X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-157-23825"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-157-23825
 
| Well ID: 34-157-23825
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.630678753, -81.61605436 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.63, -81.61 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 11: Line 11:
 
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]]
 
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]]
 
|-
 
|-
| Municipality: [[Wayne Township,_Tuscarawas_County,_Ohio|Wayne Township]]
+
| Municipality: [[Wayne_Township,_Tuscarawas_County,_Ohio|Wayne Township]]
 
|-
 
|-
 
| Operator Name: [[SOUND ENERGY CO INC]]
 
| Operator Name: [[SOUND ENERGY CO INC]]
Line 29: Line 29:
 
| Final Drill Date: 1983-10-11
 
| Final Drill Date: 1983-10-11
 
|-
 
|-
| Well Total Depth: 4506 ft
+
| Well Total Depth: 4506.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 40.630678753
+
| Latitude: 40.630000
 
|-
 
|-
| Longitude: -81.61605436
+
| Longitude: -81.610000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 97: Line 97:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 108: Line 108:
 
|-
 
|-
 
| 2006-09-11
 
| 2006-09-11
 +
| style="text-align: right;" | 4401
 +
| style="text-align: right;" | 4489
 +
| style="text-align: right;" | 33
 +
|-
 +
|
 +
| style="text-align: right;" | 4401
 +
| style="text-align: right;" | 4489
 +
| style="text-align: right;" | 33
 +
|-
 +
|
 
| style="text-align: right;" | 4401
 
| style="text-align: right;" | 4401
 
| style="text-align: right;" | 4489
 
| style="text-align: right;" | 4489
Line 116: Line 126:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 165: Line 175:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 178: Line 188:
 
| 1984
 
| 1984
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 11785
+
| style="text-align: right;" | 11785.00
| style="text-align: right;" | 1549
+
| style="text-align: right;" | 1549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985
 
| 1985
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 5449
+
| style="text-align: right;" | 5449.00
| style="text-align: right;" | 320
+
| style="text-align: right;" | 320.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1986
 
| 1986
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 2786
+
| style="text-align: right;" | 2786.00
| style="text-align: right;" | 117
+
| style="text-align: right;" | 117.00
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 305
 
|-
 
|-
 
| 1987
 
| 1987
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 2115
+
| style="text-align: right;" | 2115.00
| style="text-align: right;" | 124
+
| style="text-align: right;" | 124.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1488
+
| style="text-align: right;" | 1488.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1989
 
| 1989
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1241
+
| style="text-align: right;" | 1241.00
| style="text-align: right;" | 100
+
| style="text-align: right;" | 100.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1990
 
| 1990
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1136
+
| style="text-align: right;" | 1136.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1539
+
| style="text-align: right;" | 1539.00
| style="text-align: right;" | 277
+
| style="text-align: right;" | 277.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 2046
+
| style="text-align: right;" | 2046.00
| style="text-align: right;" | 211
+
| style="text-align: right;" | 211.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1997
+
| style="text-align: right;" | 1997.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1256
+
| style="text-align: right;" | 1256.00
| style="text-align: right;" | 162
+
| style="text-align: right;" | 162.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 708
+
| style="text-align: right;" | 708.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1019
+
| style="text-align: right;" | 1019.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 960
+
| style="text-align: right;" | 960.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 902
+
| style="text-align: right;" | 902.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 701
+
| style="text-align: right;" | 701.00
| style="text-align: right;" | 107
+
| style="text-align: right;" | 107.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 847
+
| style="text-align: right;" | 847.00
| style="text-align: right;" | 42
+
| style="text-align: right;" | 42.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 803
+
| style="text-align: right;" | 803.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 983
+
| style="text-align: right;" | 983.00
| style="text-align: right;" | 109
+
| style="text-align: right;" | 109.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1227
+
| style="text-align: right;" | 1227.00
| style="text-align: right;" | 65
+
| style="text-align: right;" | 65.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 862
+
| style="text-align: right;" | 862.00
| style="text-align: right;" | 62
+
| style="text-align: right;" | 62.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 889
+
| style="text-align: right;" | 889.00
| style="text-align: right;" | 74
+
| style="text-align: right;" | 74.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 980
+
| style="text-align: right;" | 980.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 921
+
| style="text-align: right;" | 921.00
| style="text-align: right;" | 99
+
| style="text-align: right;" | 99.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1084
+
| style="text-align: right;" | 1084.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 979
+
| style="text-align: right;" | 979.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 790
+
| style="text-align: right;" | 790.00
| style="text-align: right;" | 116
+
| style="text-align: right;" | 116.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 876
+
| style="text-align: right;" | 876.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 454
+
| style="text-align: right;" | 454.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 852
+
| style="text-align: right;" | 852.00
| style="text-align: right;" | 74
+
| style="text-align: right;" | 74.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 1061
+
| style="text-align: right;" | 1061.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 726
+
| style="text-align: right;" | 726.00
| style="text-align: right;" | 40
+
| style="text-align: right;" | 40.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 780
+
| style="text-align: right;" | 780.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[JAMES R SMAIL INC]]
 
| [[JAMES R SMAIL INC]]
| style="text-align: right;" | 388
+
| style="text-align: right;" | 388.00
| style="text-align: right;" | 37
+
| style="text-align: right;" | 37.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[SOUND ENERGY CO INC]]
 
| [[SOUND ENERGY CO INC]]
| style="text-align: right;" | 651
+
| style="text-align: right;" | 651.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 390: Line 400:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 621: Line 631:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 638: Line 648:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1705299887
 +
| 2018-11-15 0:00
 +
| PW
 +
| No Violations
 +
| 0.90
 +
|-
 +
| -1889060297
 +
| 2004-10-25 0:00
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
| 0000PL3018
 
| 0000PL3018
Line 668: Line 690:
 
| No Violations
 
| No Violations
 
| This is a producing plunger lift well.  There were no problems noted at the time of the inspection.
 
| This is a producing plunger lift well.  There were no problems noted at the time of the inspection.
 +
|-
 +
| PL3018
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 682: Line 710:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 16:20, 12 January 2021

Well Details

Well ID: 34-157-23825
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Wayne Township
Operator Name: SOUND ENERGY CO INC
Well Pad ID:
Farm/Lease Name: TWILIGHT MINING CO
License Status: Producing
License Date: 1983-08-30
Spud Date: 1983-10-08
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1983-10-11
Well Total Depth: 4506.00 ft
Configuration: Vertical
Latitude: 40.630000
Longitude: -81.610000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1983-03-02 Issued Date 3/2/83 Expired Date 8/29/83 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
CO 1983-08-30 169 SMAIL JAMES R GeoDate 8/30/83
Oil and Gas 1983-08-30 Issued Date 8/30/83 Expired Date 2/26/84 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04506 Proposed Drill Depth 04506
Original Spud 1983-10-08 R.I. 9-3-83
Completed 1983-10-11 R.I. 9-3-83
Reached Total Depth 1983-10-11 R.I. 9-3-83
CO 1983-11-17 169 SMAIL JAMES R GeoDate 3/2/83
Completion Report Received 1983-11-23 R.I. 9-3-83
Construction Permit Expires 1984-02-26 R.I. 9-3-83
Change of Owner 2017-04-13 Operator changed from 169, JAMES R SMAIL INC to 4327, SOUND ENERGY CO INC
Record Last Modified 2017-04-13 R.I. 9-3-83

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4401 4489 33
4401 4489 33
4401 4489 33

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 79000 Gal 35000 FRAC;79MG H2O,35M# SD

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 JAMES R SMAIL INC 11785.00 1549.00 0
1985 JAMES R SMAIL INC 5449.00 320.00 365
1986 JAMES R SMAIL INC 2786.00 117.00 305
1987 JAMES R SMAIL INC 2115.00 124.00 365
1988 JAMES R SMAIL INC 1488.00 0.00 365
1989 JAMES R SMAIL INC 1241.00 100.00 365
1990 JAMES R SMAIL INC 1136.00 0.00 365
1991 JAMES R SMAIL INC 1539.00 277.00 365
1992 JAMES R SMAIL INC 2046.00 211.00 365
1993 JAMES R SMAIL INC 1997.00 0.00 365
1994 JAMES R SMAIL INC 1256.00 162.00 365
1995 JAMES R SMAIL INC 708.00 0.00 365
1996 JAMES R SMAIL INC 1019.00 0.00 365
1997 JAMES R SMAIL INC 960.00 0.00 365
1998 JAMES R SMAIL INC 902.00 0.00 365
1999 JAMES R SMAIL INC 701.00 107.00 365
2000 JAMES R SMAIL INC 847.00 42.00 365
2001 JAMES R SMAIL INC 803.00 0.00 365
2002 JAMES R SMAIL INC 983.00 109.00 365
2003 JAMES R SMAIL INC 1227.00 65.00 365
2004 JAMES R SMAIL INC 862.00 62.00 365
2005 JAMES R SMAIL INC 889.00 74.00 365
2006 JAMES R SMAIL INC 980.00 0.00 365
2007 JAMES R SMAIL INC 921.00 99.00 365
2008 JAMES R SMAIL INC 1084.00 0.00 365
2009 JAMES R SMAIL INC 979.00 0.00 365
2010 JAMES R SMAIL INC 790.00 116.00 365
2011 JAMES R SMAIL INC 876.00 0.00 365
2012 JAMES R SMAIL INC 454.00 0.00 366
2013 JAMES R SMAIL INC 852.00 74.00 365
2014 JAMES R SMAIL INC 1061.00 0.00 365
2015 JAMES R SMAIL INC 726.00 40.00 365
2016 JAMES R SMAIL INC 780.00 0.00 365
2017 JAMES R SMAIL INC 388.00 37.00 365
2018 SOUND ENERGY CO INC 651.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 JAMES R SMAIL INC Brine 0 0
1985 JAMES R SMAIL INC Brine 0 365
1986 JAMES R SMAIL INC Brine 90 305
1987 JAMES R SMAIL INC Brine 0 365
1988 JAMES R SMAIL INC Brine 0 365
1989 JAMES R SMAIL INC Brine 0 365
1990 JAMES R SMAIL INC Brine 0 365
1991 JAMES R SMAIL INC Brine 20 365
1992 JAMES R SMAIL INC Brine 65 365
1993 JAMES R SMAIL INC Brine 20 365
1994 JAMES R SMAIL INC Brine 20 365
1995 JAMES R SMAIL INC Brine 0 365
1996 JAMES R SMAIL INC Brine 0 365
1997 JAMES R SMAIL INC Brine 0 365
1998 JAMES R SMAIL INC Brine 13 365
1999 JAMES R SMAIL INC Brine 365
2000 JAMES R SMAIL INC Brine 365
2001 JAMES R SMAIL INC Brine 365
2002 JAMES R SMAIL INC Brine 25 365
2003 JAMES R SMAIL INC Brine 20 365
2004 JAMES R SMAIL INC Brine 0 365
2005 JAMES R SMAIL INC Brine 0 365
2006 JAMES R SMAIL INC Brine 20 365
2007 JAMES R SMAIL INC Brine 20 365
2008 JAMES R SMAIL INC Brine 0 365
2009 JAMES R SMAIL INC Brine 0 365
2010 JAMES R SMAIL INC Brine 40 365
2011 JAMES R SMAIL INC Brine 0 365
2012 JAMES R SMAIL INC Brine 0 366
2013 JAMES R SMAIL INC Brine 23 365
2014 JAMES R SMAIL INC Brine 0 365
2015 JAMES R SMAIL INC Brine 35 365
2016 JAMES R SMAIL INC Brine 0 365
2017 SOUND ENERGY CO INC Brine 0 306
2018 SOUND ENERGY CO INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1705299887 2018-11-15 0:00 PW No Violations 0.90
-1889060297 2004-10-25 0:00 PL No Violations
0000PL3018 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1705299887 2018-11-15 Production Wells No Violations Upon arrival on location, I witnessed the well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and on the casing were open. Production equipment included a steel 210 barrel tank, a concrete vault, a vertical separator, and a chart recorder with a 2 by .500 inch orifice plate within an earthen dike. The production report was up to date and proper identification was present.
1725562921 2004-10-25 Production Wells No Violations no violations
1889060297 2004-10-25 Preliminary Restoration No Violations restoration ok
2105313477 2014-07-14 Production Wells No Violations This is a producing plunger lift well. There were no problems noted at the time of the inspection.
PL3018 PL No Violations

For data sources see[9]

References