X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-157-24268"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-157-24268
 
| Well ID: 34-157-24268
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.534288526, -81.30936564 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.53, -81.3 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 11: Line 11:
 
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]]
 
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]]
 
|-
 
|-
| Municipality: [[Warren Township,_Tuscarawas_County,_Ohio|Warren Township]]
+
| Municipality: [[Warren_Township,_Tuscarawas_County,_Ohio|Warren Township]]
 
|-
 
|-
 
| Operator Name: [[PETROX, INC]]
 
| Operator Name: [[PETROX, INC]]
Line 29: Line 29:
 
| Final Drill Date: 1985-08-22
 
| Final Drill Date: 1985-08-22
 
|-
 
|-
| Well Total Depth: 5209 ft
+
| Well Total Depth: 5209.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 40.534288526
+
| Latitude: 40.530000
 
|-
 
|-
| Longitude: -81.30936564
+
| Longitude: -81.300000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 93: Line 93:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 104: Line 104:
 
|-
 
|-
 
| 1997-06-29
 
| 1997-06-29
 +
| style="text-align: right;" | 4964
 +
| style="text-align: right;" | 5073
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 
| style="text-align: right;" | 4964
 
| style="text-align: right;" | 4964
 
| style="text-align: right;" | 5073
 
| style="text-align: right;" | 5073
Line 112: Line 117:
 
| style="text-align: right;" | 5036
 
| style="text-align: right;" | 5036
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 30
 +
|-
 +
|
 +
| style="text-align: right;" | 4994
 +
| style="text-align: right;" | 5036
 +
| style="text-align: right;" | 30
 +
|-
 +
|
 +
| style="text-align: right;" | 4964
 +
| style="text-align: right;" | 5073
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 117: Line 132:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 166: Line 181:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 179: Line 194:
 
| 1985
 
| 1985
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 317
+
| style="text-align: right;" | 317.00
 
| style="text-align: right;" | 97
 
| style="text-align: right;" | 97
 
|-
 
|-
 
| 1986
 
| 1986
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 5243
+
| style="text-align: right;" | 5243.00
| style="text-align: right;" | 2315
+
| style="text-align: right;" | 2315.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1987
 
| 1987
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 5740
+
| style="text-align: right;" | 5740.00
| style="text-align: right;" | 1140
+
| style="text-align: right;" | 1140.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 4192
+
| style="text-align: right;" | 4192.00
| style="text-align: right;" | 920
+
| style="text-align: right;" | 920.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1989
 
| 1989
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 4038
+
| style="text-align: right;" | 4038.00
| style="text-align: right;" | 777
+
| style="text-align: right;" | 777.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1990
 
| 1990
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 2132
+
| style="text-align: right;" | 2132.00
| style="text-align: right;" | 622
+
| style="text-align: right;" | 622.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 1921
+
| style="text-align: right;" | 1921.00
| style="text-align: right;" | 481
+
| style="text-align: right;" | 481.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 1577
+
| style="text-align: right;" | 1577.00
| style="text-align: right;" | 484
+
| style="text-align: right;" | 484.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 3846
+
| style="text-align: right;" | 3846.00
| style="text-align: right;" | 668
+
| style="text-align: right;" | 668.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[QUAKER STATE OIL REF CORP]]
 
| [[QUAKER STATE OIL REF CORP]]
| style="text-align: right;" | 2487
+
| style="text-align: right;" | 2487.00
| style="text-align: right;" | 380
+
| style="text-align: right;" | 380.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[BELDEN & BLAKE CORPORATION]]
 
| [[BELDEN & BLAKE CORPORATION]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 196
+
| style="text-align: right;" | 196.00
 
| style="text-align: right;" | 137
 
| style="text-align: right;" | 137
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[BELDEN & BLAKE CORPORATION]]
 
| [[BELDEN & BLAKE CORPORATION]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 401
+
| style="text-align: right;" | 401.00
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[BELDEN & BLAKE CORPORATION]]
 
| [[BELDEN & BLAKE CORPORATION]]
| style="text-align: right;" | 2100
+
| style="text-align: right;" | 2100.00
| style="text-align: right;" | 339
+
| style="text-align: right;" | 339.00
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[BELDEN & BLAKE CORPORATION]]
 
| [[BELDEN & BLAKE CORPORATION]]
| style="text-align: right;" | 2266
+
| style="text-align: right;" | 2266.00
| style="text-align: right;" | 352
+
| style="text-align: right;" | 352.00
 
| style="text-align: right;" | 189
 
| style="text-align: right;" | 189
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[BELDEN & BLAKE CORPORATION]]
 
| [[BELDEN & BLAKE CORPORATION]]
| style="text-align: right;" | 2256
+
| style="text-align: right;" | 2256.00
| style="text-align: right;" | 213
+
| style="text-align: right;" | 213.00
 
| style="text-align: right;" | 142
 
| style="text-align: right;" | 142
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[BELDEN & BLAKE CORPORATION]]
 
| [[BELDEN & BLAKE CORPORATION]]
| style="text-align: right;" | 2308
+
| style="text-align: right;" | 2308.00
| style="text-align: right;" | 294
+
| style="text-align: right;" | 294.00
 
| style="text-align: right;" | 331
 
| style="text-align: right;" | 331
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[BELDEN & BLAKE CORPORATION]]
 
| [[BELDEN & BLAKE CORPORATION]]
| style="text-align: right;" | 1974
+
| style="text-align: right;" | 1974.00
| style="text-align: right;" | 250
+
| style="text-align: right;" | 250.00
 
| style="text-align: right;" | 342
 
| style="text-align: right;" | 342
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[BELDEN & BLAKE CORPORATION]]
 
| [[BELDEN & BLAKE CORPORATION]]
| style="text-align: right;" | 1183
+
| style="text-align: right;" | 1183.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 212
 
| style="text-align: right;" | 212
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1710
+
| style="text-align: right;" | 1710.00
| style="text-align: right;" | 284
+
| style="text-align: right;" | 284.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1543
+
| style="text-align: right;" | 1543.00
| style="text-align: right;" | 221
+
| style="text-align: right;" | 221.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1613
+
| style="text-align: right;" | 1613.00
| style="text-align: right;" | 203
+
| style="text-align: right;" | 203.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1528
+
| style="text-align: right;" | 1528.00
| style="text-align: right;" | 192
+
| style="text-align: right;" | 192.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1502
+
| style="text-align: right;" | 1502.00
| style="text-align: right;" | 162
+
| style="text-align: right;" | 162.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1265
+
| style="text-align: right;" | 1265.00
| style="text-align: right;" | 115
+
| style="text-align: right;" | 115.00
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 1
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 982
+
| style="text-align: right;" | 982.00
| style="text-align: right;" | 152
+
| style="text-align: right;" | 152.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 967
+
| style="text-align: right;" | 967.00
| style="text-align: right;" | 238
+
| style="text-align: right;" | 238.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1300
+
| style="text-align: right;" | 1300.00
| style="text-align: right;" | 75
+
| style="text-align: right;" | 75.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1172
+
| style="text-align: right;" | 1172.00
| style="text-align: right;" | 144
+
| style="text-align: right;" | 144.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1140
+
| style="text-align: right;" | 1140.00
| style="text-align: right;" | 150
+
| style="text-align: right;" | 150.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1014
+
| style="text-align: right;" | 1014.00
| style="text-align: right;" | 143
+
| style="text-align: right;" | 143.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1051
+
| style="text-align: right;" | 1051.00
| style="text-align: right;" | 150
+
| style="text-align: right;" | 150.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1063
+
| style="text-align: right;" | 1063.00
| style="text-align: right;" | 80
+
| style="text-align: right;" | 80.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 1002
+
| style="text-align: right;" | 1002.00
| style="text-align: right;" | 141
+
| style="text-align: right;" | 141.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[PETROX, INC]]
 
| [[PETROX, INC]]
| style="text-align: right;" | 757
+
| style="text-align: right;" | 757.00
| style="text-align: right;" | 143
+
| style="text-align: right;" | 143.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 385: Line 400:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 610: Line 625:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 639: Line 654:
 
| No Violations
 
| No Violations
 
| Upon my arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 2.375 inch tubing, rods, and a pumping unit ran with an electric motor. The valves were open on the wellhead. The production equipment included a steel 100 barrel tank, a vertical separator, and a concrete vault within an earthen dike. The production report was up to date and proper identification was present.
 
| Upon my arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 2.375 inch tubing, rods, and a pumping unit ran with an electric motor. The valves were open on the wellhead. The production equipment included a steel 100 barrel tank, a vertical separator, and a concrete vault within an earthen dike. The production report was up to date and proper identification was present.
 +
|-
 +
| PL2673
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 653: Line 674:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 16:46, 12 January 2021

Well Details

Well ID: 34-157-24268
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Warren Township
Operator Name: PETROX, INC
Well Pad ID:
Farm/Lease Name: MIZER G & B
License Status: Producing
License Date: 1985-05-31
Spud Date: 1985-08-16
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1985-08-22
Well Total Depth: 5209.00 ft
Configuration: Vertical
Latitude: 40.530000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1985-05-31 133 QUAKER STATE OIL REF CORP GeoDate 5/31/85
Oil and Gas 1985-05-31 Issued Date 5/31/85 Expired Date 5/31/86 Acres 0181370 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05209 Proposed Drill Depth 05209
Original Spud 1985-08-16 LOG TYPE=CLINTON QUICKLOOK
Completed 1985-08-22 LOG TYPE=CLINTON QUICKLOOK
Reached Total Depth 1985-08-22 LOG TYPE=CLINTON QUICKLOOK
Completion Report Received 1985-11-05 LOG TYPE=CLINTON QUICKLOOK
Construction Permit Expires 1986-05-31 LOG TYPE=CLINTON QUICKLOOK
CO 1995-10-18 182 BELDEN & BLAKE CO GeoDate 5/31/85
Change of Owner 2002-08-12 Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC
Record Last Modified 2017-02-15 LOG TYPE=CLINTON QUICKLOOK

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4964 5073 0
4964 5073 0
2006-09-11 4994 5036 30
4994 5036 30
4964 5073 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 4262 Bbl 60000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 QUAKER STATE OIL REF CORP 0.00 317.00 97
1986 QUAKER STATE OIL REF CORP 5243.00 2315.00 365
1987 QUAKER STATE OIL REF CORP 5740.00 1140.00 365
1988 QUAKER STATE OIL REF CORP 4192.00 920.00 365
1989 QUAKER STATE OIL REF CORP 4038.00 777.00 365
1990 QUAKER STATE OIL REF CORP 2132.00 622.00 365
1991 QUAKER STATE OIL REF CORP 1921.00 481.00 365
1992 QUAKER STATE OIL REF CORP 1577.00 484.00 365
1993 QUAKER STATE OIL REF CORP 3846.00 668.00 365
1994 QUAKER STATE OIL REF CORP 2487.00 380.00 365
1995 BELDEN & BLAKE CORPORATION 0.00 196.00 137
1996 BELDEN & BLAKE CORPORATION 0.00 401.00 359
1997 BELDEN & BLAKE CORPORATION 2100.00 339.00 330
1998 BELDEN & BLAKE CORPORATION 2266.00 352.00 189
1999 BELDEN & BLAKE CORPORATION 2256.00 213.00 142
2000 BELDEN & BLAKE CORPORATION 2308.00 294.00 331
2001 BELDEN & BLAKE CORPORATION 1974.00 250.00 342
2002 BELDEN & BLAKE CORPORATION 1183.00 0.00 212
2003 PETROX, INC 1710.00 284.00 365
2004 PETROX, INC 1543.00 221.00 365
2005 PETROX, INC 1613.00 203.00 365
2006 PETROX, INC 1528.00 192.00 365
2007 PETROX, INC 1502.00 162.00 365
2008 PETROX, INC 1265.00 115.00 1
2009 PETROX, INC 982.00 152.00 365
2010 PETROX, INC 967.00 238.00 365
2011 PETROX, INC 1300.00 75.00 365
2012 PETROX, INC 1172.00 144.00 366
2013 PETROX, INC 1140.00 150.00 365
2014 PETROX, INC 1014.00 143.00 365
2015 PETROX, INC 1051.00 150.00 365
2016 PETROX, INC 1063.00 80.00 365
2017 PETROX, INC 1002.00 141.00 365
2018 PETROX, INC 757.00 143.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 QUAKER STATE OIL REF CORP Brine 360 97
1986 QUAKER STATE OIL REF CORP Brine 1420 365
1987 QUAKER STATE OIL REF CORP Brine 480 365
1988 QUAKER STATE OIL REF CORP Brine 275 365
1989 QUAKER STATE OIL REF CORP Brine 210 365
1990 QUAKER STATE OIL REF CORP Brine 120 365
1991 QUAKER STATE OIL REF CORP Brine 122 365
1992 QUAKER STATE OIL REF CORP Brine 200 365
1993 QUAKER STATE OIL REF CORP Brine 210 365
1994 QUAKER STATE OIL REF CORP Brine 150 365
1995 BELDEN & BLAKE CORPORATION Brine 32 137
1996 BELDEN & BLAKE CORPORATION Brine 282 359
1997 BELDEN & BLAKE CORPORATION Brine 79 330
1998 BELDEN & BLAKE CORPORATION Brine 37 189
1999 BELDEN & BLAKE CORPORATION Brine 97 142
2000 BELDEN & BLAKE CORPORATION Brine 72 331
2001 BELDEN & BLAKE CORPORATION Brine 50 342
2002 BELDEN & BLAKE CORPORATION Brine 0 212
2003 PETROX, INC Brine 125 365
2004 PETROX, INC Brine 110 365
2005 PETROX, INC Brine 71 365
2006 PETROX, INC Brine 80 365
2007 PETROX, INC Brine 365
2008 PETROX, INC Brine 110 1
2009 PETROX, INC Brine 105 365
2010 PETROX, INC Brine 60 365
2011 PETROX, INC Brine 50 365
2012 PETROX, INC Brine 50 366
2013 PETROX, INC Brine 37 365
2014 PETROX, INC Brine 35 365
2015 PETROX, INC Brine 85 365
2016 PETROX, INC Brine 55 365
2017 PETROX, INC Brine 55 365
2018 PETROX, INC Brine 80 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL2673 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1414842098 2018-09-19 Production Wells No Violations Upon my arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 2.375 inch tubing, rods, and a pumping unit ran with an electric motor. The valves were open on the wellhead. The production equipment included a steel 100 barrel tank, a vertical separator, and a concrete vault within an earthen dike. The production report was up to date and proper identification was present.
PL2673 PL No Violations

For data sources see[9]

References