X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-115-24671"

m
 
m
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-115-24671
 
| Well ID: 34-115-24671
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.7309057302, -81.914182259 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.73, -81.91 | width=100% | height=100% }}
 
|-
 
|-
| County:
+
| Country: United States
 
|-
 
|-
| Municipality:
+
| State: Ohio
 
|-
 
|-
| Operator Name:
+
| County: [[Morgan_County,_Ohio|Morgan]]
 
|-
 
|-
| Well Pad ID:
+
| Municipality: [[Bloom_Township,_Morgan_County,_Ohio|Bloom Township]]
 
|-
 
|-
| Farm/Lease Name:
+
| Operator Name: [[ARTEX OIL COMPANY]]
 
|-
 
|-
| First Permit Date:
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date:
+
| Farm/Lease Name: DETWEILER UNIT
 +
|-
 +
| License Status: Final Restoration
 +
|-
 +
| License Date: 2019-06-11
 
|-
 
|-
 
| Spud Date: 2013-03-15
 
| Spud Date: 2013-03-15
 
|-
 
|-
| Unconventional:
+
| Spud Drilling Contractor: [[KILBARGER DRLG]]
 +
|-
 +
| Final Drill Date: 2013-03-31
 +
|-
 +
| Well Total Depth: 6665.00 ft
 +
|-
 +
| Configuration: Vertical
 +
|-
 +
| Latitude: 39.730000
 +
|-
 +
| Longitude: -81.910000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2013-02-27
 +
| Proposed Formations:QUEENSTON THRU KNOX, Issued Date:2/27/2013, Expired Date:2/27/2015 12:00:00 PM, Drilling unit acres:72, Proposed Well Type:OG, Proposed Well Class:EDPW
 +
|-
 +
| Reached Total Depth
 +
| 2013-03-31
 +
| GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
 +
|-
 +
| Completion Report Received
 +
| 2013-08-27
 +
| GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
 +
|-
 +
| APP
 +
| 2019-06-11
 +
| Proposed Formations:BEEKMANTOWN, Issued Date:6/11/2019, Expired Date:6/10/2021 12:00:00 PM, Drilling unit acres:72, Proposed Well Type:OG, Proposed Well Class:
 +
|-
 +
| Record Last Modified
 +
| 2019-06-14
 +
| GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
 
|-
 
|-
| Horizontal:
+
| Construction Permit Expires
 +
| 2021-06-10
 +
| GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
 
|-
 
|-
| Producing: No
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Violations: 0
+
| 2014-03-07
 +
| style="text-align: right;" | 6364
 +
| style="text-align: right;" | 6584
 +
| style="text-align: right;" | 117
 
|-
 
|-
| Latitude: 39.7309057302
+
|  
 +
| style="text-align: right;" | 6364
 +
| style="text-align: right;" | 6584
 +
| style="text-align: right;" | 117
 
|-
 
|-
| Longitude: -81.914182259
+
|  
 +
| style="text-align: right;" | 6364
 +
| style="text-align: right;" | 6584
 +
| style="text-align: right;" | 117
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
| 2013-04-09
 +
| ACID
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 21950 Gal
 +
| style="text-align: right;" | 0
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | OIL QUANTITY
+
|-
!scope="col" | OIL PRODUCTION DAYS
+
| 2013
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 21.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 30098.00
 +
| style="text-align: right;" | 639.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 50760.00
 +
| style="text-align: right;" | 815.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 17413.00
 +
| style="text-align: right;" | 173.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 7929.00
 +
| style="text-align: right;" | 121.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 9973.00
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 365
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
{| class="wikitable sortable" width="95%"
+
{| class="wikitable sortable"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | TYPE
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | QUANTITY
+
!scope="col" style="text-align: center"| Waste Type
!scope="col" | UNITS
+
!scope="col" style="text-align: center"| Quantity (bbl)
!scope="col" | DISPOSAL METHOD
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | WASTE FACILITY PERMIT ID
+
|-
!scope="col" | WASTE FACILITY NAME
+
| 2013
!scope="col" | FACILITY CITY
+
| [[ARTEX OIL COMPANY]]
!scope="col" | FACILITY STATE
+
| Brine
 +
| style="text-align: right;" | 3680
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 16634
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 13072
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 12994
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 8556
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 24106
 +
| style="text-align: right;" | 365
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION_COMMENT
+
| -1089293714
 +
| 2020-4-13 0:00:
 +
| FR
 +
| No Violations
 +
| 2.00
 +
|-
 +
| -1823540444
 +
| 2019-9-4 0:00:0
 +
| PB
 +
| No Violations
 +
| 0.10
 +
|-
 +
| -2095025939
 +
| 2019-9-3 0:00:0
 +
| PB
 +
| No Violations
 +
| 4.00
 +
|-
 +
| -589833422
 +
| 2019-9-5 0:00:0
 +
| PB
 +
| No Violations
 +
| 0.10
 +
|-
 +
| 0172534849
 +
| 2013-06-18
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
 +
|-
 +
| 0587186355
 +
| 2013-10-30
 +
| Preliminary Restoration
 +
| No Violations
 +
| Preliminary restoration is passed in accordance to 1509.072.
 +
|-
 +
| 0603729202
 +
| 2013-06-03
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artexs most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.
 
|-
 
|-
 
| 1363295307
 
| 1363295307
 
| 2013-03-14
 
| 2013-03-14
|
+
| Drill / Deepen /  Reopen
| I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4" hole to a TD of 739'. The casing shoe depth was 687'. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654'. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
+
| No Violations
|
+
| I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 739. The casing shoe depth was 687. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1369850646
 
| 1369850646
 
| 2013-05-29
 
| 2013-05-29
|
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
 
| Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1492187248
 
| 1492187248
 
| 2013-04-03
 
| 2013-04-03
|
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.
 
| All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1567772565
 +
| 2019-9-6 0:00:0
 +
| PB
 +
| No Violations
 +
| 0.10
 
|-
 
|-
 
| 172534849
 
| 172534849
| 2013-06-18
+
| 2013-6-18 0:00:
|
+
| DD
| Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
+
| No Violations
|
+
| 3.50
|
+
|-
|
+
| 325088203
 +
| 2019-9-9 0:00:0
 +
| PB
 +
| No Violations
 +
| 3.50
 
|-
 
|-
 +
| 330463697
 +
| 2019-8-27 0:00:
 +
| PB
 +
| No Violations
 +
| 3.00
 
|-
 
|-
 
| 587186355
 
| 587186355
| 2013-10-30
+
| 2013-10-30 0:00
|
+
| PL
| Preliminary restoration is passed in accordance to 1509.072.
+
| No Violations
|
+
| 0.30
|
 
|
 
 
|-
 
|-
 +
| 603729202
 +
| 2013-6-3 0:00:0
 +
| DD
 +
| No Violations
 +
| 0.50
 
|-
 
|-
| 603729202
+
| 812259431
| 2013-06-03
+
| 2019-8-29 0:00:
|
+
| PB
| I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artex's most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.
+
| No Violations
|
+
| 9.00
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 11:47, 12 January 2021

Well Details

Well ID: 34-115-24671
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Bloom Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: DETWEILER UNIT
License Status: Final Restoration
License Date: 2019-06-11
Spud Date: 2013-03-15
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2013-03-31
Well Total Depth: 6665.00 ft
Configuration: Vertical
Latitude: 39.730000
Longitude: -81.910000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-02-27 Proposed Formations:QUEENSTON THRU KNOX, Issued Date:2/27/2013, Expired Date:2/27/2015 12:00:00 PM, Drilling unit acres:72, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-03-31 GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
Completion Report Received 2013-08-27 GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
APP 2019-06-11 Proposed Formations:BEEKMANTOWN, Issued Date:6/11/2019, Expired Date:6/10/2021 12:00:00 PM, Drilling unit acres:72, Proposed Well Type:OG, Proposed Well Class:
Record Last Modified 2019-06-14 GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
Construction Permit Expires 2021-06-10 GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-03-07 6364 6584 117
6364 6584 117
6364 6584 117

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-04-09 ACID 15 21950 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ARTEX OIL COMPANY 0.00 21.00 365
2014 ARTEX OIL COMPANY 30098.00 639.00 365
2015 ARTEX OIL COMPANY 50760.00 815.00 365
2016 ARTEX OIL COMPANY 17413.00 173.00 365
2017 ARTEX OIL COMPANY 7929.00 121.00 365
2018 ARTEX OIL COMPANY 9973.00 100.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ARTEX OIL COMPANY Brine 3680 365
2014 ARTEX OIL COMPANY Brine 16634 365
2015 ARTEX OIL COMPANY Brine 13072 365
2016 ARTEX OIL COMPANY Brine 12994 365
2017 ARTEX OIL COMPANY Brine 8556 365
2018 ARTEX OIL COMPANY Brine 24106 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1089293714 2020-4-13 0:00: FR No Violations 2.00
-1823540444 2019-9-4 0:00:0 PB No Violations 0.10
-2095025939 2019-9-3 0:00:0 PB No Violations 4.00
-589833422 2019-9-5 0:00:0 PB No Violations 0.10
0172534849 2013-06-18 Drill / Deepen / Reopen No Violations Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
0587186355 2013-10-30 Preliminary Restoration No Violations Preliminary restoration is passed in accordance to 1509.072.
0603729202 2013-06-03 Drill / Deepen / Reopen No Violations I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artexs most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.
1363295307 2013-03-14 Drill / Deepen / Reopen No Violations I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 739. The casing shoe depth was 687. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
1369850646 2013-05-29 Drill / Deepen / Reopen No Violations Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
1492187248 2013-04-03 Drill / Deepen / Reopen No Violations All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.
1567772565 2019-9-6 0:00:0 PB No Violations 0.10
172534849 2013-6-18 0:00: DD No Violations 3.50
325088203 2019-9-9 0:00:0 PB No Violations 3.50
330463697 2019-8-27 0:00: PB No Violations 3.00
587186355 2013-10-30 0:00 PL No Violations 0.30
603729202 2013-6-3 0:00:0 DD No Violations 0.50
812259431 2019-8-29 0:00: PB No Violations 9.00

For data sources see[9]

References