X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-119-22399"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-119-22399
 
| Well ID: 34-119-22399
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.889863382, -81.94371409 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.88, -81.94 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Wayne_Township,_Muskingum_County,_Ohio|Wayne Township]]
 
| Municipality: [[Wayne_Township,_Muskingum_County,_Ohio|Wayne Township]]
 
|-
 
|-
| Operator Name: [[CAMERON PRODUCTION CO INC]]
+
| Operator Name: [[CAMERON PRODUCTION CO INC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 29: Line 29:
 
| Final Drill Date: 1971-01-28
 
| Final Drill Date: 1971-01-28
 
|-
 
|-
| Well Total Depth: 4194 ft
+
| Well Total Depth: 4194.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.889863382
+
| Latitude: 39.880000
 
|-
 
|-
| Longitude: -81.94371409
+
| Longitude: -81.940000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 93: Line 93:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Perforation Treatments ==
 
<!--== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 150: Line 150:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 163: Line 163:
 
| 1984
 
| 1984
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 123
+
| style="text-align: right;" | 123.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985
 
| 1985
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 81
+
| style="text-align: right;" | 81.00
| style="text-align: right;" | 68
+
| style="text-align: right;" | 68.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1986
 
| 1986
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 654
+
| style="text-align: right;" | 654.00
| style="text-align: right;" | 75
+
| style="text-align: right;" | 75.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1987
 
| 1987
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 116
+
| style="text-align: right;" | 116.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 89
+
| style="text-align: right;" | 89.00
| style="text-align: right;" | 42
+
| style="text-align: right;" | 42.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1989
 
| 1989
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 262
+
| style="text-align: right;" | 262.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1990
 
| 1990
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 140
+
| style="text-align: right;" | 140.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 103
+
| style="text-align: right;" | 103.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 240
+
| style="text-align: right;" | 240.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 65
+
| style="text-align: right;" | 65.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 193
+
| style="text-align: right;" | 193.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 102
+
| style="text-align: right;" | 102.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 272
+
| style="text-align: right;" | 272.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[SCION ENERGY INC]]
 
| [[SCION ENERGY INC]]
| style="text-align: right;" | 23
+
| style="text-align: right;" | 23.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[RANDELL OIL CO]]
 
| [[RANDELL OIL CO]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1999
 
| 1999
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 784
+
| style="text-align: right;" | 784.00
| style="text-align: right;" | 56
+
| style="text-align: right;" | 56.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 608
+
| style="text-align: right;" | 608.00
| style="text-align: right;" | 34
+
| style="text-align: right;" | 34.00
 
| style="text-align: right;" | 124
 
| style="text-align: right;" | 124
 
|-
 
|-
 
| 2001
 
| 2001
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 534
+
| style="text-align: right;" | 534.00
| style="text-align: right;" | 30
+
| style="text-align: right;" | 30.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 642
+
| style="text-align: right;" | 642.00
| style="text-align: right;" | 27
+
| style="text-align: right;" | 27.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 545
+
| style="text-align: right;" | 545.00
| style="text-align: right;" | 27
+
| style="text-align: right;" | 27.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 266
+
| style="text-align: right;" | 266.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 472
+
| style="text-align: right;" | 472.00
| style="text-align: right;" | 21
+
| style="text-align: right;" | 21.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 240
+
| style="text-align: right;" | 240.00
| style="text-align: right;" | 25
+
| style="text-align: right;" | 25.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 472
+
| style="text-align: right;" | 472.00
| style="text-align: right;" | 21
+
| style="text-align: right;" | 21.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 80
+
| style="text-align: right;" | 80.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 89
+
| style="text-align: right;" | 89.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
| style="text-align: right;" | 18
+
| style="text-align: right;" | 18.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 333: Line 333:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 435: Line 435:
 
|-
 
|-
 
| 1998
 
| 1998
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 441: Line 441:
 
|-
 
|-
 
| 1999
 
| 1999
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 447: Line 447:
 
|-
 
|-
 
| 2000
 
| 2000
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 453: Line 453:
 
|-
 
|-
 
| 2001
 
| 2001
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 459: Line 459:
 
|-
 
|-
 
| 2002
 
| 2002
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 465: Line 465:
 
|-
 
|-
 
| 2003
 
| 2003
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 471: Line 471:
 
|-
 
|-
 
| 2004
 
| 2004
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 477: Line 477:
 
|-
 
|-
 
| 2005
 
| 2005
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 483: Line 483:
 
|-
 
|-
 
| 2006
 
| 2006
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 489: Line 489:
 
|-
 
|-
 
| 2007
 
| 2007
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 495: Line 495:
 
|-
 
|-
 
| 2008
 
| 2008
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 501: Line 501:
 
|-
 
|-
 
| 2009
 
| 2009
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 507: Line 507:
 
|-
 
|-
 
| 2010
 
| 2010
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 513: Line 513:
 
|-
 
|-
 
| 2011
 
| 2011
| [[CAMERON PRODUCTION CO INC]]
+
| [[CAMERON PRODUCTION CO INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 522: Line 522:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 539: Line 539:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -2039874443
 +
| 2012-8-15 0:00:
 +
| PB
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -301236752
 +
| 2007-1-19 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -369497585
 +
| 2012-8-3 0:00:0
 +
| PB
 +
| No Violations
 +
| 2.50
 
|-
 
|-
 
| 0301236752
 
| 0301236752
Line 595: Line 613:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 23:24, 12 January 2021

Well Details

Well ID: 34-119-22399
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Wayne Township
Operator Name: CAMERON PRODUCTION CO INC
Well Pad ID:
Farm/Lease Name: ROBERT STAKER
License Status: Final Restoration
License Date: 2011-08-05
Spud Date: 1970-12-15
Spud Drilling Contractor:
Final Drill Date: 1971-01-28
Well Total Depth: 4194.00 ft
Configuration: Vertical
Latitude: 39.880000
Longitude: -81.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1970-12-15
Completed 1971-01-28
Reached Total Depth 1971-01-28
CO 1984-10-31 1146 ENNEY OILFIELD COMPANY
Change of Owner 1998-01-27 Operator changed from 1146, SCION ENERGY, Inc. to 2409, RANDELL OIL CO
Change of Owner 1998-08-05 Operator changed from 2409, RANDELL OIL CO to 1720, CAMERON PROD CO INC
APP 2011-08-05 Proposed Formations:CLINTON MEDINA, Issued Date:8/5/2011, Expired Date:8/4/2013 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2012-08-15
Record Last Modified 2013-04-11
Construction Permit Expires 2013-08-04

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1779 Bbl 25000

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 SCION ENERGY INC 123.00 0.00 0
1985 SCION ENERGY INC 81.00 68.00 365
1986 SCION ENERGY INC 654.00 75.00 365
1987 SCION ENERGY INC 116.00 0.00 365
1988 SCION ENERGY INC 89.00 42.00 365
1989 SCION ENERGY INC 262.00 0.00 365
1990 SCION ENERGY INC 140.00 0.00 365
1991 SCION ENERGY INC 103.00 0.00 365
1992 SCION ENERGY INC 240.00 0.00 365
1993 SCION ENERGY INC 65.00 0.00 365
1994 SCION ENERGY INC 193.00 0.00 365
1995 SCION ENERGY INC 102.00 0.00 365
1996 SCION ENERGY INC 272.00 0.00 365
1997 SCION ENERGY INC 23.00 0.00 365
1998 RANDELL OIL CO 0.00 0.00 365
1999 CAMERON PRODUCTION CO INC 784.00 56.00 0
2000 CAMERON PRODUCTION CO INC 608.00 34.00 124
2001 CAMERON PRODUCTION CO INC 534.00 30.00 365
2002 CAMERON PRODUCTION CO INC 642.00 27.00 365
2003 CAMERON PRODUCTION CO INC 0.00 0.00 365
2004 CAMERON PRODUCTION CO INC 545.00 27.00 365
2005 CAMERON PRODUCTION CO INC 266.00 0.00 365
2006 CAMERON PRODUCTION CO INC 472.00 21.00 365
2007 CAMERON PRODUCTION CO INC 240.00 25.00 365
2008 CAMERON PRODUCTION CO INC 472.00 21.00 365
2009 CAMERON PRODUCTION CO INC 80.00 0.00 365
2010 CAMERON PRODUCTION CO INC 89.00 0.00 365
2011 CAMERON PRODUCTION CO INC 18.00 0.00 0

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 SCION ENERGY INC Brine 0 0
1985 SCION ENERGY INC Brine 0 365
1986 SCION ENERGY INC Brine 0 365
1987 SCION ENERGY INC Brine 0 365
1988 SCION ENERGY INC Brine 0 365
1989 SCION ENERGY INC Brine 0 365
1990 SCION ENERGY INC Brine 0 365
1991 SCION ENERGY INC Brine 0 365
1992 SCION ENERGY INC Brine 0 365
1993 SCION ENERGY INC Brine 1 365
1994 SCION ENERGY INC Brine 0 365
1995 SCION ENERGY INC Brine 0 365
1996 SCION ENERGY INC Brine 0 365
1997 SCION ENERGY INC Brine 0 365
1998 CAMERON PRODUCTION CO INC Brine 124
1999 CAMERON PRODUCTION CO INC Brine 0
2000 CAMERON PRODUCTION CO INC Brine 124
2001 CAMERON PRODUCTION CO INC Brine 0 365
2002 CAMERON PRODUCTION CO INC Brine 0 365
2003 CAMERON PRODUCTION CO INC Brine 0 365
2004 CAMERON PRODUCTION CO INC Brine 0 365
2005 CAMERON PRODUCTION CO INC Brine 0 365
2006 CAMERON PRODUCTION CO INC Brine 0 365
2007 CAMERON PRODUCTION CO INC Brine 0 365
2008 CAMERON PRODUCTION CO INC Brine 0 365
2009 CAMERON PRODUCTION CO INC Brine 0 365
2010 CAMERON PRODUCTION CO INC Brine 0 365
2011 CAMERON PRODUCTION CO INC Brine 0

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2039874443 2012-8-15 0:00: PB No Violations 1.00
-301236752 2007-1-19 0:00: PW No Violations
-369497585 2012-8-3 0:00:0 PB No Violations 2.50
0301236752 2007-01-19 Production Wells No Violations Producing
0369497585 2012-08-03 Plug / Plug Back No Violations Cameron rig pulled all 210round tubing out. Appalachian wireline ran in and perforated 4.5casing at 2987. They shot 10 holes at 1 foot apart. All casing is rotted around 214. Rig will run 2tubing in and spot plug at lime on 8-6-12.
1085144377 2012-08-02 Plug / Plug Back No Violations Cameron drilling has service rig on location and has ran 2 10 round thread tubing in to depth of 3968.Cemenco pumped capacity of pipe and mixed 30 sacks of cement and then displaced to 3568. Well did not circulate and cement was mixed at 15.6 lb/gal. Fluid level is at 150down.
1344963071 2012-08-06 Plug / Plug Back No Violations Cameron ran 2tubing in to depth of 3024-1824 and spotted plug at perforations. Cemenco ran 45 sacks on cement plug. No circulation took place during this plug.
1346058571 2012-08-07 Plug / Plug Back No Violations Appalachian wire line is shooting off 4.5 casing at 1250. The Cameron rig pulled tension on 4.5casing and there was only 2,000 lbs. There was only 200 pulled out of well. The company and I decided to plug with clay back to surface due to all casing was all rotted off. The 7and 8casing was rotted off and had dropped into well.
1365536651 2013-04-09 Final Restoration No Violations Final Restoration passed by Patrick Shreve on 4-9-13.
2039874443 2012-08-15 Plug / Plug Back No Violations Rig crew is closing pit and cutting off 10.75casing.Well is staying topped off and full.

For data sources see[8]

References