X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-019-22635"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-019-22635
 
| Well ID: 34-019-22635
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.64328042, -81.07456973 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.64, -81.07 | width=100% | height=100% }}
 
|-
 
|-
| County:  
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name:  
+
| County: [[Carroll_County,_Ohio|Carroll]]
 
|-
 
|-
| Well Pad ID:  
+
| Municipality: [[Washington_Township,_Carroll_County,_Ohio|Washington Township]]
 
|-
 
|-
| Farm/Lease Name:  
+
| Operator Name: [[PENNENERGY RESOURCES LLC]]
 
|-
 
|-
| First Permit Date:  
+
| Well Pad ID: [[US-OH-001172]]
 
|-
 
|-
| Last Permit Date:  
+
| Farm/Lease Name: KIKO UNIT
 +
|-
 +
| License Status: Producing
 +
|-
 +
| License Date: 2014-11-07
 
|-
 
|-
 
| Spud Date: 2014-11-13
 
| Spud Date: 2014-11-13
 
|-
 
|-
| Unconventional:
+
| Spud Drilling Contractor: [[SIDEWINDER DRILLING INC]]
|-
 
| Configuration:  
 
 
|-
 
|-
| Well Status: Well Drilled
+
| Final Drill Date: 2015-03-06
 
|-
 
|-
| Violations: 0
+
| Well Total Depth: 12754.00 ft
 
|-
 
|-
| Latitude: 40.64328042
+
| Configuration: Horizontal
 
|-
 
|-
| Longitude: -81.07456973
+
| Latitude: 40.640000
 
|-
 
|-
 +
| Longitude: -81.070000
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Well Status
!scope="col" | DATE
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Comment
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
| 1416320096
+
| APP
| 2014-11-13
+
| 2014-11-07
 +
| Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/7/2014, Expired Date:11/6/2016 12:00:00 PM, Drilling unit acres:554.86, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Reached Total Depth
 +
| 2015-03-06
 
|  
 
|  
| I was on the Kiko # 3 - H location to witness the placement and cementing of the 20 conductor casing. H A D Inc. drilled a 22.25 borehole to 120' GL with an Air Rotary drilling rig. H A D Inc. placed 116' ( 6 joints ) of 20, 88 lbs. / foot, welded joint casing into the borehole.The conductor casing had circulation windows cut into the casing 5' ( @ 111 ) from the bottom of the casing for the placement of the cement slurry. Universal Well Services ( UWS ) connected to the casing and established circulation with 5 barrels of fresh water. Mix water temperature was 38 degrees and pH was 6. UWS mixed and circulated the cement slurry back to surface. The cement slurry consisted of 100 sacks of Type 1 with 3% CaCl2 ( blended ).I observed 4 barrels of cement slurry returned back to surface. Cement fell approximately 5' and will be topped off, if required, when the cellar is constructed. No violations were identified during this inspection.
+
|-
 +
| Correction to Well
 +
| 2015-04-24
 +
| CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
 +
|-
 +
| Correction to Well
 +
| 2016-03-18
 +
| change in takepoint per as drilled plat ALE
 +
|-
 +
| Completion Report Received
 +
| 2016-06-15
 
|  
 
|  
 +
|-
 +
| Construction Permit Expires
 +
| 2016-11-06
 
|  
 
|  
 +
|-
 +
| Change of Owner
 +
| 2018-10-03
 +
| Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
 +
|-
 +
| Record Last Modified
 +
| 2018-10-03
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 2016-02-10
 +
| style="text-align: right;" | 8371
 +
| style="text-align: right;" | 12722
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2109400360
 
| 2015-02-17
 
|
 
| I was on the Kiko # 3 -H location to inspect the drilling operations being conducted. Sidewinder Drilling Rig # 63 drilled a 17.5 borehole to 762' KB. A large water influx @ 744' KB prevented the hole being drilled on air to total depth. Sidewinder Rig #63 was removing the hammer bit and switching over to a tricone drilling bit to finish the surface section on a fluid ( fresh water ) drilling system. A walk around tour of the solids control, air packages and mud tanks did not reveal any violations during this inspection.
 
 
|  
 
|  
 +
| style="text-align: right;" | 8371
 +
| style="text-align: right;" | 12722
 +
| style="text-align: right;" | 0
 +
|-
 
|  
 
|  
 +
| style="text-align: right;" | 8371
 +
| style="text-align: right;" | 12722
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 11/18/2015
 +
| 12/05/2015
 +
| style="text-align: right;" | 7546
 +
| style="text-align: right;" | 8,435,360.0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="24"| 1
 +
| rowspan="2"| Hydrochloric Acid (7.5%)
 +
| rowspan="2"| PVS
 +
| rowspan="2"| Acidizing
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.5
 +
| style="text-align: right;" | 0.0696661
 +
| style="text-align: right;" | 56813.7
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 92.5
 +
| style="text-align: right;" | 0.859216
 +
| style="text-align: right;" | 700703
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| Scaletrol 767W
 +
| rowspan="4"| Baker Hughes
 +
| rowspan="4"| Scale Inhibitor
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.006066
 +
| style="text-align: right;" | 4266.12
 +
|-
 +
| Ammonium Chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.000202
 +
| style="text-align: right;" | 142.204
 +
|-
 +
| Organophosphonate
 +
| 129828-36-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.003033
 +
| style="text-align: right;" | 2133.06
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 75
 +
| style="text-align: right;" | 0.015165
 +
| style="text-align: right;" | 10665.3
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand (Proppant)
 +
| rowspan="1"| Sargent/Momentive/Preffered
 +
| rowspan="1"| Proppant
 +
| Silica Substrate
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 12.6705
 +
| style="text-align: right;" | 10,333,000.0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| AP Breaker
 +
| rowspan="1"| Sagar Enterprise
 +
| rowspan="1"| Gel Breaker
 +
| Ammonium Persulfate
 +
| 7727-54-0
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00008829
 +
| style="text-align: right;" | 72
 +
|-
 +
|- valign="top"
 +
| rowspan="6"| Acid Inhibitor, Unihib G
 +
| rowspan="6"| GeoSafe
 +
| rowspan="6"| Acid Inhibitor
 +
| Formaldehyde
 +
| 50-00-0
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000418
 +
| style="text-align: right;" | 3.406
 +
|-
 +
| Thiourea
 +
| 62-56-6
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000418
 +
| style="text-align: right;" | 3.406
 +
|-
 +
| Ethoxylated alcohol
 +
| 68002-97-1
 +
| style="text-align: right;" | 35
 +
| style="text-align: right;" | 0.00014616
 +
| style="text-align: right;" | 119.196
 +
|-
 +
| Acetophenone
 +
| 98-86-2
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000418
 +
| style="text-align: right;" | 3.406
 +
|-
 +
| Short Chained Glycol Ether
 +
| 112-34-5
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00025056
 +
| style="text-align: right;" | 204.336
 +
|-
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00002088
 +
| style="text-align: right;" | 17.028
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| Slurry Gel, WGA-7 SLR
 +
| rowspan="4"| PolyFrac Plus
 +
| rowspan="4"| Gel
 +
| Surfactant
 +
| 154518-36-2
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.000376102
 +
| style="text-align: right;" | 306.716
 +
|-
 +
| Guar Gum
 +
| 9000-30-0
 +
| style="text-align: right;" | 45
 +
| style="text-align: right;" | 0.00338491
 +
| style="text-align: right;" | 2760.45
 +
|-
 +
| Clay
 +
| 14808-60-7
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.000376102
 +
| style="text-align: right;" | 306.716
 +
|-
 +
| Petroleum Distillate
 +
| 64742-47-8
 +
| style="text-align: right;" | 45
 +
| style="text-align: right;" | 0.00338491
 +
| style="text-align: right;" | 2760.45
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"| Rex Energy
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 86.3174
 +
| style="text-align: right;" | 70,393,100.0
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| ECM FR Pro 200
 +
| rowspan="2"| ECM Supply
 +
| rowspan="2"| Friction Reducer
 +
| Petroleum Distillate Hydrotreated Light
 +
| 64742-47-8
 +
| style="text-align: right;" | 25
 +
| style="text-align: right;" | 0.0184187
 +
| style="text-align: right;" | 15020.7
 +
|-
 +
| Other - (non-hazardous)
 +
| NA
 +
| style="text-align: right;" | 75
 +
| style="text-align: right;" | 0.055256
 +
| style="text-align: right;" | 45062.1
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| TEA Breaker Activater
 +
| rowspan="2"| Sagar Enterprise
 +
| rowspan="2"| Gel Breaker
 +
| Triethanolamine
 +
| 102-71-6
 +
| style="text-align: right;" | 72.5
 +
| style="text-align: right;" | 0.00105058
 +
| style="text-align: right;" | 856.764
 +
|-
 +
| Diethanolamine
 +
| 111-42-2
 +
| style="text-align: right;" | 13
 +
| style="text-align: right;" | 0.00018838
 +
| style="text-align: right;" | 153.627
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Chlorine Dioxide
 +
| rowspan="1"| Baker Hughes
 +
| rowspan="1"| Biocide
 +
| Chlorine Dioxide
 +
| 10049-04-4
 +
| style="text-align: right;" | 0.3
 +
| style="text-align: right;" | 0.001545
 +
| style="text-align: right;" | 1086.81
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
| 2015-12-05
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 6671 Bbl
 +
| style="text-align: right;" | 0
 +
| [[Universal Well Services Inc.]]
 +
| STAGE 29/29
 +
60 SHOTS
 +
|-
 +
| 2015-11-11
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 2934 Bbl
 +
| style="text-align: right;" | 0
 +
| [[Universal Well Services Inc.]]
 +
| STAGE 1/29
 +
60 STAGES
 +
STAGES 2-28
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2016
 +
| [[R E GAS DEVELOPMENT LLC]]
 +
| style="text-align: right;" | 355896
 +
| style="text-align: right;" | 30004
 +
| style="text-align: right;" | 302
 +
|-
 +
| 2017
 +
| [[R E GAS DEVELOPMENT LLC]]
 +
| style="text-align: right;" | 270995
 +
| style="text-align: right;" | 14146
 +
| style="text-align: right;" | 349
 +
|-
 +
| 2018
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| style="text-align: right;" | 127286
 +
| style="text-align: right;" | 23760
 +
| style="text-align: right;" | 263
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| style="text-align: right;" | 33883
 +
| style="text-align: right;" | 1771
 +
| style="text-align: right;" | 74
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2016
 +
| [[R E GAS DEVELOPMENT LLC]]
 +
| Brine
 +
| style="text-align: right;" | 22645
 +
| style="text-align: right;" | 302
 +
|-
 +
| 2017
 +
| [[R E GAS DEVELOPMENT LLC]]
 +
| Brine
 +
| style="text-align: right;" | 7417
 +
| style="text-align: right;" | 349
 +
|-
 +
| 2018
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Brine
 +
| style="text-align: right;" | 9339
 +
| style="text-align: right;" | 263
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Brine
 +
| style="text-align: right;" | 1536
 +
| style="text-align: right;" | 74
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1052060273
 +
| 2015-2-24 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 +
| 0091633396
 +
| 2015-02-18
 +
| Casing String Witnessed
 +
| No Violations
 +
| I was on the Kiko # 3 - H location to witness the placement and cementing of the 13.375 surface casing. Sidewinder Drilling Rig #63 drilled a 17.5 borehole to 1056 KB. The surface hole was finished on freshwater fluid due to the influx of water at 744 KB. Kerzey casing crew placed 25 joints of 13.375, 54.5 lbs./ft., J-55, ST&C casing to 1020KB. Casing hardware included a float shoe, a float collar and five bow spring centralizers. Universal Well Services ( UWS ) established circulation with 28 barrels of water followed by a 50 barrels gelled spacer and 5 barrels of water. UWS mixed and circulated a 174 barrels cement slurry ( Type 1, 3% CaCl, 0.25 lbs./sk. celloflake ) and displaced it back to surface. Displacement was achieved using a top plug and 149 barrels of water. Cement returns observe numbered 25 barrels. After the plug was bumped to 1000 psi. and held for five minutes without any decline the pressure was released. .5 barrel of flow back occurred and stopped. All floats held. A walk around tour reviewing the solids handling area, SOBM tanks, mud pumps and cellar did not reveal any violations.
 +
|-
 +
| 1052060273
 +
| 2015-02-24
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I inspected the drilling activities at the Kiko # 3-H on 2/24/2015. Sidewinder Drilling Rig # 63 was mist drilling a 8,75 borehole at 5096 KB. This is the third ( 3) and last scheduled hole on this pad. A walking tour inspection looked at solids control, SOBM tanks, air compressors, boosters and cellar. No violations were identified during this inspection.
 +
|-
 +
| 1151360913
 +
| 2018-06-27
 +
| Production Wells
 +
| No Violations
 +
| I conducted a status check of the well and production pad.  The pad is equipped with three producing wells (permit numbers 22634, 22635, & 22637).  This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped with a pressure-relief valve and a pressure gauge which displayed a reading of zero psi.  Proper identification was posted.  The tanks and production equipment were contained inside a steel lined steel dike.  Less than an inch of standing water was present in areas inside the tank battery.  The access road was in good condition.  Erosional controls were in place and appeared functioning.
 +
Equipment on the pad consisted of the following:
 +
Nine 400 bbl production tanks; six labelled as containing condensate and three as containing produced water
 +
Three gas processing units with vertical separators
 +
Two combustor units
 +
Three vapor recovery units
 +
One oil stabilization unit and tower
 +
|-
 +
| 1354758045
 +
| 2018-04-06
 +
| Production Wells
 +
| No Violations
 +
| I performed a status check on the above location. At the time of my inspection there was a rig on location swabbing the 2-3/8 tubing. All wells were in production while this operation was in progress. ID signs are posted. There was no noted violations at this time.
 +
|-
 +
| 1416320096
 +
| 2014-11-13
 +
| Casing String Witnessed
 +
| No Violations
 +
| I was on the Kiko # 3 - H location to witness the placement and cementing of the 20 conductor casing. H A D Inc. drilled a 22.25 borehole to 120 GL with an Air Rotary drilling rig. H A D Inc. placed 116 ( 6 joints ) of 20, 88 lbs. / foot, welded joint casing into the borehole.The conductor casing had circulation windows cut into the casing 5 ( @ 111 ) from the bottom of the casing for the placement of the cement slurry. Universal Well Services ( UWS ) connected to the casing and established circulation with 5 barrels of fresh water. Mix water temperature was 38 degrees and pH was 6. UWS mixed and circulated the cement slurry back to surface. The cement slurry consisted of 100 sacks of Type 1 with 3% CaCl2 ( blended ).I observed 4 barrels of cement slurry returned back to surface. Cement fell approximately 5 and will be topped off, if required, when the cellar is constructed. No violations were identified during this inspection.
 +
|-
 +
| 1934919025
 +
| 2015-03-08
 +
| Casing String Witnessed
 +
| No Violations
 +
| I was on the Kiko # 3H location to witness the latter part of the cementing of the cementing of the 5.5 production casing. Kerzey Casing Service ran 302 joints of 5.5, 20 lb./ft casing to 12,376 KB.  Sidewinder Drilling Rig # 63 circulated the casing and hole while a replacement pump truck was delivered. Universal pumped 50 barrels of a Barite weighted spacer followed by five (5) barrels of water. A 50 barrel spacer of Bond Rite was followed by ten (10) barrels of water. A bottom plug was dropped and chased by 305 barrels of lead cement. A tail cement slurry ( 341 barrels ) was pumped and displaced with a top plug. At 190 barrels of the displacement circulation was lost Universal continued to pump the calculated displacement volume. Circulation was re-established, but with a reduced flow ( trickle ). The top plug was landed and bumped to 2300 psi ( 500 psi over landing pressure of 1800 psi ). After holding the pressure for five (5) minutes without any decline Universal bled off the pressure with 3.5 barrels flowing back and stopping. All floats held. A CBL/ Temperature Log was performed by Blue Dot. The temperature log indicated a cement top at  approximately 2202 ~ 2220. True vertical depth of the Point Pleasant Formation was 7513 KB. , thus giving a vertical separation of approximately 5293 to 5311. After conferring with Tom Hill ( DOGRM Regional Supervisor ) R E Gas Development was allowed to proceed without any remedial measures at this time. The annular space between the 9.625 and 5.5 casings must be monitored closely to determine if any remedial measures shall be required in the future prior to stimulation of the Kiko # 3 - H well.
 +
|-
 +
| 2109400360
 +
| 2015-02-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I was on the Kiko # 3 -H location to inspect the drilling operations being conducted. Sidewinder Drilling Rig # 63 drilled a 17.5 borehole to 762 KB. A large water influx @ 744 KB prevented the hole being drilled on air to total depth. Sidewinder Rig #63 was removing the hammer bit and switching over to a tricone drilling bit to finish the surface section on a fluid ( fresh water ) drilling system. A walk around tour of the solids control, air packages and mud tanks did not reveal any violations during this inspection.
 +
|-
 +
| 877149484
 +
| 2020-4-2 0:00:0
 +
| PL
 +
| No Violations
 +
| 0.50
 
|-
 
|-
 
| 91633396
 
| 91633396
| 2015-02-18
+
| 2015-2-18 0:00:
|
+
| CS
| I was on the Kiko # 3 - H location to witness the placement and cementing of the 13.375 surface casing. Sidewinder Drilling Rig #63 drilled a 17.5 borehole to 1056' KB. The surface hole was finished on freshwater fluid due to the influx of water at 744' KB. Kerzey casing crew placed 25 joints of 13.375, 54.5 lbs./ft., J-55, ST&C casing to 1020'KB. Casing hardware included a float shoe, a float collar and five bow spring centralizers. Universal Well Services ( UWS ) established circulation with 28 barrels of water followed by a 50 barrels gelled spacer and 5 barrels of water. UWS mixed and circulated a 174 barrels cement slurry ( Type 1, 3% CaCl, 0.25 lbs./sk. celloflake ) and displaced it back to surface. Displacement was achieved using a top plug and 149 barrels of water. Cement returns observe numbered 25 barrels. After the plug was bumped to 1000 psi. and held for five minutes without any decline the pressure was released. .5 barrel of flow back occurred and stopped. All floats held. A walk around tour reviewing the solids handling area, SOBM tanks, mud pumps and cellar did not reveal any violations.
+
| No Violations
|  
 
|  
 
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 23:15, 12 January 2021

Well Details

Well ID: 34-019-22635
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Washington Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-001172
Farm/Lease Name: KIKO UNIT
License Status: Producing
License Date: 2014-11-07
Spud Date: 2014-11-13
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2015-03-06
Well Total Depth: 12754.00 ft
Configuration: Horizontal
Latitude: 40.640000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-11-07 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/7/2014, Expired Date:11/6/2016 12:00:00 PM, Drilling unit acres:554.86, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-03-06
Correction to Well 2015-04-24 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Correction to Well 2016-03-18 change in takepoint per as drilled plat ALE
Completion Report Received 2016-06-15
Construction Permit Expires 2016-11-06
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Record Last Modified 2018-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-02-10 8371 12722 0
8371 12722 0
8371 12722 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/18/2015 12/05/2015 7546 8,435,360.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (7.5%) PVS Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0696661 56813.7
Water 7732-18-5 92.5 0.859216 700703
Scaletrol 767W Baker Hughes Scale Inhibitor Methanol 67-56-1 30 0.006066 4266.12
Ammonium Chloride 12125-02-9 1 0.000202 142.204
Organophosphonate 129828-36-0 15 0.003033 2133.06
Water 7732-18-5 75 0.015165 10665.3
Sand (Proppant) Sargent/Momentive/Preffered Proppant Silica Substrate 14808-60-7 100 12.6705 10,333,000.0
AP Breaker Sagar Enterprise Gel Breaker Ammonium Persulfate 7727-54-0 100 0.00008829 72
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Formaldehyde 50-00-0 1 0.00000418 3.406
Thiourea 62-56-6 1 0.00000418 3.406
Ethoxylated alcohol 68002-97-1 35 0.00014616 119.196
Acetophenone 98-86-2 1 0.00000418 3.406
Short Chained Glycol Ether 112-34-5 60 0.00025056 204.336
Methanol 67-56-1 5 0.00002088 17.028
Slurry Gel, WGA-7 SLR PolyFrac Plus Gel Surfactant 154518-36-2 5 0.000376102 306.716
Guar Gum 9000-30-0 45 0.00338491 2760.45
Clay 14808-60-7 5 0.000376102 306.716
Petroleum Distillate 64742-47-8 45 0.00338491 2760.45
Water Rex Energy Carrier/Base Fluid Water 7732-18-5 100 86.3174 70,393,100.0
ECM FR Pro 200 ECM Supply Friction Reducer Petroleum Distillate Hydrotreated Light 64742-47-8 25 0.0184187 15020.7
Other - (non-hazardous) NA 75 0.055256 45062.1
TEA Breaker Activater Sagar Enterprise Gel Breaker Triethanolamine 102-71-6 72.5 0.00105058 856.764
Diethanolamine 111-42-2 13 0.00018838 153.627
Chlorine Dioxide Baker Hughes Biocide Chlorine Dioxide 10049-04-4 0.3 0.001545 1086.81

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-12-05 H2O 0 6671 Bbl 0 Universal Well Services Inc. STAGE 29/29

60 SHOTS

2015-11-11 H2O 0 2934 Bbl 0 Universal Well Services Inc. STAGE 1/29

60 STAGES STAGES 2-28

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 R E GAS DEVELOPMENT LLC 355896 30004 302
2017 R E GAS DEVELOPMENT LLC 270995 14146 349
2018 PENNENERGY RESOURCES LLC 127286 23760 263
2019 PENNENERGY RESOURCES LLC 33883 1771 74

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 R E GAS DEVELOPMENT LLC Brine 22645 302
2017 R E GAS DEVELOPMENT LLC Brine 7417 349
2018 PENNENERGY RESOURCES LLC Brine 9339 263
2019 PENNENERGY RESOURCES LLC Brine 1536 74

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1052060273 2015-2-24 0:00: DD No Violations
0091633396 2015-02-18 Casing String Witnessed No Violations I was on the Kiko # 3 - H location to witness the placement and cementing of the 13.375 surface casing. Sidewinder Drilling Rig #63 drilled a 17.5 borehole to 1056 KB. The surface hole was finished on freshwater fluid due to the influx of water at 744 KB. Kerzey casing crew placed 25 joints of 13.375, 54.5 lbs./ft., J-55, ST&C casing to 1020KB. Casing hardware included a float shoe, a float collar and five bow spring centralizers. Universal Well Services ( UWS ) established circulation with 28 barrels of water followed by a 50 barrels gelled spacer and 5 barrels of water. UWS mixed and circulated a 174 barrels cement slurry ( Type 1, 3% CaCl, 0.25 lbs./sk. celloflake ) and displaced it back to surface. Displacement was achieved using a top plug and 149 barrels of water. Cement returns observe numbered 25 barrels. After the plug was bumped to 1000 psi. and held for five minutes without any decline the pressure was released. .5 barrel of flow back occurred and stopped. All floats held. A walk around tour reviewing the solids handling area, SOBM tanks, mud pumps and cellar did not reveal any violations.
1052060273 2015-02-24 Drill / Deepen / Reopen No Violations I inspected the drilling activities at the Kiko # 3-H on 2/24/2015. Sidewinder Drilling Rig # 63 was mist drilling a 8,75 borehole at 5096 KB. This is the third ( 3) and last scheduled hole on this pad. A walking tour inspection looked at solids control, SOBM tanks, air compressors, boosters and cellar. No violations were identified during this inspection.
1151360913 2018-06-27 Production Wells No Violations I conducted a status check of the well and production pad. The pad is equipped with three producing wells (permit numbers 22634, 22635, & 22637). This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped with a pressure-relief valve and a pressure gauge which displayed a reading of zero psi. Proper identification was posted. The tanks and production equipment were contained inside a steel lined steel dike. Less than an inch of standing water was present in areas inside the tank battery. The access road was in good condition. Erosional controls were in place and appeared functioning.

Equipment on the pad consisted of the following: Nine 400 bbl production tanks; six labelled as containing condensate and three as containing produced water Three gas processing units with vertical separators Two combustor units Three vapor recovery units One oil stabilization unit and tower

1354758045 2018-04-06 Production Wells No Violations I performed a status check on the above location. At the time of my inspection there was a rig on location swabbing the 2-3/8 tubing. All wells were in production while this operation was in progress. ID signs are posted. There was no noted violations at this time.
1416320096 2014-11-13 Casing String Witnessed No Violations I was on the Kiko # 3 - H location to witness the placement and cementing of the 20 conductor casing. H A D Inc. drilled a 22.25 borehole to 120 GL with an Air Rotary drilling rig. H A D Inc. placed 116 ( 6 joints ) of 20, 88 lbs. / foot, welded joint casing into the borehole.The conductor casing had circulation windows cut into the casing 5 ( @ 111 ) from the bottom of the casing for the placement of the cement slurry. Universal Well Services ( UWS ) connected to the casing and established circulation with 5 barrels of fresh water. Mix water temperature was 38 degrees and pH was 6. UWS mixed and circulated the cement slurry back to surface. The cement slurry consisted of 100 sacks of Type 1 with 3% CaCl2 ( blended ).I observed 4 barrels of cement slurry returned back to surface. Cement fell approximately 5 and will be topped off, if required, when the cellar is constructed. No violations were identified during this inspection.
1934919025 2015-03-08 Casing String Witnessed No Violations I was on the Kiko # 3H location to witness the latter part of the cementing of the cementing of the 5.5 production casing. Kerzey Casing Service ran 302 joints of 5.5, 20 lb./ft casing to 12,376 KB. Sidewinder Drilling Rig # 63 circulated the casing and hole while a replacement pump truck was delivered. Universal pumped 50 barrels of a Barite weighted spacer followed by five (5) barrels of water. A 50 barrel spacer of Bond Rite was followed by ten (10) barrels of water. A bottom plug was dropped and chased by 305 barrels of lead cement. A tail cement slurry ( 341 barrels ) was pumped and displaced with a top plug. At 190 barrels of the displacement circulation was lost Universal continued to pump the calculated displacement volume. Circulation was re-established, but with a reduced flow ( trickle ). The top plug was landed and bumped to 2300 psi ( 500 psi over landing pressure of 1800 psi ). After holding the pressure for five (5) minutes without any decline Universal bled off the pressure with 3.5 barrels flowing back and stopping. All floats held. A CBL/ Temperature Log was performed by Blue Dot. The temperature log indicated a cement top at approximately 2202 ~ 2220. True vertical depth of the Point Pleasant Formation was 7513 KB. , thus giving a vertical separation of approximately 5293 to 5311. After conferring with Tom Hill ( DOGRM Regional Supervisor ) R E Gas Development was allowed to proceed without any remedial measures at this time. The annular space between the 9.625 and 5.5 casings must be monitored closely to determine if any remedial measures shall be required in the future prior to stimulation of the Kiko # 3 - H well.
2109400360 2015-02-17 Drill / Deepen / Reopen No Violations I was on the Kiko # 3 -H location to inspect the drilling operations being conducted. Sidewinder Drilling Rig # 63 drilled a 17.5 borehole to 762 KB. A large water influx @ 744 KB prevented the hole being drilled on air to total depth. Sidewinder Rig #63 was removing the hammer bit and switching over to a tricone drilling bit to finish the surface section on a fluid ( fresh water ) drilling system. A walk around tour of the solids control, air packages and mud tanks did not reveal any violations during this inspection.
877149484 2020-4-2 0:00:0 PL No Violations 0.50
91633396 2015-2-18 0:00: CS No Violations

For data sources see[10]

References