X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-013-21317"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-013-21317
 
| Well ID: 34-013-21317
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.131374410, -80.74602936 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.13, -80.74 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 11: Line 11:
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
|-
 
|-
| Municipality: [[Pease Township,_Belmont_County,_Ohio|Pease Township]]
+
| Municipality: [[Pease_Township,_Belmont_County,_Ohio|Pease Township]]
 
|-
 
|-
 
| Operator Name: [[GULFPORT APPALACHIA LLC]]
 
| Operator Name: [[GULFPORT APPALACHIA LLC]]
Line 19: Line 19:
 
| Farm/Lease Name: RIDGETOP 210956
 
| Farm/Lease Name: RIDGETOP 210956
 
|-
 
|-
| License Status: Well Drilled
+
| License Status: Producing
 
|-
 
|-
 
| License Date: 2018-02-09
 
| License Date: 2018-02-09
Line 29: Line 29:
 
| Final Drill Date: 2018-03-02
 
| Final Drill Date: 2018-03-02
 
|-
 
|-
| Well Total Depth: 19255 ft
+
| Well Total Depth: 19255.00 ft
 
|-
 
|-
 
| Configuration: Horizontal
 
| Configuration: Horizontal
 
|-
 
|-
| Latitude: 40.131374410
+
| Latitude: 40.130000
 
|-
 
|-
| Longitude: -80.74602936
+
| Longitude: -80.740000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 81: Line 81:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
<!--== Perforation Treatments ==
+
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Perforation Date
Line 91: Line 91:
 
!scope="col" style="text-align: center"| Number of Shots
 
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
|}-->
+
|
 +
| style="text-align: right;" | 18982
 +
| style="text-align: right;" | 19085
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 +
| style="text-align: right;" | 10671
 +
| style="text-align: right;" | 10827
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 +
| style="text-align: right;" | 10671
 +
| style="text-align: right;" | 10827
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 454: Line 475:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1960799181
 +
| 2020-10-26 0:00
 +
| PB
 +
| No Violations
 +
|
 +
|-
 +
| -2103245087
 +
| 2020-3-26 0:00:
 +
| PL
 +
| No Violations
 +
| 0.30
 +
|-
 +
| -358101444
 +
| 2018-2-20 0:00:
 +
| DD
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -619280886
 +
| 2018-1-24 0:00:
 +
| CS
 +
| No Violations
 +
| 4.00
 
|-
 
|-
 
| 0358101444
 
| 0358101444
Line 478: Line 523:
 
| No Violations
 
| No Violations
 
|  Status check inspection found the well drilling and completion process complete on all 5 wells on the pad. A service rig owned by Hybrid Service Company is on location and has completed the completion drill out on the #5 well. Annular pressure monitoring is in place on each well head A&B section. 3rd party contractors are on site installing all surface production equipment. The preliminary restoration was reviewed and no erosion or vegetation issues were noted however some areas were disturbed around the pad during the installation of the midstream pipe line, the preliminary restoration will need followed back up on later after the disturbed areas have had a chance for vegetation to establish. The well pad and lease road surface are stone construction and in good repair. The well pad perimeter earthen berm is in good condition.
 
|  Status check inspection found the well drilling and completion process complete on all 5 wells on the pad. A service rig owned by Hybrid Service Company is on location and has completed the completion drill out on the #5 well. Annular pressure monitoring is in place on each well head A&B section. 3rd party contractors are on site installing all surface production equipment. The preliminary restoration was reviewed and no erosion or vegetation issues were noted however some areas were disturbed around the pad during the installation of the midstream pipe line, the preliminary restoration will need followed back up on later after the disturbed areas have had a chance for vegetation to establish. The well pad and lease road surface are stone construction and in good repair. The well pad perimeter earthen berm is in good condition.
 +
|-
 +
| 1443568654
 +
| 2020-8-11 0:00:
 +
| PL
 +
| No Violations
 +
| 0.20
 
|-
 
|-
 
| 1835612077
 
| 1835612077
Line 484: Line 535:
 
| No Violations
 
| No Violations
 
|  Status check inspection and documentation on the well drilling and completion process. The well drilling process is complete and the well is equipped with a lower A and upper B section with a production casing flow cross installed atop the B section and 2 valves installed vertically atop the production flow cross to allow the company to manage any unanticipated pressure that may be experienced on the 5.5 production casing while they are awaiting the well stimulation which is scheduled for January 5th 2019. The well head A&B sections are equipped with 2 diameter riser pipes, valves and gauges are present on the riser pipes to monitor annular pressure. I spoke with the company production foreman Eric Indermuhle on this day and they are monitoring and  recording the pressures regularly. No production equipment has been installed on the well pad however the mid stream pipeline is being installed by EQT. The pad surface and lease road is of stone construction and in good repair.
 
|  Status check inspection and documentation on the well drilling and completion process. The well drilling process is complete and the well is equipped with a lower A and upper B section with a production casing flow cross installed atop the B section and 2 valves installed vertically atop the production flow cross to allow the company to manage any unanticipated pressure that may be experienced on the 5.5 production casing while they are awaiting the well stimulation which is scheduled for January 5th 2019. The well head A&B sections are equipped with 2 diameter riser pipes, valves and gauges are present on the riser pipes to monitor annular pressure. I spoke with the company production foreman Eric Indermuhle on this day and they are monitoring and  recording the pressures regularly. No production equipment has been installed on the well pad however the mid stream pipeline is being installed by EQT. The pad surface and lease road is of stone construction and in good repair.
 +
|-
 +
| 535220086
 +
| 2018-2-15 0:00:
 +
| CS
 +
| No Violations
 +
| 4.00
 
|-
 
|-
 
|}
 
|}
Line 498: Line 555:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Latest revision as of 19:24, 12 January 2021

Well Details

Well ID: 34-013-21317
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Pease Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001529
Farm/Lease Name: RIDGETOP 210956
License Status: Producing
License Date: 2018-02-09
Spud Date: 2018-01-24
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2018-03-02
Well Total Depth: 19255.00 ft
Configuration: Horizontal
Latitude: 40.130000
Longitude: -80.740000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-12-27 Proposed Formations:REEDSVILLE, Issued Date:12/27/2017, Expired Date:12/27/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:ESPW
APP 2018-02-09 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:2/9/2018, Expired Date:2/9/2020 12:00:00 PM, Drilling unit acres:614.356, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2018-03-02
Correction to Well 2018-03-09 CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT.
Record Last Modified 2018-08-22
Correction to Well 2018-08-24 TAKE TARGET AS-DRILLED
Construction Permit Expires 2020-02-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
18982 19085 0
10671 10827 0
10671 10827 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/14/2019 02/11/2019 10285 11,547,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Silca) Muskie Proppant Silica Substrate 14808-60-7 100 10.0061 10,755,600.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 74 0.0221942 23856.7
Hydrochloric Acid 7647-01-0 3 0.000418916 450.297
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00175716 1888.79
Petroleum Distillate 64742-47-8 20 0.0175716 18887.9
Methanol 67-56-1 35 0.000423411 455.129
Fatty acids, tall oil 61790-12-3 5 0.00006049 65.018
2-Propyn-1-ol 107-19-7 5 0.00006049 65.018
Didecyl dimethyl Ammonium Chloride 7173-51-5 3 0.000899763 967.165
2-Ethylhexanol 104-76-7 10 0.000120975 130.037
Ammonium Chloride 12125-02-9 1 0.000878581 944.395
Water 7732-18-5 45 0.0395361 42497.8
Oleic Acid Diethanolamide 93-83-4 2 0.00175716 1888.79
Methanol 67-56-1 1 0.000139639 150.099
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006049 65.018
Quaternary Ammonium chloride 68424-85-1 3 0.000899763 967.165
Olefin Proprietary 5 0.00006049 65.018
Coconut oil acid diethanolamine 68603-42-9 5 0.00006049 65.018
SC-30 X-Chem Scale inhibitor Methanol 67-56-1 1 0.000139639 150.099
Hydrochloric Acid 7647-01-0 3 0.000418916 450.297
Sodium polyphosphonate proprietary 1 0.000139639 150.099
Biotreat 15588 X-Chem Biocide Glutaraldehyde 111-30-8 20 0.00599842 6447.76
Quaternary Ammonium chloride 68424-85-1 3 0.000899763 967.165
Didecyl dimethyl Ammonium Chloride 7173-51-5 3 0.000899763 967.165
Water 7732-18-5 74 0.0221942 23856.7
Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0555047 59662.6
Oil Safe AR Heartland Acicdizing Proprietary Proprietary 30 0.00463461 4981.79
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control 2-Ethylhexanol 104-76-7 10 0.000120975 130.037
2-Propyn-1-ol 107-19-7 5 0.00006049 65.018
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006049 65.018
Methanol 67-56-1 35 0.000423411 455.129
Coconut oil acid diethanolamine 68603-42-9 5 0.00006049 65.018
Acetic acid 64-19-7 65 0.000786335 845.239
Fatty acids, tall oil 61790-12-3 5 0.00006049 65.018
Olefin Proprietary 5 0.00006049 65.018
Water Gulfport Energy Carrier/Base Fluid Water 7732-18-5 100 89.6472 96,362,700.0
Plexslick 957 Chemplex Friction Reducer Petroleum Distillate 64742-47-8 20 0.0175716 18887.9
Ammonium Chloride 12125-02-9 1 0.000878581 944.395
Water 7732-18-5 45 0.0395361 42497.8
Oleic Acid Diethanolamide 93-83-4 2 0.00175716 1888.79
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00175716 1888.79
Copolymer of 2-propenamide 69418-26-4 30 0.0263574 28331.9

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1960799181 2020-10-26 0:00 PB No Violations
-2103245087 2020-3-26 0:00: PL No Violations 0.30
-358101444 2018-2-20 0:00: DD No Violations 1.00
-619280886 2018-1-24 0:00: CS No Violations 4.00
0358101444 2018-02-20 Drill / Deepen / Reopen No Violations On the day of my inspection Pioneer Rig 77 was finishing the 12.25-inch diameter section of the well bore. After removing the drill pipe from the well bore the company will run and cement the 9.625-inch diameter casing string. Stingray Cementing Services will provide the cementing applications.
0535220086 2018-02-15 Casing String Witnessed No Violations On the day of my inspection Pioneer Rig 73 had reached total depth in the 24-inch diameter open hole section of the wellbore. A void was encountered from 410 feet to 414 feet. Stingray Cementing Services was on site to preform cementing procedures. There was a safety meeting prior to the cementing. During cementing operations, Stingray pumped 63 barrels of Class A cement to tack the casing shoe. Following that process the 1-inch diameter tubing was ran into the annulus space and the backside was topped off from the packer to surface. There was 61 barrels of Class A cement pumped through the 1-inch to establish cement returns to surface. Cement additives included .3 percent Calcium Chloride and .25 pound per sack of celluseal.
0619280886 2018-01-24 Casing String Witnessed No Violations Precision Drilling reached total depth of the 36-inch diameter open hole section of this well bore at 110 feet. The 26-inch diameter welded casing was placed into the open well bore. Stingray Cementing was on site to cement the casing string in place. Stingray pumped 430 sacks of Class A cement with 30 percent excess utilized. Cement returns to surface were established.
1368981088 2019-03-20 Preliminary Restoration No Violations Status check inspection found the well drilling and completion process complete on all 5 wells on the pad. A service rig owned by Hybrid Service Company is on location and has completed the completion drill out on the #5 well. Annular pressure monitoring is in place on each well head A&B section. 3rd party contractors are on site installing all surface production equipment. The preliminary restoration was reviewed and no erosion or vegetation issues were noted however some areas were disturbed around the pad during the installation of the midstream pipe line, the preliminary restoration will need followed back up on later after the disturbed areas have had a chance for vegetation to establish. The well pad and lease road surface are stone construction and in good repair. The well pad perimeter earthen berm is in good condition.
1443568654 2020-8-11 0:00: PL No Violations 0.20
1835612077 2018-08-14 Completion Testing No Violations Status check inspection and documentation on the well drilling and completion process. The well drilling process is complete and the well is equipped with a lower A and upper B section with a production casing flow cross installed atop the B section and 2 valves installed vertically atop the production flow cross to allow the company to manage any unanticipated pressure that may be experienced on the 5.5 production casing while they are awaiting the well stimulation which is scheduled for January 5th 2019. The well head A&B sections are equipped with 2 diameter riser pipes, valves and gauges are present on the riser pipes to monitor annular pressure. I spoke with the company production foreman Eric Indermuhle on this day and they are monitoring and recording the pressures regularly. No production equipment has been installed on the well pad however the mid stream pipeline is being installed by EQT. The pad surface and lease road is of stone construction and in good repair.
535220086 2018-2-15 0:00: CS No Violations 4.00

For data sources see[5]

References