X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-103-25046"

m
 
m
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-103-25046
 
| Well ID: 34-103-25046
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.0288029872, -81.8727679198 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.02, -81.87 | width=100% | height=100% }}
 
|-
 
|-
| County:
+
| Country: United States
 
|-
 
|-
| Municipality:
+
| State: Ohio
 
|-
 
|-
| Operator Name:
+
| County: <County>
 
|-
 
|-
| Well Pad ID:
+
| Municipality:  
 
|-
 
|-
| Farm/Lease Name:
+
| Operator Name: [[BLEACHTECH LLC]]
 
|-
 
|-
| First Permit Date:
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date:
+
| Farm/Lease Name: BLEACHTECH (SMP #2)
 
|-
 
|-
| Spud Date:
+
| License Status: Active Injection
 
|-
 
|-
| Unconventional:
+
| License Date: 2014-01-28
 
|-
 
|-
| Horizontal:
+
| Spud Date: 2015-12-17
 
|-
 
|-
| Producing:
+
| Spud Drilling Contractor: [[POULSON DRILLING]]
 
|-
 
|-
| Violations: 0
+
| Final Drill Date: 2015-12-29
 
|-
 
|-
| Latitude: 41.0288029872
+
| Well Total Depth: 2628.00 ft
 
|-
 
|-
| Longitude: -81.8727679198
+
| Configuration: Vertical
 
|-
 
|-
 +
| Latitude: 41.020000
 +
|-
 +
| Longitude: -81.870000
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Well Status
!scope="col" | GAS QUANTITY
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comment
!scope="col" | CONDENSATE QUANTITY
+
|-
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| APP
!scope="col" | OIL QUANTITY
+
| 2014-01-28
!scope="col" | OIL PRODUCTION DAYS
+
| Proposed Formations:SALINA F1 SALT, Issued Date:1/28/2014, Expired Date:1/28/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
 +
|-
 +
| Correction to Well
 +
| 2014-03-07
 +
| CORRECTION TO TOWNSHIP NAME.
 +
|-
 +
| Reached Total Depth
 +
| 2015-12-29
 +
 
 +
|-
 +
| Construction Permit Expires
 +
| 2016-01-28
 +
 
 +
|-
 +
| Completion Report Received
 +
| 2016-03-03
 +
 
 +
|-
 +
| Record Last Modified
 +
| 2017-02-14
 +
 
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Perforation Date
!scope="col" | TYPE
+
!scope="col" style="text-align: center"| Interval Top (ft)
!scope="col" | QUANTITY
+
!scope="col" style="text-align: center"| Interval Base (ft)
!scope="col" | UNITS
+
!scope="col" style="text-align: center"| Number of Shots
!scope="col" | DISPOSAL METHOD
+
|-
!scope="col" | WASTE FACILITY PERMIT ID
+
|}-->
!scope="col" | WASTE FACILITY NAME
+
<!--== Fracking Activities ==
!scope="col" | FACILITY CITY
+
==== Fracking Jobs ====
!scope="col" | FACILITY STATE
+
{| class="wikitable sortable" width="95%"
|}
+
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION_COMMENT
+
| -1531652723
 +
| 2015-12-17 0:00
 +
| DD
 +
| No Violations
 +
|
 +
|-
 +
| -1587056333
 +
| 2017-5-18 0:00:
 +
| SM
 +
| No Violations
 +
|
 +
|-
 +
| -751815570
 +
| 2019-5-13 0:00:
 +
| SM
 +
| No Violations
 +
| 0.30
 +
|-
 +
| -885691810
 +
| 2016-1-19 0:00:
 +
| PL
 +
| No Violations
 +
|
 +
|-
 +
| -986312652
 +
| 2020-5-15 0:00:
 +
| SM
 +
| No Violations
 +
| 5.00
 +
|-
 +
| 0595220781
 +
| 2015-12-28
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Visited location on 12/28/2015 to check on the status of operations.  The rig is waiting on cement to set up prior to drilling out.
 +
|-
 +
| 0638660066
 +
| 2018-03-30
 +
| Solution Mining Project
 +
| No Violations
 +
| I found the injection well in operation on the day of my inspection.  There is an identification sign displayed on a steel post next to the well.  There are no problems noted at this time.
 +
|-
 +
| 0717867784
 +
| 2015-12-22
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Visited location on 12/22/2015 to check on the status of operations.  Poulson Drilling drilled to 1,352.  A deviation survey at that point showed a deviation of 3.75 degrees.  The decision was made to trip out the large bit and run in the hole with a 7 7/8 bit to drill a pilot hole to TD to try to straighten the hole out and prevent it from walking further.
 +
|-
 +
| 0885691810
 +
| 2016-01-19
 +
| Preliminary Restoration
 +
| No Violations
 +
| Visited location on 01/19/2016 to check on the status of the preliminary restoration of the site.  Pits have been solidified and closed, and all drilling equipment has been removed.  Preliminary Restoration is approved.
 +
|-
 +
| 1372257128
 +
| 2017-12-01
 +
| Solution Mining Project
 +
| No Violations
 +
| I found the injection well in operation on the day of my inspection.  There is an identification sign displayed on a steel post next to the well.  There are no problems noted at this time.
 +
|-
 +
| 1390418666
 +
| 2015-12-29
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Visited location on 12/29/2015 to check on the status of operations.  Poulson Drilling drilled out cement and into the chamber to 2,628 TD.  Will rig down and move out Poulson Drilling and prepare for the arrival of the service rig.
 +
|-
 +
| 1531652723
 +
| 2015-12-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Stopped by location on 12/17/2015 to check on status of drilling operations.  Poulson Drilling was drilling ahead at 82 through fire clay.
 +
|-
 +
| 1587056333
 +
| 2017-05-18
 +
| Solution Mining Project
 +
| No Violations
 +
| Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status.  The well has been placed into production, however no well identification is posted.  The operator will be contacted and advised to post it promptly.  The well status (AI) is correct.  No other problems were noted at the time of the inspection.
 +
|-
 +
| 2133713127
 +
| 2015-12-23
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Visited location on 12/23/2015 to check on the status of operations.  Poulson Drilling was drilling a 7 7/8 pilot hole ahead at 1,701.
 +
|-
 +
| 595220781
 +
| 2015-12-28 0:00
 +
| DD
 +
| No Violations
 +
|
 +
|-
 +
| 638660066
 +
| 2018-3-30 0:00:
 +
| SM
 +
| No Violations
 +
| 0.20
 +
|-
 +
| 717867784
 +
| 2015-12-22 0:00
 +
| DD
 +
| No Violations
 +
|
 +
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 21:11, 12 January 2021

Well Details

Well ID: 34-103-25046
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BLEACHTECH LLC
Well Pad ID:
Farm/Lease Name: BLEACHTECH (SMP #2)
License Status: Active Injection
License Date: 2014-01-28
Spud Date: 2015-12-17
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2015-12-29
Well Total Depth: 2628.00 ft
Configuration: Vertical
Latitude: 41.020000
Longitude: -81.870000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-01-28 Proposed Formations:SALINA F1 SALT, Issued Date:1/28/2014, Expired Date:1/28/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Correction to Well 2014-03-07 CORRECTION TO TOWNSHIP NAME.
Reached Total Depth 2015-12-29
Construction Permit Expires 2016-01-28
Completion Report Received 2016-03-03
Record Last Modified 2017-02-14

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1531652723 2015-12-17 0:00 DD No Violations
-1587056333 2017-5-18 0:00: SM No Violations
-751815570 2019-5-13 0:00: SM No Violations 0.30
-885691810 2016-1-19 0:00: PL No Violations
-986312652 2020-5-15 0:00: SM No Violations 5.00
0595220781 2015-12-28 Drill / Deepen / Reopen No Violations Visited location on 12/28/2015 to check on the status of operations. The rig is waiting on cement to set up prior to drilling out.
0638660066 2018-03-30 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
0717867784 2015-12-22 Drill / Deepen / Reopen No Violations Visited location on 12/22/2015 to check on the status of operations. Poulson Drilling drilled to 1,352. A deviation survey at that point showed a deviation of 3.75 degrees. The decision was made to trip out the large bit and run in the hole with a 7 7/8 bit to drill a pilot hole to TD to try to straighten the hole out and prevent it from walking further.
0885691810 2016-01-19 Preliminary Restoration No Violations Visited location on 01/19/2016 to check on the status of the preliminary restoration of the site. Pits have been solidified and closed, and all drilling equipment has been removed. Preliminary Restoration is approved.
1372257128 2017-12-01 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
1390418666 2015-12-29 Drill / Deepen / Reopen No Violations Visited location on 12/29/2015 to check on the status of operations. Poulson Drilling drilled out cement and into the chamber to 2,628 TD. Will rig down and move out Poulson Drilling and prepare for the arrival of the service rig.
1531652723 2015-12-17 Drill / Deepen / Reopen No Violations Stopped by location on 12/17/2015 to check on status of drilling operations. Poulson Drilling was drilling ahead at 82 through fire clay.
1587056333 2017-05-18 Solution Mining Project No Violations Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status. The well has been placed into production, however no well identification is posted. The operator will be contacted and advised to post it promptly. The well status (AI) is correct. No other problems were noted at the time of the inspection.
2133713127 2015-12-23 Drill / Deepen / Reopen No Violations Visited location on 12/23/2015 to check on the status of operations. Poulson Drilling was drilling a 7 7/8 pilot hole ahead at 1,701.
595220781 2015-12-28 0:00 DD No Violations
638660066 2018-3-30 0:00: SM No Violations 0.20
717867784 2015-12-22 0:00 DD No Violations

For data sources see[3]

References