X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-23196"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-099-23196
 
| Well ID: 34-099-23196
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.013639870, -80.53651140 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.01, -80.53 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 29: Line 29:
 
| Final Drill Date: 2013-11-27
 
| Final Drill Date: 2013-11-27
 
|-
 
|-
| Well Total Depth: 17509 ft
+
| Well Total Depth: 17509.00 ft
 
|-
 
|-
 
| Configuration: Horizontal
 
| Configuration: Horizontal
 
|-
 
|-
| Latitude: 41.013639870
+
| Latitude: 41.010000
 
|-
 
|-
| Longitude: -80.53651140
+
| Longitude: -80.530000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 77: Line 77:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Perforation Treatments ==
 
<!--== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 306: Line 306:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 357: Line 357:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 414: Line 414:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 431: Line 431:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1001747871
 +
| 2019-12-3 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -1091116461
 +
| 2017-1-13 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -1104067213
 +
| 2015-11-2 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -1187709409
 +
| 2016-9-30 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -1739056821
 +
| 2016-9-9 0:00:0
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -2095762228
 +
| 2013-11-19 0:00
 +
| DD
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -340863311
 +
| 2018-6-27 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -466460688
 +
| 2014-3-5 0:00:0
 +
| DD
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -523258778
 +
| 2013-9-27 0:00:
 +
| DD
 +
| No Violations
 +
| 7.00
 +
|-
 +
| -835583192
 +
| 2013-7-20 0:00:
 +
| DD
 +
| No Violations
 +
|
 +
|-
 +
| -844346230
 +
| 2017-6-8 0:00:0
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -957863312
 +
| 2014-6-9 0:00:0
 +
| PW
 +
| No Violations
 +
| 1.00
 
|-
 
|-
 
| 0031526714
 
| 0031526714
Line 563: Line 635:
 
| No Violations
 
| No Violations
 
| Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time.
 
| Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time.
 +
|-
 +
| 1446995205
 +
| 2019-7-12 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 
|-
 
|-
 
| 1468088565
 
| 1468088565
Line 605: Line 683:
 
| No Violations
 
| No Violations
 
| I performed a status check on the above location. H&P 225 is drilling at a depth of 10396 with oil base mud. There is a vacuume truck on location vacuuming rain water from inside the containment area around the drilling rig. Permits are posted. No violations were noted at this time.
 
| I performed a status check on the above location. H&P 225 is drilling at a depth of 10396 with oil base mud. There is a vacuume truck on location vacuuming rain water from inside the containment area around the drilling rig. Permits are posted. No violations were noted at this time.
 +
|-
 +
| 31526714
 +
| 2014-4-16 0:00:
 +
| DD
 +
| No Violations
 +
| 2.00
 +
|-
 +
| 44659069
 +
| 2016-1-20 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| 523152728
 +
| 2014-2-12 0:00:
 +
| DD
 +
| No Violations
 +
| 1.00
 +
|-
 +
| 700629866
 +
| 2015-8-21 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| 937951802
 +
| 2018-11-7 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| 944768553
 +
| 2015-6-17 0:00:
 +
| PL
 +
| No Violations
 +
| 1.00
 +
|-
 +
| 968304020
 +
| 2013-10-29 0:00
 +
| DD
 +
| No Violations
 +
| 1.00
 +
|-
 +
| 977952919
 +
| 2013-10-22 0:00
 +
| DD
 +
| No Violations
 +
| 3.00
 
|-
 
|-
 
|}
 
|}
Line 619: Line 745:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 15:55, 12 January 2021

Well Details

Well ID: 34-099-23196
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Poland Township
Operator Name: HILCORP ENERGY COMPANY
Well Pad ID: US-OH-000748
Farm/Lease Name: POLAND-CLL2
License Status: Producing
License Date: 2013-07-17
Spud Date: 2013-09-22
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2013-11-27
Well Total Depth: 17509.00 ft
Configuration: Horizontal
Latitude: 41.010000
Longitude: -80.530000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-17 Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:2417.17, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-11-27
Completion Report Received 2014-05-16
Construction Permit Expires 2014-07-17
Correction to Well 2015-02-13 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Record Last Modified 2017-02-15

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-02-15 H2O 8 9147 Bbl 449600 Universal Well Services Inc. STAGE 8

48 SHOTS

2014-02-21 H2O 8 8907 Bbl 4494 Universal Well Services Inc. STAGE 19

48 SHOTS

2014-02-17 H2O 8 8691 Bbl 450900 Universal Well Services Inc. STAGE 14

48 SHOTS

2014-02-21 H2O 8 8870 Bbl 4528 Universal Well Services Inc. STAGE 17

48 SHOTS

2014-02-16 H2O 8 8904 Bbl 4499 Universal Well Services Inc. STAGE 11

48 SHOTS

2014-02-16 H2O 8 9523 Bbl 451200 Universal Well Services Inc. STAGE 10

48 SHOTS

2013-02-22 H2O 8 8829 Bbl 449500 Universal Well Services Inc. STAGE 20

48 SHOTS

2014-02-15 H2O 8 9519 Bbl 4505 Universal Well Services Inc. STAGE 9

48 SHOTS

2014-02-20 H2O 8 8810 Bbl 450800 Universal Well Services Inc. STAGE 15

48 SHOTS

2014-02-13 H2O 8 9434 Bbl 456200 Universal Well Services Inc. STAGE 4

48 SHOTS

2014-02-21 H2O 8 9811 Bbl 454800 Universal Well Services Inc. STAGE 18

48 SHOTS

2014-02-14 H2O 8 9133 Bbl 451900 Universal Well Services Inc. STAGE 6

48 SHOTS

2014-02-17 H2O 8 8866 Bbl 450600 Universal Well Services Inc. STAGE 13

48 SHOTS

2014-02-13 H2O 8 9841 Bbl 453500 Universal Well Services Inc. STAGE 2

48 SHOTS

2014-02-14 H2O 8 9640 Bbl 454600 Universal Well Services Inc. STAGE 7

48 SHOTS

2014-02-14 H2O 8 9121 Bbl 451100 Universal Well Services Inc. STAGE 5

48 SHOTS

2014-02-13 H2O 8 9259 Bbl 453100 Universal Well Services Inc. STAGE 3

48 SHOTS

2014-02-20 H2O 8 8638 Bbl 445800 Universal Well Services Inc. STAGE 16

48 SHOTS

2014-02-12 H2O 8 9218 Bbl 452900 Universal Well Services Inc. STAGE 1

32 SHOTS

2014-02-16 H2O 8 8680 Bbl 455200 Universal Well Services Inc. STAGE 12

48 SHOTS

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 HILCORP ENERGY COMPANY 739315 0 206
2015 HILCORP ENERGY COMPANY 892375 0 330
2016 HILCORP ENERGY COMPANY 573315 0 362
2017 HILCORP ENERGY COMPANY 380707 0 363
2018 HILCORP ENERGY COMPANY 229901 0 364
2019 HILCORP ENERGY COMPANY 44924 0 90

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 HILCORP ENERGY COMPANY Brine 12613 206
2015 HILCORP ENERGY COMPANY Brine 5307 330
2016 HILCORP ENERGY COMPANY Brine 7983 362
2017 HILCORP ENERGY COMPANY Brine 3099 363
2018 HILCORP ENERGY COMPANY Brine 1675 364
2019 HILCORP ENERGY COMPANY Brine 414 90

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1001747871 2019-12-3 0:00: PW No Violations 1.00
-1091116461 2017-1-13 0:00: PW No Violations 1.00
-1104067213 2015-11-2 0:00: PW No Violations 1.00
-1187709409 2016-9-30 0:00: PW No Violations 1.00
-1739056821 2016-9-9 0:00:0 PW No Violations 1.00
-2095762228 2013-11-19 0:00 DD No Violations 1.00
-340863311 2018-6-27 0:00: PW No Violations 1.00
-466460688 2014-3-5 0:00:0 DD No Violations 1.00
-523258778 2013-9-27 0:00: DD No Violations 7.00
-835583192 2013-7-20 0:00: DD No Violations
-844346230 2017-6-8 0:00:0 PW No Violations 1.00
-957863312 2014-6-9 0:00:0 PW No Violations 1.00
0031526714 2014-04-16 Drill / Deepen / Reopen No Violations C.L Forbes Service Rig is on location running 2 7/8 tubing. Rig is setting on containment fire extinguishers are at various locations and safety lanes are marked. Wellheads are protected with steel cages over them. No violations were noted at this time.
0044659069 2016-01-20 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
0340863311 2018-06-27 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
0466460688 2014-03-05 Drill / Deepen / Reopen No Violations Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time.
0523152728 2014-02-12 Drill / Deepen / Reopen No Violations Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time.
0523258778 2013-09-27 Drill / Deepen / Reopen No Violations Falcone Drilling Rig 18 drilled a 12.25 well bore to a total depth of 2500 and ran 2500 of 36# J-55 casing. Baker Hughes pumped 234 barrels of water ahead followed by 35 barrels of Gel with Fed Seal and Cello flake follow by 10 barrels of fresh water spacer. They pumped 873 sacks of A+.05S+2CACL+.5%BA10 cement. Displaced with 190 barrels of fresh water. Bumped plug floats held. There was 40 barrels of cement returned to surface. Good circulation throughout job.
0700629866 2015-08-21 Production Wells No Violations I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time.
0835583192 2013-07-20 Drill / Deepen / Reopen No Violations I was on location for the cementing of the conductor pipe. The 20 casing was set at 90. Express Energy was the company on location for drilling the conductor and cementing it. Circulation was established and Class A cement with 2 % calcium and 8 oz. of flake was used. The cement scaled at approximatly 15.6 ppg. 173 sacks of cement was used at approximatly 50% excess. I witnessed cement return to surface and the casing was shut in for the cement to set.
0844346230 2017-06-08 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
0937951802 2018-11-07 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
0944768553 2015-06-17 Preliminary Restoration No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed
0957863312 2014-06-09 Production Wells No Violations On 6/9/2014. After receiving the approval to produce dated 6/6/2014. Hilcop Energy started turning the above well into production. I was on location to observe this operation. There were various Hilcorp personal on location. Turn on was completed with out incident. Equipment is set up with various safety shut downs.
0968304020 2013-10-29 Drill / Deepen / Reopen No Violations H&P Rig 225 is preparing to move to the 6-H (3409923192) location. No violations were noted at this time. Vacuum trucks are on location vacuuming all the fresh water as they clean the rig.
0977952919 2013-10-22 Drill / Deepen / Reopen No Violations Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. We meet with Bill Mitchell the Drilling Consultant for Hillcorp. At that time Blackhawk was performing the blowout preventor test and casing test. We talked with the personal that was performing the test about the various aspects of the testing
1026844961 2015-09-28 Production Wells No Violations I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time.
1087210393 2014-05-06 Production Wells No Violations I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time.
1091116461 2017-01-13 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was 150 psi on the annuals at this time.
1104067213 2015-11-02 Production Wells No Violations I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time.
1187709409 2016-09-30 Production Wells No Violations I performed a follow up inspection to check the pressure between the annuls 13-3/8 and the 9-5/8 casing there was 680 psi. I called Tom Havanek and instructed him to install a relieve valve or to plumb the annuals into the flowline (50 psi). He instructed that he would have his contractor to perform the job.
1377008220 2013-07-20 Drill / Deepen / Reopen No Violations Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time. Kevin Perry covered this job.
1380737561 2013-09-27 Drill / Deepen / Reopen No Violations Falcone Drilling Rig 18 drilled a 17.5 well bore to a total depth of 900 and ran 900 of 13-3/8 61# J-55 casing. Baker Hughes pumped 170 barrels of water ahead followed by 35 barrels of Gel with Fed Seal and Cello flake follow by 10 barrels of fresh water spacer. They pumped 766 sacks of A+.05S+2CACL+.5BA10 cement. Displaced with 132 barrels of fresh water. Bumped plug floats held. There was 50 barrels of cement returned to surface. Good circulation throughout job.
1441975737 2014-01-31 Drill / Deepen / Reopen No Violations Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time.
1446995205 2019-7-12 0:00: PW No Violations 1.00
1468088565 2014-06-11 Administrative Inspection No Violations I was on location with Geologist Mike McCormac and Geologist Teresa McQuade from the ODNR Columbus Office and also Adam Mullet a production personal from Hilcorp. Adam was explaining how the Gas Production Units ( GPU ) measured the gas and fluids before it went to the central production facility. The production facility is where the gas enters the sales point and the water and oil/condensate is collected.
1476719963 2016-10-14 Production Wells No Violations I performed a follow up inspection. Hilcorp has installed the gage and also installed 3/8 tubing on the 13-3/8 annuals into the flowline at present there is 100 psi. ID signs are posted no noted violation at this time.
1505739914 2014-04-16 Drill / Deepen / Reopen No Violations I performed a status check on the above location. At this time there is no drilling or stimulations active at this location. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in.
1684067283 2013-11-25 Drill / Deepen / Reopen No Violations I performed a status check on the above location. H&P Drilling Rig 225 drilled 8.625 to a total depth of 17509 and are now running 5.5 casing. They will call when ready to cement casing.
1739056821 2016-09-09 Production Wells No Violations Northeast Region Supervisor Tom Hill and my self met with Hilcorps Production personnel to discuss the annuals pressure 600 psi on this well. They removed the gage and bled the pressure off. There was no noticeable pressure coming out of the needle valve They installed a new gage and will monitor the pressures.
1839805134 2016-09-08 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. I noticed that the annuals had 600 psi between the 13-3/8 and the 9-5/8. I called Tom Havanek Operations Manager and told him about the pressure. He set up a meeting for 9/9/2016 at 1:00 PM with his production personnel. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There are also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
2095762228 2013-11-19 Drill / Deepen / Reopen No Violations I performed a status check on the above location. H&P 225 is drilling at a depth of 10396 with oil base mud. There is a vacuume truck on location vacuuming rain water from inside the containment area around the drilling rig. Permits are posted. No violations were noted at this time.
31526714 2014-4-16 0:00: DD No Violations 2.00
44659069 2016-1-20 0:00: PW No Violations 1.00
523152728 2014-2-12 0:00: DD No Violations 1.00
700629866 2015-8-21 0:00: PW No Violations 1.00
937951802 2018-11-7 0:00: PW No Violations 1.00
944768553 2015-6-17 0:00: PL No Violations 1.00
968304020 2013-10-29 0:00 DD No Violations 1.00
977952919 2013-10-22 0:00 DD No Violations 3.00

For data sources see[8]

References