== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-013-20654
 
| Well ID: 34-013-20654
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.9761068, -80.83799876 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.97, -80.83 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Belmont County, Ohio|Belmont]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Belmont_County,_Ohio|Belmont]]
 +
|-
 +
| Municipality: [[Mead_Township,_Belmont_County,_Ohio|Mead Township]]
 
|-
 
|-
 
| Operator Name: [[XTO ENERGY INC.]]
 
| Operator Name: [[XTO ENERGY INC.]]
 
|-
 
|-
| Well Pad ID:  
+
| Well Pad ID: [[US-OH-000549]]
 +
|-
 +
| Farm/Lease Name: KALDOR
 
|-
 
|-
| Farm/Lease Name:  
+
| License Status: Plugged Back
 
|-
 
|-
| First Permit Date:  
+
| License Date: 2012-04-09
 
|-
 
|-
| Last Permit Date:  
+
| Spud Date: 2012-06-08
 
|-
 
|-
| Spud Date: 2012-10-12
+
| Spud Drilling Contractor: [[WACO DRILLING]]
 
|-
 
|-
| Unconventional: No
+
| Final Drill Date: 2012-10-09
 +
|-
 +
| Well Total Depth: 10400.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 39.970000
 
|-
 
|-
| Violations: 0
+
| Longitude: -80.830000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
| Latitude: 39.9761068
+
| APP
 +
| 2012-01-11
 +
| Proposed Formations:UTICA SHALE, Issued Date:1/11/2012, Expired Date:1/10/2014 12:00:00 PM, Drilling unit acres:460.99, Proposed Well Type:OG, Proposed Well Class:EDPW
 
|-
 
|-
| Longitude: -80.83799876
+
| APP
 +
| 2012-04-09
 +
| Proposed Formations:TRENTON, Issued Date:4/9/2012, Expired Date:4/9/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
 
|-
 
|-
|}
+
| Reached Total Depth
== Production Data ==
+
| 2012-10-09
{| class="wikitable sortable" width="95%"
+
|  
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2013-12
+
| Completion Report Received
| style="text-align:right;" | 277081.0
+
| 2013-01-08
 
|  
 
|  
 +
|-
 +
| End of Confidential Data
 +
| 2013-10-09
 
|  
 
|  
 +
|-
 +
| Construction Permit Expires
 +
| 2014-04-09
 
|  
 
|  
| style="text-align:right;" | 0.0
+
|-
 +
| Record Last Modified
 +
| 2018-04-19
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| 2013-3
+
|}-->
| style="text-align:right;" | 0.0
+
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 02/11/2013
 +
| 02/11/2013
 +
| style="text-align: right;" | 10283.0
 +
| style="text-align: right;" | 9459156.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="17"| 1
 +
| rowspan="1"| Scale Inhibitor - MC-MX-588-2
 +
| rowspan="1"| Multi-Chem
 +
| rowspan="1"| Scale Inhibitor
 +
| Whole Product
 
|  
 
|  
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="10"|
 +
| rowspan="10"|
 +
| rowspan="10"|
 +
| Other -(non hazardous)
 
|  
 
|  
 +
| style="text-align: right;" | 70.0
 +
| style="text-align: right;" | 0.0389389
 +
| style="text-align: right;" |
 +
|-
 +
| Hydrotreated light distillates (10-30)
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | 0.0166881
 +
| style="text-align: right;" |
 +
|-
 +
| Hydrochloric Acid (15-40) blended down to 7.5
 +
| 7647-01-0
 +
| style="text-align: right;" | 15.0
 +
| style="text-align: right;" | 0.147648
 +
| style="text-align: right;" |
 +
|-
 +
| 4,4 -Dimethyloxazolidine
 +
| 51200-87-4
 +
| style="text-align: right;" | 95.0
 +
| style="text-align: right;" | 0.0091383
 +
| style="text-align: right;" |
 +
|-
 +
| Other -(non hazardous)
 
|  
 
|  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 40.0
 +
| style="text-align: right;" | 0.0019274
 +
| style="text-align: right;" |
 +
|-
 +
| 3,4,4-Trimethyloxazolidine
 +
| 75673-43-7
 +
| style="text-align: right;" | 4.5
 +
| style="text-align: right;" | 0.0004329
 +
| style="text-align: right;" |
 +
|-
 +
| Other -(non hazardous)
 
|  
 
|  
 +
| style="text-align: right;" | 100.0
 +
| style="text-align: right;" | 0.0083895
 +
| style="text-align: right;" |
 +
|-
 +
| Glutaraldehyde
 +
| 111-30-8
 +
| style="text-align: right;" | 60.0
 +
| style="text-align: right;" | 0.0028911
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| 2-Amino-2-Methyl-1-Propanol
 +
| 124-68-5
 +
| style="text-align: right;" | 0.5
 +
| style="text-align: right;" | 0.00004810
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-6
+
| Other -(non hazardous)
| style="text-align:right;" | 0.0
 
 
|  
 
|  
 +
| style="text-align: right;" | 85.0
 +
| style="text-align: right;" | 0.8366718
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Friction Reducer - MC MX-14-5
 +
| rowspan="1"| Multi-Chem
 +
| rowspan="1"| Friction Reducer
 +
| Whole Product
 
|  
 
|  
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Biocide - MC 8520
 +
| rowspan="1"| Multi-Chem
 +
| rowspan="1"| Biocide
 +
| Whole Product
 
|  
 
|  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | None
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Acid - 15 HCl Acid
 +
| rowspan="1"| Universal
 +
| rowspan="1"| Acid
 +
| Whole Product
 
|  
 
|  
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Biocide - MC 8650
 +
| rowspan="1"| Multi-Chem
 +
| rowspan="1"| Biocide
 +
| Whole Product
 +
|
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-9
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="1"| Water
|  
+
| rowspan="1"|
|
+
| rowspan="1"|
|  
+
| water
| style="text-align:right;" | 0.0
+
| 7732-18-5
|  
+
| style="text-align: right;" | 100.0
 +
| style="text-align: right;" | 88.8014737
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 +
| sand
 +
| 14808-60-7
 +
| style="text-align: right;" | 100.0
 +
| style="text-align: right;" | 10.1357522
 +
| style="text-align: right;" |
 
|-
 
|-
| 2014-1
+
|}
| style="text-align:right;" | 943977.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 89.0
+
| title = FracFocus Fracking Chemicals Database
|  
+
| date = 2019-04-02
|  
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2019-06-19 }}</ref>
| style="text-align:right;" | 89.0
+
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| 2014-2
+
|}-->
| style="text-align:right;" | 627286.0
+
== Waste Data ==
| style="text-align:right;" | 91.0
+
{| class="wikitable sortable"
|  
+
!scope="col" style="text-align: center"| Period
|
+
!scope="col" style="text-align: center"| Operator Name
| style="text-align:right;" | 0.0
+
!scope="col" style="text-align: center"| Waste Type
| style="text-align:right;" | 91.0
+
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC.]]
 +
| Brine
 +
| style="text-align: right;" | 32258
 +
| style="text-align: right;" | 336
 
|-
 
|-
| 2014-3
+
| 2015
| style="text-align:right;" | 388012.0
+
| [[XTO ENERGY INC.]]
| style="text-align:right;" | 91.0
+
| Brine
|
+
| style="text-align: right;" | 7767
|  
+
| style="text-align: right;" | 325
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 91.0
 
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC.]]
 +
| Brine
 +
| style="text-align: right;" | 4399
 +
| style="text-align: right;" | 255
 
|-
 
|-
| 2014-4
+
| 2017
| style="text-align:right;" | 223368.0
+
| [[XTO ENERGY INC.]]
| style="text-align:right;" | 65.0
+
| Brine
|
+
| style="text-align: right;" | 19086
|  
+
| style="text-align: right;" | 340
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 65.0
 
 
|-
 
|-
 +
| 2018
 +
| [[XTO ENERGY INC.]]
 +
| Brine
 +
| style="text-align: right;" | 3820
 +
| style="text-align: right;" | 338
 
|-
 
|-
| 2015-1
+
| 2019
| style="text-align:right;" | 231435.0
+
| [[XTO ENERGY INC.]]
| style="text-align:right;" | 77.0
+
| Brine
|
+
| style="text-align: right;" | 3879
|  
+
| style="text-align: right;" | 81
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 77.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Production Table - Brine Data
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date =  2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2020-11-16
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| -1303550371
 +
| 2012-12-17 0:00
 +
| CT
 +
| No Violations
 +
| 0.50
 +
|-
 +
| -1333222979
 +
| 2013-1-15 0:00:
 +
| CT
 +
| No Violations
 +
| 1.50
 
|-
 
|-
| 109806723
+
| -1416092894
| 2012-11-01
+
| 2012-10-19 0:00
 +
| DD
 +
| No Violations
 +
| 0.50
 +
|-
 +
| -1467154304
 +
| 2018-7-16 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -1481130018
 +
| 2012-10-25 0:00
 +
| DD
 +
| No Violations
 
|  
 
|  
| On the day of my inspection the rig was drilling in the lateral section at 13429ft. No violations were noted.
+
|-
 +
| -1503596207
 +
| 2013-2-20 0:00:
 +
| CT
 +
| No Violations
 +
| 2.00
 +
|-
 +
| -273165630
 +
| 2012-10-5 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -430586749
 +
| 2013-5-16 0:00:
 +
| PL
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -488702628
 +
| 2014-2-27 0:00:
 +
| PW
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 +
| -887517782
 +
| 2013-2-14 0:00:
 +
| CT
 +
| No Violations
 +
| 3.00
 +
|-
 +
| 0109806723
 +
| 2012-11-01
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| On the day of my inspection the rig was drilling in the lateral section at 13429ft. No violations were noted.
 
|-
 
|-
| -1303550371
+
| 0273165630
 +
| 2012-10-05
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Inspection revealed that they were at core point@10,120 rig was circulating well preparing to come out of hole to core potential producing formation.
 +
|-
 +
| 0375593663
 +
| 2012-11-07
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| On the day of my inspection rig was drilling the lateral section at 16,075 ft. TD will be 16,090ft. No violations noted.
 +
|-
 +
| 0430586749
 +
| 2013-05-16
 +
| Preliminary Restoration
 +
| No Violations
 +
| On site with local inspector Andrew Corder to look over restoration work preformed at site and I told inspector Corder that once vegetation is fully established restoration work would be satisfactory.
 +
|-
 +
| 0475297944
 +
| 2013-01-24
 +
| Completion Testing
 +
| No Violations
 +
| On the day of my inspection the shoe had been drilled out and perforations were made. Rig moving to 20653. No violations noted.
 +
|-
 +
| 0488702628
 +
| 2014-02-27
 +
| Production Wells
 +
| No Violations
 +
| On the day of my inspection the well had all equipment to be capable of production. No violations noted.
 +
|-
 +
| 0817079473
 +
| 2014-10-23
 +
| Preliminary Restoration
 +
| No Violations
 +
| This site has proper erosion and sediment controls preliminary restoration on this site is complete.
 +
|-
 +
| 0887517782
 +
| 2013-02-14
 +
| Completion Testing
 +
| No Violations
 +
| On the day of my inspection I was accompanied by Inspector Dave Ball.  Universal Well Services was on site to stimulate the well.  They had to wait on sand truck for a while. No violations noted.
 +
|-
 +
| 109806723
 +
| 2012-11-1 0:00:
 +
| DD
 +
| No Violations
 +
| 1.00
 +
|-
 +
| 1303550371
 
| 2012-12-17
 
| 2012-12-17
|  
+
| Completion Testing
 +
| No Violations
 
| On the day of my inspection completion efforts had not begun. There was no activity taking place. No violations noted.
 
| On the day of my inspection completion efforts had not begun. There was no activity taking place. No violations noted.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1333222979
| -1333222979
 
 
| 2013-01-15
 
| 2013-01-15
|  
+
| Completion Testing
 +
| No Violations
 
| On the day of my inspection Ed Smith with XTO was on site. Basic was on site to drill out cement but they were waiting on pipe. No violations noted.
 
| On the day of my inspection Ed Smith with XTO was on site. Basic was on site to drill out cement but they were waiting on pipe. No violations noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1342741658
 
| 1342741658
 
| 2012-07-18
 
| 2012-07-18
|  
+
| Drill / Deepen /  Reopen
| Inspection revealed that driller twisted off down hole motor and bit assembly and after several attempts to retrieve it decision was made to set plug in well bore and then directional drill around lost drill bit@6694' rig crew ran 6641' of drill pipe in well and set 600' plug with 520 sacks ,O-Tex was cement contractor cement plug top should be@600' will confirm when they go back in well to side track around lost down hole motor.
+
| No Violations
|
+
| Inspection revealed that driller twisted off down hole motor and bit assembly and after several attempts to retrieve it decision was made to set plug in well bore and then directional drill around lost drill bit@6694 rig crew ran 6641 of drill pipe in well and set 600 plug with 520 sacks ,O-Tex was cement contractor cement plug top should be@600 will confirm when they go back in well to side track around lost down hole motor.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1350769989
 
| 1350769989
 
| 2012-10-18
 
| 2012-10-18
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| On the day of my inspection rig was still down and waiting on top head drive parts. No violations noted.
 
| On the day of my inspection rig was still down and waiting on top head drive parts. No violations noted.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1416092894
| -1416092894
 
 
| 2012-10-19
 
| 2012-10-19
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Call from company man that rig had been fixed and they were back to drilling.
 
| Call from company man that rig had been fixed and they were back to drilling.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1467154304
 +
| 2018-07-16
 +
| Production Wells
 +
| No Violations
 +
| On the day of my inspection I witnessed that the well was equipped with a four-string casing design, 5.5-inch diameter production casing and 2.875 inch diameter tubing that appeared to be open flowing with no artificial lift technology.  Annular pressure monitoring was in place on both the 13.325-inch diameter surface casing and the 9.625-inch diameter deep intermediate casing, pressures were monitored with transducers with no ability to read pressures at the well head.  Both casings had bleed down lines ran to the production fluid tanks, at the time of my inspection the 13.375-inch diameter casing was open flowing into tanks through a choke manifold.  Production equipment included a Gas Processing Unit, that was inside of containment.  There were also 4- 400-barrel production fluid tanks inside containment.  Production fluid tanks were all shared with 34013207760000, 34013206530000.  There was also a defoamer injection tank near the well head and production fluid tanks.  There was also a gas compressor on the northeast corner of the pad.  There was also a 500 barrel frack tank on location that was no longer hooked up to the wells.  Identification tags were present, and production was up to date.  No violations were found at the time of my inspection.
 
|-
 
|-
| -1481130018
+
| 1481130018
 
| 2012-10-25
 
| 2012-10-25
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| On the day of my inspection the rig was drilling in the lateral section. No violations were noted.
 
| On the day of my inspection the rig was drilling in the lateral section. No violations were noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -1503596207
+
| 1503596207
 
| 2013-02-20
 
| 2013-02-20
|  
+
| Completion Testing
 +
| No Violations
 
| On the day of my inspection the Universal Well Services were stimulating the well. No violations noted.
 
| On the day of my inspection the Universal Well Services were stimulating the well. No violations noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1867908711
 
| 1867908711
 
| 2013-02-13
 
| 2013-02-13
|  
+
| Completion Testing
 +
| No Violations
 
| On the day of my inspection Universal Well Services was on site stimulating the well. I spoke with Ed Smith of XTO who advised that they will be completing 7 stages and drilling out the plugs after commencement of the stimulation. No violations noted.
 
| On the day of my inspection Universal Well Services was on site stimulating the well. I spoke with Ed Smith of XTO who advised that they will be completing 7 stages and drilling out the plugs after commencement of the stimulation. No violations noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2058010280
 
| 2058010280
 
| 2013-01-31
 
| 2013-01-31
|  
+
| Completion Testing
 +
| No Violations
 
| On the day of my inspection the company was preparing for fracing operations. The earth pit was being filled with fresh water. Universal was present.  No violations noted.
 
| On the day of my inspection the company was preparing for fracing operations. The earth pit was being filled with fresh water. Universal was present.  No violations noted.
|
 
|
 
|
 
|-
 
|-
 
| -273165630
 
| 2012-10-05
 
|
 
| Inspection revealed that they were at core point@10,120' rig was circulating well preparing to come out of hole to core potential producing formation.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 375593663
 
| 375593663
| 2012-11-07
+
| 2012-11-7 0:00:
|  
+
| DD
| On the day of my inspection rig was drilling the lateral section at 16,075 ft. TD will be 16,090ft. No violations noted.
+
| No Violations
|
+
| 2.00
|
 
|
 
|-
 
|-
 
| -430586749
 
| 2013-05-16
 
|
 
| On site with local inspector Andrew Corder to look over restoration work preformed at site and I told inspector Corder that once vegetation is fully established restoration work would be satisfactory.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 475297944
 
| 475297944
| 2013-01-24
+
| 2013-1-24 0:00:
|  
+
| CT
| On the day of my inspection the shoe had been drilled out and perforations were made. Rig moving to 20653. No violations noted.
+
| No Violations
|
+
| 0.50
|
 
|
 
|-
 
|-
 
| -488702628
 
| 2014-02-27
 
|
 
| On the day of my inspection the well had all equipment to be capable of production. No violations noted.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 817079473
 
| 817079473
| 2014-10-23
+
| 2014-10-23 0:00
|  
+
| PL
| This site has proper erosion and sediment controls preliminary restoration on this site is complete.
+
| No Violations
|
+
| 0.50
|
 
|  
 
 
|-
 
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 
|-
 
|-
| -887517782
+
|}-->
| 2013-02-14
 
|
 
| On the day of my inspection I was accompanied by Inspector Dave Ball.  Universal Well Services was on site to stimulate the well.  They had to wait on sand truck for a while. No violations noted.
 
|
 
|
 
|
 
|-
 
|}
 
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 19:52, 12 January 2021

Well Details

Well ID: 34-013-20654
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Mead Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-000549
Farm/Lease Name: KALDOR
License Status: Plugged Back
License Date: 2012-04-09
Spud Date: 2012-06-08
Spud Drilling Contractor: WACO DRILLING
Final Drill Date: 2012-10-09
Well Total Depth: 10400.00 ft
Configuration: Vertical
Latitude: 39.970000
Longitude: -80.830000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-01-11 Proposed Formations:UTICA SHALE, Issued Date:1/11/2012, Expired Date:1/10/2014 12:00:00 PM, Drilling unit acres:460.99, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2012-04-09 Proposed Formations:TRENTON, Issued Date:4/9/2012, Expired Date:4/9/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2012-10-09
Completion Report Received 2013-01-08
End of Confidential Data 2013-10-09
Construction Permit Expires 2014-04-09
Record Last Modified 2018-04-19

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/11/2013 02/11/2013 10283.0 9459156.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor - MC-MX-588-2 Multi-Chem Scale Inhibitor Whole Product None None
Other -(non hazardous) 70.0 0.0389389
Hydrotreated light distillates (10-30) 64742-47-8 30.0 0.0166881
Hydrochloric Acid (15-40) blended down to 7.5 7647-01-0 15.0 0.147648
4,4 -Dimethyloxazolidine 51200-87-4 95.0 0.0091383
Other -(non hazardous) 40.0 0.0019274
3,4,4-Trimethyloxazolidine 75673-43-7 4.5 0.0004329
Other -(non hazardous) 100.0 0.0083895
Glutaraldehyde 111-30-8 60.0 0.0028911
2-Amino-2-Methyl-1-Propanol 124-68-5 0.5 0.00004810
Other -(non hazardous) 85.0 0.8366718
Friction Reducer - MC MX-14-5 Multi-Chem Friction Reducer Whole Product None None
Biocide - MC 8520 Multi-Chem Biocide Whole Product None None
Acid - 15 HCl Acid Universal Acid Whole Product None None
Biocide - MC 8650 Multi-Chem Biocide Whole Product None None
Water water 7732-18-5 100.0 88.8014737
Sand Proppant sand 14808-60-7 100.0 10.1357522

For data sources see[3]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 XTO ENERGY INC. Brine 32258 336
2015 XTO ENERGY INC. Brine 7767 325
2016 XTO ENERGY INC. Brine 4399 255
2017 XTO ENERGY INC. Brine 19086 340
2018 XTO ENERGY INC. Brine 3820 338
2019 XTO ENERGY INC. Brine 3879 81

For data sources see[4] [5]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1303550371 2012-12-17 0:00 CT No Violations 0.50
-1333222979 2013-1-15 0:00: CT No Violations 1.50
-1416092894 2012-10-19 0:00 DD No Violations 0.50
-1467154304 2018-7-16 0:00: PW No Violations
-1481130018 2012-10-25 0:00 DD No Violations
-1503596207 2013-2-20 0:00: CT No Violations 2.00
-273165630 2012-10-5 0:00: DD No Violations
-430586749 2013-5-16 0:00: PL No Violations
-488702628 2014-2-27 0:00: PW No Violations
-887517782 2013-2-14 0:00: CT No Violations 3.00
0109806723 2012-11-01 Drill / Deepen / Reopen No Violations On the day of my inspection the rig was drilling in the lateral section at 13429ft. No violations were noted.
0273165630 2012-10-05 Drill / Deepen / Reopen No Violations Inspection revealed that they were at core point@10,120 rig was circulating well preparing to come out of hole to core potential producing formation.
0375593663 2012-11-07 Drill / Deepen / Reopen No Violations On the day of my inspection rig was drilling the lateral section at 16,075 ft. TD will be 16,090ft. No violations noted.
0430586749 2013-05-16 Preliminary Restoration No Violations On site with local inspector Andrew Corder to look over restoration work preformed at site and I told inspector Corder that once vegetation is fully established restoration work would be satisfactory.
0475297944 2013-01-24 Completion Testing No Violations On the day of my inspection the shoe had been drilled out and perforations were made. Rig moving to 20653. No violations noted.
0488702628 2014-02-27 Production Wells No Violations On the day of my inspection the well had all equipment to be capable of production. No violations noted.
0817079473 2014-10-23 Preliminary Restoration No Violations This site has proper erosion and sediment controls preliminary restoration on this site is complete.
0887517782 2013-02-14 Completion Testing No Violations On the day of my inspection I was accompanied by Inspector Dave Ball. Universal Well Services was on site to stimulate the well. They had to wait on sand truck for a while. No violations noted.
109806723 2012-11-1 0:00: DD No Violations 1.00
1303550371 2012-12-17 Completion Testing No Violations On the day of my inspection completion efforts had not begun. There was no activity taking place. No violations noted.
1333222979 2013-01-15 Completion Testing No Violations On the day of my inspection Ed Smith with XTO was on site. Basic was on site to drill out cement but they were waiting on pipe. No violations noted.
1342741658 2012-07-18 Drill / Deepen / Reopen No Violations Inspection revealed that driller twisted off down hole motor and bit assembly and after several attempts to retrieve it decision was made to set plug in well bore and then directional drill around lost drill bit@6694 rig crew ran 6641 of drill pipe in well and set 600 plug with 520 sacks ,O-Tex was cement contractor cement plug top should be@600 will confirm when they go back in well to side track around lost down hole motor.
1350769989 2012-10-18 Drill / Deepen / Reopen No Violations On the day of my inspection rig was still down and waiting on top head drive parts. No violations noted.
1416092894 2012-10-19 Drill / Deepen / Reopen No Violations Call from company man that rig had been fixed and they were back to drilling.
1467154304 2018-07-16 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a four-string casing design, 5.5-inch diameter production casing and 2.875 inch diameter tubing that appeared to be open flowing with no artificial lift technology. Annular pressure monitoring was in place on both the 13.325-inch diameter surface casing and the 9.625-inch diameter deep intermediate casing, pressures were monitored with transducers with no ability to read pressures at the well head. Both casings had bleed down lines ran to the production fluid tanks, at the time of my inspection the 13.375-inch diameter casing was open flowing into tanks through a choke manifold. Production equipment included a Gas Processing Unit, that was inside of containment. There were also 4- 400-barrel production fluid tanks inside containment. Production fluid tanks were all shared with 34013207760000, 34013206530000. There was also a defoamer injection tank near the well head and production fluid tanks. There was also a gas compressor on the northeast corner of the pad. There was also a 500 barrel frack tank on location that was no longer hooked up to the wells. Identification tags were present, and production was up to date. No violations were found at the time of my inspection.
1481130018 2012-10-25 Drill / Deepen / Reopen No Violations On the day of my inspection the rig was drilling in the lateral section. No violations were noted.
1503596207 2013-02-20 Completion Testing No Violations On the day of my inspection the Universal Well Services were stimulating the well. No violations noted.
1867908711 2013-02-13 Completion Testing No Violations On the day of my inspection Universal Well Services was on site stimulating the well. I spoke with Ed Smith of XTO who advised that they will be completing 7 stages and drilling out the plugs after commencement of the stimulation. No violations noted.
2058010280 2013-01-31 Completion Testing No Violations On the day of my inspection the company was preparing for fracing operations. The earth pit was being filled with fresh water. Universal was present. No violations noted.
375593663 2012-11-7 0:00: DD No Violations 2.00
475297944 2013-1-24 0:00: CT No Violations 0.50
817079473 2014-10-23 0:00 PL No Violations 0.50

For data sources see[6]