== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-155-24076
 
| Well ID: 34-155-24076
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.1954137677, -80.7749712554 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.19, -80.77 | width=100% | height=100% }}
 
|-
 
|-
| County:
+
| Country: United States
 
|-
 
|-
| Municipality:
+
| State: Ohio
 
|-
 
|-
| Operator Name:
+
| County: [[Trumbull_County,_Ohio|Trumbull]]
 
|-
 
|-
| Well Pad ID:
+
| Municipality: [[Weathersfield_Township,_Trumbull_County,_Ohio|Weathersfield Township]]
 
|-
 
|-
| Farm/Lease Name:
+
| Operator Name: [[AWMS WATER SOLUTIONS LLC]]
 
|-
 
|-
| First Permit Date:
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date:
+
| Farm/Lease Name: AWMS-1 (SWIW #21)
 +
|-
 +
| License Status: Active Injection
 +
|-
 +
| License Date: 2013-07-18
 
|-
 
|-
 
| Spud Date: 2013-09-13
 
| Spud Date: 2013-09-13
 
|-
 
|-
| Unconventional:
+
| Spud Drilling Contractor: [[WHIPSTOCK OHIO DRILLING]]
 +
|-
 +
| Final Drill Date: 2013-11-02
 +
|-
 +
| Well Total Depth: 4403.00 ft
 +
|-
 +
| Configuration: Vertical
 +
|-
 +
| Latitude: 41.190000
 +
|-
 +
| Longitude: -80.770000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2013-07-18
 +
| Proposed Formations:NEWBURG ZONE/LOCKPORT FORMATION, Issued Date:7/18/2013, Expired Date:7/18/2015 12:00:00 PM, Drilling unit acres:101, Proposed Well Type:SWD, Proposed Well Class:SWIW
 +
|-
 +
| Reached Total Depth
 +
| 2013-11-02
 +
|
 +
|-
 +
| Annulus Pressure Monitoring Approved
 +
| 2014-02-06
 +
|
 
|-
 
|-
| Horizontal:
+
| Last Compliance Report
 +
| 2014-03-04
 +
|
 
|-
 
|-
| Producing: No
+
| Completion Report Received
 +
| 2014-03-18
 +
|
 
|-
 
|-
| Violations: 0
+
| Construction Permit Expires
 +
| 2014-07-18
 +
|
 
|-
 
|-
| Latitude: 41.1954137677
+
| Change of Owner
 +
| 2015-04-22
 +
| Operator changed from 8905, AMERICAN WATER MGMT SERV LLC to 9475, AWMS WATER SOLUTIONS LLC
 
|-
 
|-
| Longitude: -80.7749712554
+
| Record Last Modified
 +
| 2017-02-10
 +
|
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | OIL QUANTITY
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|
 +
| ACID
 +
| style="text-align: right;" | 28
 +
| style="text-align: right;" | 2800 Gal
 +
| style="text-align: right;" | 0
 +
|
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | TYPE
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | QUANTITY
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
!scope="col" | UNITS
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
!scope="col" | DISPOSAL METHOD
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | WASTE FACILITY PERMIT ID
+
|-
!scope="col" | WASTE FACILITY NAME
+
|}-->
!scope="col" | FACILITY CITY
+
<!--== Waste Data ==
!scope="col" | FACILITY STATE
+
{| class="wikitable sortable"
|}
+
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION_COMMENT
+
| -100476782
 +
| 2014-11-24 0:00
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| -1007852085
 +
| 2019-4-24 0:00:
 +
| SW
 +
| No Violations
 +
| 0.30
 
|-
 
|-
 
| -1136911182
 
| -1136911182
| 2013-09-17
+
| 2013-9-17 0:00:
|
+
| DD
| 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes.  Cement operation and site conditions were acceptable.
+
| No Violations
|
+
|  
|
 
|
 
 
|-
 
|-
 +
| -1334773061
 +
| 2015-7-24 0:00:
 +
| SW
 +
| No Violations
 +
|
 
|-
 
|-
 
| -1373242076
 
| -1373242076
| 2014-02-05
+
| 2014-2-5 0:00:0
|
+
| SW
| The packer installation was witnessed.  A Baker Lok-set was ran on 4-1/2 inch tubing.
+
| No Violations
|
+
|  
|
 
|
 
 
|-
 
|-
 +
| -1572713805
 +
| 2017-6-5 0:00:0
 +
| SW
 +
| No Violations
 +
|
 
|-
 
|-
 
| -1817113630
 
| -1817113630
| 2013-10-22
+
| 2013-10-22 0:00
|
+
| DD
| The cementing of the surface casing was witnessed. 644 feet of 13-3/8 inch casing were cemented with 600 sacks of class A cement. Good cement return was observed. Cement operation and site conditions were acceptable.
+
| No Violations
|
+
|
|
+
|-
|
+
| -1865546039
 +
| 2014-5-14 0:00:
 +
| SC
 +
| No Violations
 +
|
 +
|-
 +
| -192081232
 +
| 2014-6-20 0:00:
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| -2025638875
 +
| 2015-12-21 0:00
 +
| SW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -2131954554
 +
| 2016-7-14 0:00:
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| -2138943198
 +
| 2016-12-7 0:00:
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| -324920560
 +
| 2018-11-1 0:00:
 +
| SW
 +
| No Violations
 +
| 0.30
 +
|-
 +
| -537140987
 +
| 2013-10-18 0:00
 +
| DD
 +
| No Violations
 +
|
 +
|-
 +
| -572041850
 +
| 2015-6-3 0:00:0
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| -614503169
 +
| 2014-1-14 0:00:
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| -621866572
 +
| 2018-1-11 0:00:
 +
| SW
 +
| No Violations
 +
| 0.50
 +
|-
 +
| -652393234
 +
| 2015-9-14 0:00:
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| -761326602
 +
| 2020-1-2 0:00:0
 +
| SW
 +
| No Violations
 +
| 0.30
 +
|-
 +
| -797752620
 +
| 2014-1-13 0:00:
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| -801186749
 +
| 2017-9-26 0:00:
 +
| SW
 +
| No Violations
 +
| 0.50
 +
|-
 +
| -813859798
 +
| 2015-2-13 0:00:
 +
| SW
 +
| No Violations
 +
|  
 +
|-
 +
| -976755355
 +
| 2013-11-12 0:00
 +
| DD
 +
| No Violations
 +
|
 +
|-
 +
| 0046840800
 +
| 2016-05-17
 +
| Salt Water Injection Well
 +
| No Violations
 +
| At the time of my inspection, I found the well not in operation.  The facility is closed.  The chain link fence surrounding the tank battery and well is secure with a lock.  An identification sign is posted on the fence.  The access road is in good repair with a locked gate at the entrance.
 
|-
 
|-
 +
| 0081868864
 +
| 2018-06-26
 +
| Salt Water Injection Well
 +
| No Violations
 +
| I found the injection well shut-in.  The ball valve on the tubing is closed.  I observed no spills or leaks.  The facility and well are secure with a locked chain link fence.  The office and pump room are secure and locked.  An identification sign is posted.
 
|-
 
|-
| -1865546039
+
| 0100476782
| 2014-05-14
+
| 2014-11-24
|
+
| Salt Water Injection Well
| The purpose of this inspection was to review the construction of the surface facility.
+
| No Violations
My inspection was accompanied by Tom Tomastik and Andrew AdgateWe met with Steve Kilper, with American Water Management Services.
+
| The injection well and surface facility were inspectedThere were no violations found at the time.
The surface facility construction was consistent with the facility plan and met all permit specifications.
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 0131260748
 +
| 2013-09-12
 +
| Salt Water Injection Well
 +
| No Violations
 +
| Express Energy Services installed a cellar.  A corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck.
 
|-
 
|-
| -192081232
+
| 0192081232
 
| 2014-06-20
 
| 2014-06-20
|
+
| Salt Water Injection Well
 +
| No Violations
 
| A mechanical integrity test on the injection line was attempted.  Several fittings leaked, once pressure was placed on the injection line.  The test failed.
 
| A mechanical integrity test on the injection line was attempted.  Several fittings leaked, once pressure was placed on the injection line.  The test failed.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0324920560
 +
| 2018-11-01
 +
| Salt Water Injection Well
 +
| No Violations
 +
| I found the injection well shut-in with closed valves on the injection tubing and injection line.  The chain link fence surrounding the diked tank battery and injection well is locked.  Identification signs are posted.  The office and pump house are secure and locked.  I observed no spills or leaks.  There are a few inches of rain water in the dike from the recent weather conditions.
 
|-
 
|-
| -537140987
+
| 0357311163
 +
| 2013-10-28
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The cementing of an 8-5/8 inch casing was witnessed.  4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement.  The cement operation and site conditions were acceptable.
 +
|-
 +
| 0406758782
 +
| 2018-01-04
 +
| Salt Water Injection Well
 +
| No Violations
 +
| I was on location to inspect the UIC facility.  I found that the ball valve on the injection line at the wellhead had split apart at the threads.  There was frozen black material within the ball valve and the injection line.  The injection well was not in operation.  The facility was locked.  The chain link fence around the tank battery and well was secure with a lock.  The proper identification sign was posted.  I spoke with Steve Kilper from AWMS concerning the damaged ball valve.  Mr. Kilper stated the ball valve would have the ball valve repair and will notify me once complete.
 +
|-
 +
| 0537140987
 
| 2013-10-18
 
| 2013-10-18
|
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The operator was digging the reserve pit.  All conditions were acceptable.
 
| The operator was digging the reserve pit.  All conditions were acceptable.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0572041850
 +
| 2015-06-03
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The well and surface facility were inspected.  There were no violations found at the time of inspection.
 +
|-
 +
| 0602398661
 +
| 2013-10-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners.
 
|-
 
|-
| -614503169
+
| 0614503169
 
| 2014-01-14
 
| 2014-01-14
|
+
| Salt Water Injection Well
 +
| No Violations
 
| The well owner was staging frac tanks on location.  All conditions were acceptable.
 
| The well owner was staging frac tanks on location.  All conditions were acceptable.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0621866572
 +
| 2018-01-11
 +
| Salt Water Injection Well
 +
| No Violations
 +
-in and the injection line inside of the pump house is disconnected to isolate the line until the repair is completed.
 +
|-
 +
| 0652393234
 +
| 2015-09-14
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The injection well and surface facility were inspected.  There were no violations found at the time.
 +
|-
 +
| 0782039637
 +
| 2014-11-07
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The injection well and surface facility were inspected.  There were no violations found at the time.
 
|-
 
|-
| -797752620
+
| 0797752620
 
| 2014-01-13
 
| 2014-01-13
|
+
| Salt Water Injection Well
 +
| No Violations
 
| A contractor was cleaning the rig mats.  Construction continues on pump house and unloading sump.  The working pit was mucked out into the reserve pit.  Approximately a third of the pits contained dry off-spec cement.
 
| A contractor was cleaning the rig mats.  Construction continues on pump house and unloading sump.  The working pit was mucked out into the reserve pit.  Approximately a third of the pits contained dry off-spec cement.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0801186749
 +
| 2017-09-26
 +
| Salt Water Injection Well
 +
| No Violations
 +
| There were no changes since the last inspection.  The well is currently shut-in.  The access gate around the tank battery and well is locked.  The facility is locked and secure.  There is an identification sign posted.
 +
|-
 +
| 0813859798
 +
| 2015-02-13
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The injection well and surface facility were inspected.  The annulus was frozen.  There were no violations found at the time.
 +
|-
 +
| 0902592774
 +
| 2013-11-19
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The drilling rig, currently at 1238 feet, was making a bit trip.  All conditions were acceptable.
 
|-
 
|-
| -976755355
+
| 0931510417
 +
| 2016-03-17
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The injection well and surface facility were inspected.  The facility was closed and the well was not in use.  The facility fence was secure.
 +
|-
 +
| 0976755355
 
| 2013-11-12
 
| 2013-11-12
|
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The drilling rig was moving onto the pad.  All conditions were acceptable.
 
| The drilling rig was moving onto the pad.  All conditions were acceptable.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1045140964
 +
| 2019-6-13 0:00:
 +
| SW
 +
| No Violations
 +
| 0.20
 +
|-
 +
| 1136911182
 +
| 2013-09-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes.  Cement operation and site conditions were acceptable.
 
|-
 
|-
 
| 1255733067
 
| 1255733067
 
| 2013-09-16
 
| 2013-09-16
|
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The contractor attempted to install 100 feet of conductor.  The bore hole was obstructed.
 
| The contractor attempted to install 100 feet of conductor.  The bore hole was obstructed.
  
 
The bore hole will have to be cleaned-out.
 
The bore hole will have to be cleaned-out.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1310577935
 
| 1310577935
 
| 2014-03-04
 
| 2014-03-04
|
+
| Salt Water Injection Well
 +
| No Violations
 
| Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time.
 
| Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time.
|
 
|
 
|
 
 
|-
 
|-
 +
| 131260748
 +
| 2013-9-12 0:00:
 +
| SW
 +
| No Violations
 +
|
 
|-
 
|-
| 131260748
+
| 1334773061
| 2013-09-12
+
| 2015-07-24
|
+
| Salt Water Injection Well
| Express Energy Services installed a cellarA corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck.
+
| No Violations
|
+
| The well and surface facility were inspectedThere were no violations found at the time of inspection.
|
 
|
 
 
|-
 
|-
 +
| 1373242076
 +
| 2014-02-05
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The packer installation was witnessed.  A Baker Lok-set was ran on 4-1/2 inch tubing.
 
|-
 
|-
 
| 1382439002
 
| 1382439002
 
| 2013-09-13
 
| 2013-09-13
|
+
| Salt Water Injection Well
 +
| No Violations
 
| 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete.  Cement operation and site conditions were acceptable.
 
| 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete.  Cement operation and site conditions were acceptable.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1384787230
 
| 1384787230
 
| 2013-11-15
 
| 2013-11-15
|
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The rig was drilling surface hole on fluid at 370 feet.  Conditions were acceptable.
 
| The rig was drilling surface hole on fluid at 370 feet.  Conditions were acceptable.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1492719573
 +
| 2017-01-27
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The injection well and surface facility were inspected.  The well was not in use.  There were no violations found at the time.
 +
|-
 +
| 1518105393
 +
| 2018-02-08
 +
| Salt Water Injection Well
 +
| No Violations
 +
| I was on location to inspect the injection well.  I found the 2 ball valve on the injection line at the wellhead repaired.  I observed no leaks of spills.  The UIC facility and well are secure with a locked chain link fence.  Identification signs are posted.  There are no violations at this time.
 +
|-
 +
| 1547492740
 +
| 2019-01-14
 +
| Salt Water Injection Well
 +
| No Violations
 +
| I found no evidence of recent activity.  The injection well is shut-in.  The facility and well are secure with a locked chain link fence.  Identification sign is posted.  The office/pump house is locked.
 +
|-
 +
| 1572713805
 +
| 2017-06-05
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The injection well and surface facility were inspected.  No change since last inspection and no sign of recent activity.
 +
|-
 +
| 1573136348
 +
| 2019-11-4 0:00:
 +
| SW
 +
| No Violations
 +
| 0.70
 
|-
 
|-
 
| 1604560327
 
| 1604560327
 
| 2013-09-17
 
| 2013-09-17
|
+
| Drill / Deepen /  Reopen
| I witnessed Express Energy Serviced cement the conductor casing for American Water.  Express drilled a 26" Hole #2 to 100' and set 20" casing at 95'.  Express established circulation and pumped 260 sacks of Class A cement.  The operator displaced the cement to approximately 90' with 32 bbls of fresh water.  I witnessed approximately 50 bbls of good cement returned to surface.  Cement held static at surface after 20 minutes.
+
| No Violations
|
+
| I witnessed Express Energy Serviced cement the conductor casing for American Water.  Express drilled a 26 Hole #2 to 100 and set 20 casing at 95.  Express established circulation and pumped 260 sacks of Class A cement.  The operator displaced the cement to approximately 90 with 32 bbls of fresh water.  I witnessed approximately 50 bbls of good cement returned to surface.  Cement held static at surface after 20 minutes.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1706513039
 
| 1706513039
 
| 2014-02-06
 
| 2014-02-06
|
+
| Salt Water Injection Well
 +
| No Violations
 
| A mechanical integrity test was performed on the well.  1240 psi. of pressure was placed on the tubing/casing annulus.  The test passed.
 
| A mechanical integrity test was performed on the well.  1240 psi. of pressure was placed on the tubing/casing annulus.  The test passed.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1764875238
 
| 1764875238
 
| 2014-04-03
 
| 2014-04-03
|
+
| Surface Facility Construction
 +
| No Violations
 
| An inspection of the injection facility found no violations.
 
| An inspection of the injection facility found no violations.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1817113630
 +
| 2013-10-22
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The cementing of the surface casing was witnessed.  644 feet of 13-3/8 inch casing were cemented with 600 sacks of class A cement.  Good cement return was observed.  Cement operation and site conditions were acceptable.
 +
|-
 +
| 1846048608
 +
| 2017-11-07
 +
| Salt Water Injection Well
 +
| No Violations
 +
| There were no changes since the last inspection.  The well is currently shut-in.  The access gate around the tank battery and well is locked.  The facility is locked and secure.  There is an identification sign posted on the fencing and at the well.
 
|-
 
|-
 
| 1846825825
 
| 1846825825
 
| 2013-11-04
 
| 2013-11-04
|
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The operator was closing the working pits.  The contents were sucked out using a vacuum truck.  The pit liner will be hauled to a land fill.  All conditions were acceptable.
 
| The operator was closing the working pits.  The contents were sucked out using a vacuum truck.  The pit liner will be hauled to a land fill.  All conditions were acceptable.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1865546039
 +
| 2014-05-14
 +
| Surface Facility Construction
 +
| No Violations
 +
| The purpose of this inspection was to review the construction of the surface facility.
 +
My inspection was accompanied by Tom Tomastik and Andrew Adgate.  We met with Steve Kilper, with American Water Management Services.
 +
The surface facility construction was consistent with the facility plan and met all permit specifications.
 +
|-
 +
| 1960658300
 +
| 2020-4-20 0:00:
 +
| SW
 +
| No Violations
 +
| 0.30
 +
|-
 +
| 1993548411
 +
| 2014-07-28
 +
| Salt Water Injection Well
 +
| No Violations
 +
| An inspection of the well and injection facility found no violations.
 +
|-
 +
| 2025638875
 +
| 2015-12-21
 +
| Salt Water Injection Well
 +
| No Violations
 +
| I was on location to inspect the injection well and facility.  I found the facility closed and gate at the entrance locked.
 +
|-
 +
| 2031811847
 +
| 2018-07-25
 +
| Salt Water Injection Well
 +
| No Violations
 +
| I found the injection well not in operation.  There is no evidence of recent activity.  The facility and wellhead are secure with a locked chain link fence.  An identification sign is posted.  The office and pump house are locked.  I observed no leaks or spills.  There is overgrown vegetation around the wellhead.
 +
|-
 +
| 2131954554
 +
| 2016-07-14
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The injection well and surface facility were inspected.  There were no violations found at the time.
 +
|-
 +
| 2138943198
 +
| 2016-12-07
 +
| Salt Water Injection Well
 +
| No Violations
 +
| The injection well and surface facility were inspected.  There were no violations at the time.
 +
|-
 +
| 228248833
 +
| 2020-8-12 0:00:
 +
| SW
 +
| No Violations
 +
|
 
|-
 
|-
 
| 357311163
 
| 357311163
| 2013-10-28
+
| 2013-10-28 0:00
|
+
| DD
| The cementing of an 8-5/8 inch casing was witnessed.  4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement.  The cement operation and site conditions were acceptable.
+
| No Violations
|
+
|  
|
+
|-
|
+
| 406758782
 +
| 2018-1-4 0:00:0
 +
| SW
 +
| No Violations
 +
| 0.30
 
|-
 
|-
 +
| 46840800
 +
| 2016-5-17 0:00:
 +
| SW
 +
| No Violations
 +
| 1.00
 
|-
 
|-
 
| 602398661
 
| 602398661
| 2013-10-17
+
| 2013-10-17 0:00
|
+
| DD
| I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners.
+
| No Violations
|
+
| 3.00
|
+
|-
|
+
| 606033661
 +
| 2020-3-6 0:00:0
 +
| SW
 +
| No Violations
 +
| 0.30
 +
|-
 +
| 782039637
 +
| 2014-11-7 0:00:
 +
| SW
 +
| No Violations
 +
|  
 
|-
 
|-
 +
| 81868864
 +
| 2018-6-26 0:00:
 +
| SW
 +
| No Violations
 +
| 1.00
 
|-
 
|-
 
| 902592774
 
| 902592774
| 2013-11-19
+
| 2013-11-19 0:00
|
+
| DD
| The drilling rig, currently at 1238 feet, was making a bit trip.  All conditions were acceptable.
+
| No Violations
|
+
|
|
+
|-
|
+
| 931510417
 +
| 2016-3-17 0:00:
 +
| SW
 +
| No Violations
 +
|
 +
|-
 +
| 952378974
 +
| 2019-7-31 0:00:
 +
| SW
 +
| No Violations
 +
| 1.00
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 12:13, 12 January 2021

Well Details

Well ID: 34-155-24076
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Weathersfield Township
Operator Name: AWMS WATER SOLUTIONS LLC
Well Pad ID:
Farm/Lease Name: AWMS-1 (SWIW #21)
License Status: Active Injection
License Date: 2013-07-18
Spud Date: 2013-09-13
Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING
Final Drill Date: 2013-11-02
Well Total Depth: 4403.00 ft
Configuration: Vertical
Latitude: 41.190000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-18 Proposed Formations:NEWBURG ZONE/LOCKPORT FORMATION, Issued Date:7/18/2013, Expired Date:7/18/2015 12:00:00 PM, Drilling unit acres:101, Proposed Well Type:SWD, Proposed Well Class:SWIW
Reached Total Depth 2013-11-02
Annulus Pressure Monitoring Approved 2014-02-06
Last Compliance Report 2014-03-04
Completion Report Received 2014-03-18
Construction Permit Expires 2014-07-18
Change of Owner 2015-04-22 Operator changed from 8905, AMERICAN WATER MGMT SERV LLC to 9475, AWMS WATER SOLUTIONS LLC
Record Last Modified 2017-02-10

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 28 2800 Gal 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-100476782 2014-11-24 0:00 SW No Violations
-1007852085 2019-4-24 0:00: SW No Violations 0.30
-1136911182 2013-9-17 0:00: DD No Violations
-1334773061 2015-7-24 0:00: SW No Violations
-1373242076 2014-2-5 0:00:0 SW No Violations
-1572713805 2017-6-5 0:00:0 SW No Violations
-1817113630 2013-10-22 0:00 DD No Violations
-1865546039 2014-5-14 0:00: SC No Violations
-192081232 2014-6-20 0:00: SW No Violations
-2025638875 2015-12-21 0:00 SW No Violations 1.00
-2131954554 2016-7-14 0:00: SW No Violations
-2138943198 2016-12-7 0:00: SW No Violations
-324920560 2018-11-1 0:00: SW No Violations 0.30
-537140987 2013-10-18 0:00 DD No Violations
-572041850 2015-6-3 0:00:0 SW No Violations
-614503169 2014-1-14 0:00: SW No Violations
-621866572 2018-1-11 0:00: SW No Violations 0.50
-652393234 2015-9-14 0:00: SW No Violations
-761326602 2020-1-2 0:00:0 SW No Violations 0.30
-797752620 2014-1-13 0:00: SW No Violations
-801186749 2017-9-26 0:00: SW No Violations 0.50
-813859798 2015-2-13 0:00: SW No Violations
-976755355 2013-11-12 0:00 DD No Violations
0046840800 2016-05-17 Salt Water Injection Well No Violations At the time of my inspection, I found the well not in operation. The facility is closed. The chain link fence surrounding the tank battery and well is secure with a lock. An identification sign is posted on the fence. The access road is in good repair with a locked gate at the entrance.
0081868864 2018-06-26 Salt Water Injection Well No Violations I found the injection well shut-in. The ball valve on the tubing is closed. I observed no spills or leaks. The facility and well are secure with a locked chain link fence. The office and pump room are secure and locked. An identification sign is posted.
0100476782 2014-11-24 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0131260748 2013-09-12 Salt Water Injection Well No Violations Express Energy Services installed a cellar. A corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck.
0192081232 2014-06-20 Salt Water Injection Well No Violations A mechanical integrity test on the injection line was attempted. Several fittings leaked, once pressure was placed on the injection line. The test failed.
0324920560 2018-11-01 Salt Water Injection Well No Violations I found the injection well shut-in with closed valves on the injection tubing and injection line. The chain link fence surrounding the diked tank battery and injection well is locked. Identification signs are posted. The office and pump house are secure and locked. I observed no spills or leaks. There are a few inches of rain water in the dike from the recent weather conditions.
0357311163 2013-10-28 Drill / Deepen / Reopen No Violations The cementing of an 8-5/8 inch casing was witnessed. 4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement. The cement operation and site conditions were acceptable.
0406758782 2018-01-04 Salt Water Injection Well No Violations I was on location to inspect the UIC facility. I found that the ball valve on the injection line at the wellhead had split apart at the threads. There was frozen black material within the ball valve and the injection line. The injection well was not in operation. The facility was locked. The chain link fence around the tank battery and well was secure with a lock. The proper identification sign was posted. I spoke with Steve Kilper from AWMS concerning the damaged ball valve. Mr. Kilper stated the ball valve would have the ball valve repair and will notify me once complete.
0537140987 2013-10-18 Drill / Deepen / Reopen No Violations The operator was digging the reserve pit. All conditions were acceptable.
0572041850 2015-06-03 Salt Water Injection Well No Violations The well and surface facility were inspected. There were no violations found at the time of inspection.
0602398661 2013-10-17 Drill / Deepen / Reopen No Violations I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners.
0614503169 2014-01-14 Salt Water Injection Well No Violations The well owner was staging frac tanks on location. All conditions were acceptable.
0621866572 2018-01-11 Salt Water Injection Well No Violations

-in and the injection line inside of the pump house is disconnected to isolate the line until the repair is completed.

0652393234 2015-09-14 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0782039637 2014-11-07 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0797752620 2014-01-13 Salt Water Injection Well No Violations A contractor was cleaning the rig mats. Construction continues on pump house and unloading sump. The working pit was mucked out into the reserve pit. Approximately a third of the pits contained dry off-spec cement.
0801186749 2017-09-26 Salt Water Injection Well No Violations There were no changes since the last inspection. The well is currently shut-in. The access gate around the tank battery and well is locked. The facility is locked and secure. There is an identification sign posted.
0813859798 2015-02-13 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The annulus was frozen. There were no violations found at the time.
0902592774 2013-11-19 Drill / Deepen / Reopen No Violations The drilling rig, currently at 1238 feet, was making a bit trip. All conditions were acceptable.
0931510417 2016-03-17 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The facility was closed and the well was not in use. The facility fence was secure.
0976755355 2013-11-12 Drill / Deepen / Reopen No Violations The drilling rig was moving onto the pad. All conditions were acceptable.
1045140964 2019-6-13 0:00: SW No Violations 0.20
1136911182 2013-09-17 Drill / Deepen / Reopen No Violations 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes. Cement operation and site conditions were acceptable.
1255733067 2013-09-16 Drill / Deepen / Reopen No Violations The contractor attempted to install 100 feet of conductor. The bore hole was obstructed.

The bore hole will have to be cleaned-out.

1310577935 2014-03-04 Salt Water Injection Well No Violations Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time.
131260748 2013-9-12 0:00: SW No Violations
1334773061 2015-07-24 Salt Water Injection Well No Violations The well and surface facility were inspected. There were no violations found at the time of inspection.
1373242076 2014-02-05 Salt Water Injection Well No Violations The packer installation was witnessed. A Baker Lok-set was ran on 4-1/2 inch tubing.
1382439002 2013-09-13 Salt Water Injection Well No Violations 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete. Cement operation and site conditions were acceptable.
1384787230 2013-11-15 Drill / Deepen / Reopen No Violations The rig was drilling surface hole on fluid at 370 feet. Conditions were acceptable.
1492719573 2017-01-27 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The well was not in use. There were no violations found at the time.
1518105393 2018-02-08 Salt Water Injection Well No Violations I was on location to inspect the injection well. I found the 2 ball valve on the injection line at the wellhead repaired. I observed no leaks of spills. The UIC facility and well are secure with a locked chain link fence. Identification signs are posted. There are no violations at this time.
1547492740 2019-01-14 Salt Water Injection Well No Violations I found no evidence of recent activity. The injection well is shut-in. The facility and well are secure with a locked chain link fence. Identification sign is posted. The office/pump house is locked.
1572713805 2017-06-05 Salt Water Injection Well No Violations The injection well and surface facility were inspected. No change since last inspection and no sign of recent activity.
1573136348 2019-11-4 0:00: SW No Violations 0.70
1604560327 2013-09-17 Drill / Deepen / Reopen No Violations I witnessed Express Energy Serviced cement the conductor casing for American Water. Express drilled a 26 Hole #2 to 100 and set 20 casing at 95. Express established circulation and pumped 260 sacks of Class A cement. The operator displaced the cement to approximately 90 with 32 bbls of fresh water. I witnessed approximately 50 bbls of good cement returned to surface. Cement held static at surface after 20 minutes.
1706513039 2014-02-06 Salt Water Injection Well No Violations A mechanical integrity test was performed on the well. 1240 psi. of pressure was placed on the tubing/casing annulus. The test passed.
1764875238 2014-04-03 Surface Facility Construction No Violations An inspection of the injection facility found no violations.
1817113630 2013-10-22 Drill / Deepen / Reopen No Violations The cementing of the surface casing was witnessed. 644 feet of 13-3/8 inch casing were cemented with 600 sacks of class A cement. Good cement return was observed. Cement operation and site conditions were acceptable.
1846048608 2017-11-07 Salt Water Injection Well No Violations There were no changes since the last inspection. The well is currently shut-in. The access gate around the tank battery and well is locked. The facility is locked and secure. There is an identification sign posted on the fencing and at the well.
1846825825 2013-11-04 Drill / Deepen / Reopen No Violations The operator was closing the working pits. The contents were sucked out using a vacuum truck. The pit liner will be hauled to a land fill. All conditions were acceptable.
1865546039 2014-05-14 Surface Facility Construction No Violations The purpose of this inspection was to review the construction of the surface facility.

My inspection was accompanied by Tom Tomastik and Andrew Adgate. We met with Steve Kilper, with American Water Management Services. The surface facility construction was consistent with the facility plan and met all permit specifications.

1960658300 2020-4-20 0:00: SW No Violations 0.30
1993548411 2014-07-28 Salt Water Injection Well No Violations An inspection of the well and injection facility found no violations.
2025638875 2015-12-21 Salt Water Injection Well No Violations I was on location to inspect the injection well and facility. I found the facility closed and gate at the entrance locked.
2031811847 2018-07-25 Salt Water Injection Well No Violations I found the injection well not in operation. There is no evidence of recent activity. The facility and wellhead are secure with a locked chain link fence. An identification sign is posted. The office and pump house are locked. I observed no leaks or spills. There is overgrown vegetation around the wellhead.
2131954554 2016-07-14 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
2138943198 2016-12-07 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations at the time.
228248833 2020-8-12 0:00: SW No Violations
357311163 2013-10-28 0:00 DD No Violations
406758782 2018-1-4 0:00:0 SW No Violations 0.30
46840800 2016-5-17 0:00: SW No Violations 1.00
602398661 2013-10-17 0:00 DD No Violations 3.00
606033661 2020-3-6 0:00:0 SW No Violations 0.30
782039637 2014-11-7 0:00: SW No Violations
81868864 2018-6-26 0:00: SW No Violations 1.00
902592774 2013-11-19 0:00 DD No Violations
931510417 2016-3-17 0:00: SW No Violations
952378974 2019-7-31 0:00: SW No Violations 1.00

For data sources see[4]