X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-155-24060"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-155-24060
 
| Well ID: 34-155-24060
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.45879628, -80.68638866 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.45, -80.68 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Trumbull County, Ohio|Trumbull]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Trumbull_County,_Ohio|Trumbull]]
 +
|-
 +
| Municipality: [[Gustavus_Township,_Trumbull_County,_Ohio|Gustavus Township]]
 
|-
 
|-
 
| Operator Name: [[BRAMMER ENGINEERING INC]]
 
| Operator Name: [[BRAMMER ENGINEERING INC]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: ROSCOE
 
|-
 
|-
| First Permit Date:  
+
| License Status: Final Restoration
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2014-07-21
 
|-
 
|-
 
| Spud Date: 2013-04-13
 
| Spud Date: 2013-04-13
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[H A D INC]]
 +
|-
 +
| Final Drill Date: 2013-05-07
 +
|-
 +
| Well Total Depth: 6510.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Final Restoration
+
| Latitude: 41.450000
 +
|-
 +
| Longitude: -80.680000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2012-12-11
 +
| Proposed Formations:UTICA SHALE, Issued Date:12/11/2012, Expired Date:12/11/2014 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:ST, Proposed Well Class:STRT
 +
|-
 +
| Plugged Back
 +
| 2013-05-06
 +
|
 +
|-
 +
| Reached Total Depth
 +
| 2013-05-07
 +
|
 +
|-
 +
| Completion Report Received
 +
| 2013-06-14
 +
|
 +
|-
 +
| APP
 +
| 2014-07-21
 +
| Proposed Formations:UTICA, Issued Date:7/21/2014, Expired Date:7/20/2016 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:
 
|-
 
|-
| Violations: 0
+
| Plugged/Abandoned
 +
| 2014-08-14
 +
|
 
|-
 
|-
| Latitude: 41.45879628
+
| Construction Permit Expires
 +
| 2016-07-20
 +
|
 
|-
 
|-
| Longitude: -80.68638866
+
| Record Last Modified
 +
| 2017-10-23
 +
|
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| -1501659596
 +
| 2013-4-24 0:00:
 +
| DD
 +
| No Violations
 +
|
 +
|-
 +
| -1591732683
 +
| 2014-9-3 0:00:0
 +
| FR
 +
| No Violations
 +
| 0.50
 
|-
 
|-
 
| 1362421302
 
| 1362421302
 
| 2013-03-04
 
| 2013-03-04
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| My inspection found construction equipment and supplies on location.  New limestone gravel and a culvert was installed at the lease road entrance.  Drainage controls were started with 8 socks.  Well pad and lease road construction are expected to begin with the next 2 weeks.
 
| My inspection found construction equipment and supplies on location.  New limestone gravel and a culvert was installed at the lease road entrance.  Drainage controls were started with 8 socks.  Well pad and lease road construction are expected to begin with the next 2 weeks.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1366040373
 
| 1366040373
 
| 2013-04-15
 
| 2013-04-15
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| My inspection today found that the rig crew had lost a sledgehammer down the conductor hole and were attempting to retrieve it. The loose topsoil had been piled to the north east corner of the location and had been seeded and straw had been spread to prevent erosion. The dike around the location had been seeded and straw had been spread. The rig containment was in good repair. The lease road and rig pad was in good repair. Silt screen fencing was buried to the proper depth and was surrounding the entire location. The permit was posted in the company trailer. Fire extinguishers were available in multiple locations.
 
| My inspection today found that the rig crew had lost a sledgehammer down the conductor hole and were attempting to retrieve it. The loose topsoil had been piled to the north east corner of the location and had been seeded and straw had been spread to prevent erosion. The dike around the location had been seeded and straw had been spread. The rig containment was in good repair. The lease road and rig pad was in good repair. Silt screen fencing was buried to the proper depth and was surrounding the entire location. The permit was posted in the company trailer. Fire extinguishers were available in multiple locations.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1366128867
 
| 1366128867
 
| 2013-04-15
 
| 2013-04-15
|  
+
| Drill / Deepen /  Reopen
| I was on location for the cementing of the conductor casing. The drill depth was 306ft, with a 24 inch hole and 20 inch conductor casing placed at a depth of 306 ft. The float collar was set at a depth of 262 ft with 44' of shoe.  The proper circulation was established and cementing was started by Halliburton using Class A cement with 75 % excess brought for the job. There was approximately 52 BBLs of cement returns. The beginning mud scale of cement was a density of 15.7 pounds per gallon (ppg) and was held at 15.8 ppg for the rest of the cementing job. The plug was displaced using 93.06 BBLs of fresh water. Once the plug landed, Halliburton held 500 psi for 5 minutes.  The well site was in good repair with the proper containment in place. The lease road and well pad were in stable condition. The permit was in the company man's trailer. Fire extinguishers were readily available during the job.
+
| No Violations
|
+
| I was on location for the cementing of the conductor casing. The drill depth was 306ft, with a 24 inch hole and 20 inch conductor casing placed at a depth of 306 ft. The float collar was set at a depth of 262 ft with 44 of shoe.  The proper circulation was established and cementing was started by Halliburton using Class A cement with 75 % excess brought for the job. There was approximately 52 BBLs of cement returns. The beginning mud scale of cement was a density of 15.7 pounds per gallon (ppg) and was held at 15.8 ppg for the rest of the cementing job. The plug was displaced using 93.06 BBLs of fresh water. Once the plug landed, Halliburton held 500 psi for 5 minutes.  The well site was in good repair with the proper containment in place. The lease road and well pad were in stable condition. The permit was in the company mans trailer. Fire extinguishers were readily available during the job.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1368451654
 
| 1368451654
 
| 2013-05-13
 
| 2013-05-13
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| My inspection found the HAD 105 rig off location and the well shut-in.  Brammer/BP plan to move a Nabors rig onto location for the horizontal portion within the next three months.
 
| My inspection found the HAD 105 rig off location and the well shut-in.  Brammer/BP plan to move a Nabors rig onto location for the horizontal portion within the next three months.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1369062240
 
| 1369062240
 
| 2013-05-20
 
| 2013-05-20
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| My inspection found the well shut in.  Drainage and erosion controls were working properly.  Brammer Engineering was waiting on a rig to drill the horizontal; no violations at this time.
 
| My inspection found the well shut in.  Drainage and erosion controls were working properly.  Brammer Engineering was waiting on a rig to drill the horizontal; no violations at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1378061784
 
| 1378061784
 
| 2013-04-16
 
| 2013-04-16
|  
+
| Drill / Deepen /  Reopen
| My inspection found Brammer cleaning tanks in preparation to air drill Hole #2.  The drilling permit was posted in the company man's trailer; no violations.
+
| No Violations
|
+
| My inspection found Brammer cleaning tanks in preparation to air drill Hole #2.  The drilling permit was posted in the company mans trailer; no violations.
|
 
|
 
|-
 
 
|-
 
|-
| -1501659596
+
| 1501659596
 
| 2013-04-24
 
| 2013-04-24
|  
+
| Drill / Deepen /  Reopen
| Currently at a depth of 3045' and drilling to a depth of 3327'. No problems were reported during the drilling process. Nothing else has changed on location since my last inspection.
+
| No Violations
|
+
| Currently at a depth of 3045 and drilling to a depth of 3327. No problems were reported during the drilling process. Nothing else has changed on location since my last inspection.
|
 
|
 
 
|-
 
|-
|-
+
| 1591732683
| -1591732683
 
 
| 2014-09-03
 
| 2014-09-03
|  
+
| Final Restoration
 +
| No Violations
 
| I was on location for a final restoration.  I found during my inspection the site graded and seeded.  All of the production equipment was removed.  All of the debris was removed.  The lease road was restored, graded, and seeded.  The colvert was removed and the ditch restored.  No pits were used; all returns were placed in half-round containers.
 
| I was on location for a final restoration.  I found during my inspection the site graded and seeded.  All of the production equipment was removed.  All of the debris was removed.  The lease road was restored, graded, and seeded.  The colvert was removed and the ditch restored.  No pits were used; all returns were placed in half-round containers.
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 12:12, 12 January 2021

Well Details

Well ID: 34-155-24060
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Gustavus Township
Operator Name: BRAMMER ENGINEERING INC
Well Pad ID:
Farm/Lease Name: ROSCOE
License Status: Final Restoration
License Date: 2014-07-21
Spud Date: 2013-04-13
Spud Drilling Contractor: H A D INC
Final Drill Date: 2013-05-07
Well Total Depth: 6510.00 ft
Configuration: Vertical
Latitude: 41.450000
Longitude: -80.680000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-12-11 Proposed Formations:UTICA SHALE, Issued Date:12/11/2012, Expired Date:12/11/2014 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:ST, Proposed Well Class:STRT
Plugged Back 2013-05-06
Reached Total Depth 2013-05-07
Completion Report Received 2013-06-14
APP 2014-07-21 Proposed Formations:UTICA, Issued Date:7/21/2014, Expired Date:7/20/2016 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2014-08-14
Construction Permit Expires 2016-07-20
Record Last Modified 2017-10-23

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1501659596 2013-4-24 0:00: DD No Violations
-1591732683 2014-9-3 0:00:0 FR No Violations 0.50
1362421302 2013-03-04 Drill / Deepen / Reopen No Violations My inspection found construction equipment and supplies on location. New limestone gravel and a culvert was installed at the lease road entrance. Drainage controls were started with 8 socks. Well pad and lease road construction are expected to begin with the next 2 weeks.
1366040373 2013-04-15 Drill / Deepen / Reopen No Violations My inspection today found that the rig crew had lost a sledgehammer down the conductor hole and were attempting to retrieve it. The loose topsoil had been piled to the north east corner of the location and had been seeded and straw had been spread to prevent erosion. The dike around the location had been seeded and straw had been spread. The rig containment was in good repair. The lease road and rig pad was in good repair. Silt screen fencing was buried to the proper depth and was surrounding the entire location. The permit was posted in the company trailer. Fire extinguishers were available in multiple locations.
1366128867 2013-04-15 Drill / Deepen / Reopen No Violations I was on location for the cementing of the conductor casing. The drill depth was 306ft, with a 24 inch hole and 20 inch conductor casing placed at a depth of 306 ft. The float collar was set at a depth of 262 ft with 44 of shoe. The proper circulation was established and cementing was started by Halliburton using Class A cement with 75 % excess brought for the job. There was approximately 52 BBLs of cement returns. The beginning mud scale of cement was a density of 15.7 pounds per gallon (ppg) and was held at 15.8 ppg for the rest of the cementing job. The plug was displaced using 93.06 BBLs of fresh water. Once the plug landed, Halliburton held 500 psi for 5 minutes. The well site was in good repair with the proper containment in place. The lease road and well pad were in stable condition. The permit was in the company mans trailer. Fire extinguishers were readily available during the job.
1368451654 2013-05-13 Drill / Deepen / Reopen No Violations My inspection found the HAD 105 rig off location and the well shut-in. Brammer/BP plan to move a Nabors rig onto location for the horizontal portion within the next three months.
1369062240 2013-05-20 Drill / Deepen / Reopen No Violations My inspection found the well shut in. Drainage and erosion controls were working properly. Brammer Engineering was waiting on a rig to drill the horizontal; no violations at this time.
1378061784 2013-04-16 Drill / Deepen / Reopen No Violations My inspection found Brammer cleaning tanks in preparation to air drill Hole #2. The drilling permit was posted in the company mans trailer; no violations.
1501659596 2013-04-24 Drill / Deepen / Reopen No Violations Currently at a depth of 3045 and drilling to a depth of 3327. No problems were reported during the drilling process. Nothing else has changed on location since my last inspection.
1591732683 2014-09-03 Final Restoration No Violations I was on location for a final restoration. I found during my inspection the site graded and seeded. All of the production equipment was removed. All of the debris was removed. The lease road was restored, graded, and seeded. The colvert was removed and the ditch restored. No pits were used; all returns were placed in half-round containers.

For data sources see[3]

References