If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-013-21317 | | Well ID: 34-013-21317 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.13, -80.74 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: RIDGETOP 210956 | | Farm/Lease Name: RIDGETOP 210956 | ||
|- | |- | ||
− | | License Status: | + | | License Status: Producing |
|- | |- | ||
| License Date: 2018-02-09 | | License Date: 2018-02-09 | ||
Line 29: | Line 29: | ||
| Final Drill Date: 2018-03-02 | | Final Drill Date: 2018-03-02 | ||
|- | |- | ||
− | | Well Total Depth: 19255 ft | + | | Well Total Depth: 19255.00 ft |
|- | |- | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.130000 |
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.740000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Well History == | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 81: | Line 81: | ||
| title = Risk Based Data Management System - Well and WellHistry Tables | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
− | + | == Perforation Treatments == | |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" style="text-align: center"| Perforation Date | !scope="col" style="text-align: center"| Perforation Date | ||
Line 91: | Line 91: | ||
!scope="col" style="text-align: center"| Number of Shots | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | |}--> | + | | |
+ | | style="text-align: right;" | 18982 | ||
+ | | style="text-align: right;" | 19085 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 10671 | ||
+ | | style="text-align: right;" | 10827 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 10671 | ||
+ | | style="text-align: right;" | 10827 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 454: | Line 475: | ||
!scope="col" style="text-align: center"| Inspection Result | !scope="col" style="text-align: center"| Inspection Result | ||
!scope="col" style="text-align: center"| Inspection Comments | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | -1960799181 | ||
+ | | 2020-10-26 0:00 | ||
+ | | PB | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -2103245087 | ||
+ | | 2020-3-26 0:00: | ||
+ | | PL | ||
+ | | No Violations | ||
+ | | 0.30 | ||
+ | |- | ||
+ | | -358101444 | ||
+ | | 2018-2-20 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | 1.00 | ||
+ | |- | ||
+ | | -619280886 | ||
+ | | 2018-1-24 0:00: | ||
+ | | CS | ||
+ | | No Violations | ||
+ | | 4.00 | ||
|- | |- | ||
| 0358101444 | | 0358101444 | ||
Line 478: | Line 523: | ||
| No Violations | | No Violations | ||
| Status check inspection found the well drilling and completion process complete on all 5 wells on the pad. A service rig owned by Hybrid Service Company is on location and has completed the completion drill out on the #5 well. Annular pressure monitoring is in place on each well head A&B section. 3rd party contractors are on site installing all surface production equipment. The preliminary restoration was reviewed and no erosion or vegetation issues were noted however some areas were disturbed around the pad during the installation of the midstream pipe line, the preliminary restoration will need followed back up on later after the disturbed areas have had a chance for vegetation to establish. The well pad and lease road surface are stone construction and in good repair. The well pad perimeter earthen berm is in good condition. | | Status check inspection found the well drilling and completion process complete on all 5 wells on the pad. A service rig owned by Hybrid Service Company is on location and has completed the completion drill out on the #5 well. Annular pressure monitoring is in place on each well head A&B section. 3rd party contractors are on site installing all surface production equipment. The preliminary restoration was reviewed and no erosion or vegetation issues were noted however some areas were disturbed around the pad during the installation of the midstream pipe line, the preliminary restoration will need followed back up on later after the disturbed areas have had a chance for vegetation to establish. The well pad and lease road surface are stone construction and in good repair. The well pad perimeter earthen berm is in good condition. | ||
+ | |- | ||
+ | | 1443568654 | ||
+ | | 2020-8-11 0:00: | ||
+ | | PL | ||
+ | | No Violations | ||
+ | | 0.20 | ||
|- | |- | ||
| 1835612077 | | 1835612077 | ||
Line 484: | Line 535: | ||
| No Violations | | No Violations | ||
| Status check inspection and documentation on the well drilling and completion process. The well drilling process is complete and the well is equipped with a lower A and upper B section with a production casing flow cross installed atop the B section and 2 valves installed vertically atop the production flow cross to allow the company to manage any unanticipated pressure that may be experienced on the 5.5 production casing while they are awaiting the well stimulation which is scheduled for January 5th 2019. The well head A&B sections are equipped with 2 diameter riser pipes, valves and gauges are present on the riser pipes to monitor annular pressure. I spoke with the company production foreman Eric Indermuhle on this day and they are monitoring and recording the pressures regularly. No production equipment has been installed on the well pad however the mid stream pipeline is being installed by EQT. The pad surface and lease road is of stone construction and in good repair. | | Status check inspection and documentation on the well drilling and completion process. The well drilling process is complete and the well is equipped with a lower A and upper B section with a production casing flow cross installed atop the B section and 2 valves installed vertically atop the production flow cross to allow the company to manage any unanticipated pressure that may be experienced on the 5.5 production casing while they are awaiting the well stimulation which is scheduled for January 5th 2019. The well head A&B sections are equipped with 2 diameter riser pipes, valves and gauges are present on the riser pipes to monitor annular pressure. I spoke with the company production foreman Eric Indermuhle on this day and they are monitoring and recording the pressures regularly. No production equipment has been installed on the well pad however the mid stream pipeline is being installed by EQT. The pad surface and lease road is of stone construction and in good repair. | ||
+ | |- | ||
+ | | 535220086 | ||
+ | | 2018-2-15 0:00: | ||
+ | | CS | ||
+ | | No Violations | ||
+ | | 4.00 | ||
|- | |- | ||
|} | |} | ||
Line 498: | Line 555: | ||
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> |
Well ID: 34-013-21317 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.13,"lon":-80.74,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Pease Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001529 | |
Farm/Lease Name: RIDGETOP 210956 | |
License Status: Producing | |
License Date: 2018-02-09 | |
Spud Date: 2018-01-24 | |
Spud Drilling Contractor: PIONEER DRILLING | |
Final Drill Date: 2018-03-02 | |
Well Total Depth: 19255.00 ft | |
Configuration: Horizontal | |
Latitude: 40.130000 | |
Longitude: -80.740000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-12-27 | Proposed Formations:REEDSVILLE, Issued Date:12/27/2017, Expired Date:12/27/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:ESPW |
APP | 2018-02-09 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:2/9/2018, Expired Date:2/9/2020 12:00:00 PM, Drilling unit acres:614.356, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2018-03-02 | |
Correction to Well | 2018-03-09 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
Record Last Modified | 2018-08-22 | |
Correction to Well | 2018-08-24 | TAKE TARGET AS-DRILLED |
Construction Permit Expires | 2020-02-09 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
18982 | 19085 | 0 | |
10671 | 10827 | 0 | |
10671 | 10827 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/14/2019 | 02/11/2019 | 10285 | 11,547,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Silca) | Muskie | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.0061 | 10,755,600.0 |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 74 | 0.0221942 | 23856.7 | |
Hydrochloric Acid | 7647-01-0 | 3 | 0.000418916 | 450.297 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 2 | 0.00175716 | 1888.79 | ||||
Petroleum Distillate | 64742-47-8 | 20 | 0.0175716 | 18887.9 | ||||
Methanol | 67-56-1 | 35 | 0.000423411 | 455.129 | ||||
Fatty acids, tall oil | 61790-12-3 | 5 | 0.00006049 | 65.018 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00006049 | 65.018 | ||||
Didecyl dimethyl Ammonium Chloride | 7173-51-5 | 3 | 0.000899763 | 967.165 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.000120975 | 130.037 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000878581 | 944.395 | ||||
Water | 7732-18-5 | 45 | 0.0395361 | 42497.8 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.00175716 | 1888.79 | ||||
Methanol | 67-56-1 | 1 | 0.000139639 | 150.099 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00006049 | 65.018 | ||||
Quaternary Ammonium chloride | 68424-85-1 | 3 | 0.000899763 | 967.165 | ||||
Olefin | Proprietary | 5 | 0.00006049 | 65.018 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00006049 | 65.018 | ||||
SC-30 | X-Chem | Scale inhibitor | Methanol | 67-56-1 | 1 | 0.000139639 | 150.099 | |
Hydrochloric Acid | 7647-01-0 | 3 | 0.000418916 | 450.297 | ||||
Sodium polyphosphonate | proprietary | 1 | 0.000139639 | 150.099 | ||||
Biotreat 15588 | X-Chem | Biocide | Glutaraldehyde | 111-30-8 | 20 | 0.00599842 | 6447.76 | |
Quaternary Ammonium chloride | 68424-85-1 | 3 | 0.000899763 | 967.165 | ||||
Didecyl dimethyl Ammonium Chloride | 7173-51-5 | 3 | 0.000899763 | 967.165 | ||||
Water | 7732-18-5 | 74 | 0.0221942 | 23856.7 | ||||
Hydrochloric Acid (28%) | Oxy | Acidizing | Hydrochloric Acid (Hydrogen Chloride) | 7647-01-0 | 28 | 0.0555047 | 59662.6 | |
Oil Safe AR | Heartland | Acicdizing | Proprietary | Proprietary | 30 | 0.00463461 | 4981.79 | |
NEFE-180 | Chemplex | Corrosion Inhibitor/Iron Control | 2-Ethylhexanol | 104-76-7 | 10 | 0.000120975 | 130.037 | |
2-Propyn-1-ol | 107-19-7 | 5 | 0.00006049 | 65.018 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00006049 | 65.018 | ||||
Methanol | 67-56-1 | 35 | 0.000423411 | 455.129 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00006049 | 65.018 | ||||
Acetic acid | 64-19-7 | 65 | 0.000786335 | 845.239 | ||||
Fatty acids, tall oil | 61790-12-3 | 5 | 0.00006049 | 65.018 | ||||
Olefin | Proprietary | 5 | 0.00006049 | 65.018 | ||||
Water | Gulfport Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.6472 | 96,362,700.0 | |
Plexslick 957 | Chemplex | Friction Reducer | Petroleum Distillate | 64742-47-8 | 20 | 0.0175716 | 18887.9 | |
Ammonium Chloride | 12125-02-9 | 1 | 0.000878581 | 944.395 | ||||
Water | 7732-18-5 | 45 | 0.0395361 | 42497.8 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.00175716 | 1888.79 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 2 | 0.00175716 | 1888.79 | ||||
Copolymer of 2-propenamide | 69418-26-4 | 30 | 0.0263574 | 28331.9 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1960799181 | 2020-10-26 0:00 | PB | No Violations | |
-2103245087 | 2020-3-26 0:00: | PL | No Violations | 0.30 |
-358101444 | 2018-2-20 0:00: | DD | No Violations | 1.00 |
-619280886 | 2018-1-24 0:00: | CS | No Violations | 4.00 |
0358101444 | 2018-02-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Pioneer Rig 77 was finishing the 12.25-inch diameter section of the well bore. After removing the drill pipe from the well bore the company will run and cement the 9.625-inch diameter casing string. Stingray Cementing Services will provide the cementing applications. |
0535220086 | 2018-02-15 | Casing String Witnessed | No Violations | On the day of my inspection Pioneer Rig 73 had reached total depth in the 24-inch diameter open hole section of the wellbore. A void was encountered from 410 feet to 414 feet. Stingray Cementing Services was on site to preform cementing procedures. There was a safety meeting prior to the cementing. During cementing operations, Stingray pumped 63 barrels of Class A cement to tack the casing shoe. Following that process the 1-inch diameter tubing was ran into the annulus space and the backside was topped off from the packer to surface. There was 61 barrels of Class A cement pumped through the 1-inch to establish cement returns to surface. Cement additives included .3 percent Calcium Chloride and .25 pound per sack of celluseal. |
0619280886 | 2018-01-24 | Casing String Witnessed | No Violations | Precision Drilling reached total depth of the 36-inch diameter open hole section of this well bore at 110 feet. The 26-inch diameter welded casing was placed into the open well bore. Stingray Cementing was on site to cement the casing string in place. Stingray pumped 430 sacks of Class A cement with 30 percent excess utilized. Cement returns to surface were established. |
1368981088 | 2019-03-20 | Preliminary Restoration | No Violations | Status check inspection found the well drilling and completion process complete on all 5 wells on the pad. A service rig owned by Hybrid Service Company is on location and has completed the completion drill out on the #5 well. Annular pressure monitoring is in place on each well head A&B section. 3rd party contractors are on site installing all surface production equipment. The preliminary restoration was reviewed and no erosion or vegetation issues were noted however some areas were disturbed around the pad during the installation of the midstream pipe line, the preliminary restoration will need followed back up on later after the disturbed areas have had a chance for vegetation to establish. The well pad and lease road surface are stone construction and in good repair. The well pad perimeter earthen berm is in good condition. |
1443568654 | 2020-8-11 0:00: | PL | No Violations | 0.20 |
1835612077 | 2018-08-14 | Completion Testing | No Violations | Status check inspection and documentation on the well drilling and completion process. The well drilling process is complete and the well is equipped with a lower A and upper B section with a production casing flow cross installed atop the B section and 2 valves installed vertically atop the production flow cross to allow the company to manage any unanticipated pressure that may be experienced on the 5.5 production casing while they are awaiting the well stimulation which is scheduled for January 5th 2019. The well head A&B sections are equipped with 2 diameter riser pipes, valves and gauges are present on the riser pipes to monitor annular pressure. I spoke with the company production foreman Eric Indermuhle on this day and they are monitoring and recording the pressures regularly. No production equipment has been installed on the well pad however the mid stream pipeline is being installed by EQT. The pad surface and lease road is of stone construction and in good repair. |
535220086 | 2018-2-15 0:00: | CS | No Violations | 4.00 |
For data sources see[5]