of oil was released from the line. Also on site is a crew from the City of Cleveland Utilities Department HazMat team. I spoke with Mr. Juan Roman, a representative of the Hazmat Division, and he indicated that a groundskeeper witnessed the event and made the report. The property on which the well is located is owned by the City of Cleveland. He indicated that they were satisfied with the response by Kleese to the incident. I told him that I would be following up to confirm that the incident is appropriately mitigated and the proper repairs are made.
1403939049 2008-12-02 Drill / Deepen / Reopen No Violations freezing weather pump froze up
1432838646 2015-05-28 UrbanProduction Wells Violations Noted I inspected this well location following a phone notification from Kleese Development Assoc (KDA). That there had been a release of oil from the pumping unit. According to the report, a contract pumper noticed the leakage at some point during the day on 05/27/2015. Upon my arrival I spoke with Jim Adams from J Well (contract pumper). He indicated that an estimated 1 barrel or less of oil was release from a flow-line connection which failed near the pumping unit, within the containment. I observed a 30 ft. x 10 ft. area within the containment of free oil and oil-impacted ballast and soil. At the time of this inspection, crews from KDA are working on mitigating the areas impacted by the release and removing free oil with a vac truck. Impacted soils will be removed and disposed. The well has been shut-in during these activities which are on-going. In addition, an area of stressed vegetation that extends 75 feet downslope from the well is being mitigated. Clean-up and mitigation, including site restoration, must be completed within 30 days. Please contact Inspector Stephen Tompkins at (330) 907-4647 regarding this inspection.
1678596089 2017-09-28 UrbanProduction Wells No Violations I inspected this well as a follow-up to a previous inspection and associated compliance notice issued for the following issues: There had been an uncontrolled release of oil impacting the area surrounding the well. At the time of this inspection, all impacted areas have been remediated and display good growth of vegetation. The well is in production, with secure fittings at the well and battery. Areas down-gradient of the well had shown some erosional impacts from surface drainage around the well, but the erosional deficits appear to have improved.
1714162519 2010-08-20 Preliminary Restoration No Violations
1835043054 2008-11-06 Drill / Deepen / Reopen No Violations drilling
1935405940 2013-08-22 UrbanProduction Wells No Violations The pipe break has been repaired and the area of the break and subsequent impact has been partially regraded. Addtiional re-grading will be needed followed by re-seeding. I met with Frank Petrik, regulatory compliance manager for the Cleveland Department of Utilities who was on site. We talked to Jim Adams, contract pumper for Kleese who was also on site. Jim was returning the producing unit to operation. He indicated that the suspected cause of the line break was partailly due to a faulty valve at the Dominion metering station. Jim reported that Dominion has since fixed the valve and the unit is producing at normal operating pressure of 80 PSI. Jim indicated that final grading and seeding was pending. I observed an area of dead grass, approximately 500 square feet in area, beside the wellhead.
2024757632 2008-07-31 Drill / Deepen / Reopen No Violations Making location
2043853639 2008-11-03 Drill / Deepen / Reopen No Violations pits closed area being leveled
2069000520 2008-12-01 Drill / Deepen / Reopen No Violations switching to fluid 2500
96011158 2012-1-12 0:00: UP No Violations 1.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1432838646 US-OH-112662 2015-06-02 Well operation causing pollution and contamination

For data sources see[9]

References