X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-103-25040"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-103-25040
 
| Well ID: 34-103-25040
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.02938767, -81.87428477 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.02, -81.87 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Medina County, Ohio|Medina]]
+
| Country: United States
 +
|-
 +
| State: Ohio
 +
|-
 +
| County: <County>
 
|-
 
|-
 
| Municipality:  
 
| Municipality:  
 
|-
 
|-
| Operator Name: [[BLEACH TECH LLC]]
+
| Operator Name: [[BLEACHTECH LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: BLEACH TECH (SMP #1)
 
|-
 
|-
| First Permit Date:  
+
| License Status: Active Injection
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2012-08-14
 
|-
 
|-
 
| Spud Date: 2012-09-04
 
| Spud Date: 2012-09-04
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[POULSON DRILLING]]
|-
 
| Configuration: Vertical
 
 
|-
 
|-
| Well Status: Active Injection
+
| Final Drill Date: 2012-09-07
 
|-
 
|-
| Violations: 0
+
| Well Total Depth:  
 
|-
 
|-
| Latitude: 41.02938767
+
| Configuration: Vertical
 
|-
 
|-
| Longitude: -81.87428477
+
| Latitude: 41.020000
 
|-
 
|-
 +
| Longitude: -81.870000
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Well Status
!scope="col" | DATE
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Comment
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
| -1233310529
+
| APP
| 2012-11-15
+
| 2012-08-14
|  
+
| Proposed Formations:SALINA F1 SALT, Issued Date:8/14/2012, Expired Date:8/14/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
| The pits have been emptied and filled.
+
|-
 +
| Reached Total Depth
 +
| 2012-09-07
 
|  
 
|  
 +
|-
 +
| Last Compliance Report
 +
| 2012-10-03
 
|  
 
|  
 +
|-
 +
| Completion Report Received
 +
| 2012-10-19
 
|  
 
|  
 
|-
 
|-
 +
| Correction to Well
 +
| 2012-12-28
 +
| CORRECTION TO EXPIRATION DATE.  PERMIT WAS ISSUED AS A NON-URBAN PERMIT BUT IS ACTUALLY AN URBAN PERMIT.  DATE CHANGED TO REFLECT THE ONE YEAR ACTIVATION TIME.
 
|-
 
|-
| 1349435108
+
| Construction Permit Expires
| 2012-10-03
+
| 2013-08-14
 
|  
 
|  
| The rig pulled the 2-7/8 steel drilling string and ran 2-7/8 fiberglass tubing to 2449'.  They hooked up the mud pump and are circulating fresh water to open up the brine cavern.
+
|-
 +
| Record Last Modified
 +
| 2017-10-19
 
|  
 
|  
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
| 2012-10-10
 +
| ACID
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 300 Gal
 +
| style="text-align: right;" | 0
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| 1468496577
+
|}-->
| 2012-09-07
+
<!--== Waste Data ==
|  
+
{| class="wikitable sortable"
| Reached a total depth of 2466 in the Salina F.  Ran 5-1/2 casing and cemented back to surface.  See the casing ticket for details.
+
!scope="col" style="text-align: center"| Period
|  
+
!scope="col" style="text-align: center"| Operator Name
|  
+
!scope="col" style="text-align: center"| Waste Type
|  
+
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
 +
|}-->
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 
|-
 
|-
| 1496659209
+
| -1233310529
| 2012-09-04
+
| 2012-11-15 0:00
|
+
| PL
| Total depth 179'  Ran 165' of 11-3/4 conductor casing.  Petroset cemented with 245 sx of Cement.  See the casing ticket for details.
+
| No Violations
|  
 
|  
 
 
|  
 
|  
 
|-
 
|-
 +
| -1869766327
 +
| 2017-12-1 0:00:
 +
| SM
 +
| No Violations
 +
| 0.20
 
|-
 
|-
| 2120805691
+
| -50386897
| 2012-09-19
+
| 2012-10-1 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
| Appalachian Well Surveys ran a GR/CCL and VDL bond Log.  The bond looked good.  The 5-1/2 casing was tested to 500 psig for fifteen minutes with no drop off.  The test was successful.
+
|-
 +
| -711235124
 +
| 2012-9-11 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -946064795
 +
| 2012-9-5 0:00:0
 +
| DD
 +
| No Violations
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
| -50386897
+
| 0050386897
 
| 2012-10-01
 
| 2012-10-01
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| On location to witness the drilling out of the formation packer collar.
 
| On location to witness the drilling out of the formation packer collar.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0344765039
 +
| 2017-05-18
 +
| Solution Mining Project
 +
| No Violations
 +
| Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status.  The well has been placed into production, and well identification is clearly displayed.  The well status (AI) is correct.  No problems were noted at the time of the inspection.
 
|-
 
|-
| -711235124
+
| 0711235124
 
| 2012-09-11
 
| 2012-09-11
|  
+
| Drill / Deepen /  Reopen
| Found the top of the cement in 5-1/2x7-7/8 annulus at 220'.  Filled to surface with 1.5 cubic yards of 9 sack grout.
+
| No Violations
|  
+
| Found the top of the cement in 5-1/2x7-7/8 annulus at 220.  Filled to surface with 1.5 cubic yards of 9 sack grout.
|  
+
|-
|  
+
| 0946064795
 +
| 2012-09-05
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Total depth of 11 hole was 625.  The rig ran 14 joints of 8-5/8 28# casing to 606.  Petroset cemented w 200 sacks of Class A cement.  See the casing ticket for details.
 +
|-
 +
| 1233310529
 +
| 2012-11-15
 +
| Preliminary Restoration
 +
| No Violations
 +
| The pits have been emptied and filled.
 +
|-
 +
| 1291521760
 +
| 2018-03-30
 +
| Solution Mining Project
 +
| No Violations
 +
| I found the injection well in operation on the day of my inspection.  There is small amount of calcification build-up on the tubing.  I observed no leaks or spills around the well.  There is an identification sign displayed on a steel post next to the well.  There are no problems noted at this time.
 +
|-
 +
| 1349435108
 +
| 2012-10-03
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The rig pulled the 2-7/8 steel drilling string and ran 2-7/8 fiberglass tubing to 2449.  They hooked up the mud pump and are circulating fresh water to open up the brine cavern.
 +
|-
 +
| 1468496577
 +
| 2012-09-07
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Reached a total depth of 2466 in the Salina F.  Ran 5-1/2 casing and cemented back to surface.  See the casing ticket for details.
 +
|-
 +
| 1496659209
 +
| 2012-09-04
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Total depth 179  Ran 165 of 11-3/4 conductor casing.  Petroset cemented with 245 sx of Cement.  See the casing ticket for details.
 +
|-
 +
| 1869766327
 +
| 2017-12-01
 +
| Solution Mining Project
 +
| No Violations
 +
| I found the injection well in operation on the day of my inspection.  There is an identification sign displayed on a steel post next to the well.  There are no problems noted at this time
 +
|-
 +
| 2088118348
 +
| 2019-5-13 0:00:
 +
| SM
 +
| No Violations
 +
| 0.20
 
|-
 
|-
 +
| 2120805691
 +
| 2012-09-19
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Appalachian Well Surveys ran a GR/CCL and VDL bond Log.  The bond looked good.  The 5-1/2 casing was tested to 500 psig for fifteen minutes with no drop off.  The test was successful.
 
|-
 
|-
| -946064795
+
| 344765039
| 2012-09-05
+
| 2017-5-18 0:00:
|
+
| SM
| Total depth of 11 hole was 625'.  The rig ran 14 joints of 8-5/8 28# casing to 606'.  Petroset cemented w 200 sacks of Class A cement.  See the casing ticket for details.
+
| No Violations
|  
 
|  
 
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 20:11, 12 January 2021

Well Details

Well ID: 34-103-25040
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BLEACHTECH LLC
Well Pad ID:
Farm/Lease Name: BLEACH TECH (SMP #1)
License Status: Active Injection
License Date: 2012-08-14
Spud Date: 2012-09-04
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2012-09-07
Well Total Depth:
Configuration: Vertical
Latitude: 41.020000
Longitude: -81.870000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-08-14 Proposed Formations:SALINA F1 SALT, Issued Date:8/14/2012, Expired Date:8/14/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Reached Total Depth 2012-09-07
Last Compliance Report 2012-10-03
Completion Report Received 2012-10-19
Correction to Well 2012-12-28 CORRECTION TO EXPIRATION DATE. PERMIT WAS ISSUED AS A NON-URBAN PERMIT BUT IS ACTUALLY AN URBAN PERMIT. DATE CHANGED TO REFLECT THE ONE YEAR ACTIVATION TIME.
Construction Permit Expires 2013-08-14
Record Last Modified 2017-10-19

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-10-10 ACID 30 300 Gal 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1233310529 2012-11-15 0:00 PL No Violations
-1869766327 2017-12-1 0:00: SM No Violations 0.20
-50386897 2012-10-1 0:00: DD No Violations
-711235124 2012-9-11 0:00: DD No Violations
-946064795 2012-9-5 0:00:0 DD No Violations
0050386897 2012-10-01 Drill / Deepen / Reopen No Violations On location to witness the drilling out of the formation packer collar.
0344765039 2017-05-18 Solution Mining Project No Violations Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status. The well has been placed into production, and well identification is clearly displayed. The well status (AI) is correct. No problems were noted at the time of the inspection.
0711235124 2012-09-11 Drill / Deepen / Reopen No Violations Found the top of the cement in 5-1/2x7-7/8 annulus at 220. Filled to surface with 1.5 cubic yards of 9 sack grout.
0946064795 2012-09-05 Drill / Deepen / Reopen No Violations Total depth of 11 hole was 625. The rig ran 14 joints of 8-5/8 28# casing to 606. Petroset cemented w 200 sacks of Class A cement. See the casing ticket for details.
1233310529 2012-11-15 Preliminary Restoration No Violations The pits have been emptied and filled.
1291521760 2018-03-30 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is small amount of calcification build-up on the tubing. I observed no leaks or spills around the well. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
1349435108 2012-10-03 Drill / Deepen / Reopen No Violations The rig pulled the 2-7/8 steel drilling string and ran 2-7/8 fiberglass tubing to 2449. They hooked up the mud pump and are circulating fresh water to open up the brine cavern.
1468496577 2012-09-07 Drill / Deepen / Reopen No Violations Reached a total depth of 2466 in the Salina F. Ran 5-1/2 casing and cemented back to surface. See the casing ticket for details.
1496659209 2012-09-04 Drill / Deepen / Reopen No Violations Total depth 179 Ran 165 of 11-3/4 conductor casing. Petroset cemented with 245 sx of Cement. See the casing ticket for details.
1869766327 2017-12-01 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time
2088118348 2019-5-13 0:00: SM No Violations 0.20
2120805691 2012-09-19 Drill / Deepen / Reopen No Violations Appalachian Well Surveys ran a GR/CCL and VDL bond Log. The bond looked good. The 5-1/2 casing was tested to 500 psig for fifteen minutes with no drop off. The test was successful.
344765039 2017-5-18 0:00: SM No Violations

For data sources see[4]

References