X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0444210401000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0444210401000
 
| Well ID: 0444210401000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.759464, -112.984084 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.759464, -112.984084 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/01-04-044-21W4/0
 
| Location: 00/01-04-044-21W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/01-04-044-21 W4/00
 
| Location Alias 2: 00/01-04-044-21 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 044
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 21
 +
|-
 +
| Section: 04
 
|-
 
|-
 
| County/Municipality: [[Camrose County,_Alberta|Camrose County]]
 
| County/Municipality: [[Camrose County,_Alberta|Camrose County]]
Line 17: Line 27:
 
| Well Name: RIFE FERINTOSH 1-4-44-21
 
| Well Name: RIFE FERINTOSH 1-4-44-21
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Rife Resources Ltd.]]
 
|-
 
|-
 
| License Number: 0140706
 
| License Number: 0140706
Line 29: Line 39:
 
| Final Drill Date: 1989-09-09
 
| Final Drill Date: 1989-09-09
 
|-
 
|-
| Well Total Depth: 1390 m
+
| Well Total Depth: 1390.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.759464
 
| Surface Hole Latitude: 52.759464
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1989-08-22
 +
| Obtained License
 +
|-
 +
| 1989-09-03
 +
| Lost Circulation Occurred
 +
|-
 +
| 1989-09-04
 +
| Lost Circulation Occurred
 +
|-
 +
| 1989-09-04
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1989-09-09
 +
| Finished Drilling
 +
|-
 +
| 1989-09-09
 +
| Well Log Performed
 +
|-
 +
| 1989-09-10
 +
| Production Casing Operation Performed
 +
|-
 +
| 1989-09-10
 +
| Rig Released
 +
|-
 +
| 1989-10-03
 +
| Well Log Performed
 +
|-
 +
| 1989-10-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1989-10-04
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1989-11-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1989-11-10
 +
| Well Log Performed
 +
|-
 +
| 1992-09-02
 +
| Well Log Performed
 +
|-
 +
| 1992-09-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-09-03
 +
| Well Log Performed
 +
|-
 +
| 1992-09-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-09-20
 +
| Well Log Performed
 +
|-
 +
| 1992-09-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1992-09-22
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1992-09-25
 +
| Well Log Performed
 +
|-
 +
| 1992-09-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-10-03
 +
| Well Log Performed
 +
|-
 +
| 1992-10-10
 +
| Well Log Performed
 +
|-
 +
| 1992-10-14
 +
| Well Log Performed
 +
|-
 +
| 1992-10-18
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1992-10-18
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1992-10-21
 +
| Well Log Performed
 +
|-
 +
| 1992-10-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-10-22
 +
| Well Log Performed
 +
|-
 +
| 1992-10-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1999-01-19
 +
| Well Log Performed
 +
|-
 +
| 1999-01-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1999-01-20
 +
| Plug Back Performed
 +
|-
 +
| 1999-02-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-02-20
 +
| Well Log Performed
 +
|-
 +
| 1999-02-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-02-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-02-23
 +
| Well Log Performed
 +
|-
 +
| 1999-02-24
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1999-03-02
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-03-02
 +
| Well Abandoned
 +
|-
 +
| 1999-03-02
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 225:
 
| 1989-10-04
 
| 1989-10-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1329.5
+
| style="text-align: right;" | 1329.50
| style="text-align: right;" | 1330.5
+
| style="text-align: right;" | 1330.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 1989-11-10
 
| Perforation
 
| style="text-align: right;" | 1305.2
 
| style="text-align: right;" | 1308.2
 
| style="text-align: right;" | 12
 
|-
 
| 1992-09-03
 
| Perforation
 
| style="text-align: right;" | 1311
 
| style="text-align: right;" | 1312
 
| style="text-align: right;" | 14
 
|-
 
| 1992-09-03
 
| Perforation
 
| style="text-align: right;" | 1313
 
| style="text-align: right;" | 1313.5
 
| style="text-align: right;" | 14
 
|-
 
| 1992-09-20
 
| Perforation
 
| style="text-align: right;" | 1316
 
| style="text-align: right;" | 1317
 
| style="text-align: right;" | 14
 
|-
 
| 1992-09-22
 
| Acid Treatment
 
| style="text-align: right;" | 1316
 
| style="text-align: right;" | 1317
 
| style="text-align: right;" | 0
 
|-
 
| 1992-09-22
 
| Cement Squeeze
 
| style="text-align: right;" | 1305.2
 
| style="text-align: right;" | 1317
 
| style="text-align: right;" | 0
 
|-
 
| 1992-09-26
 
| Perforation
 
| style="text-align: right;" | 1311
 
| style="text-align: right;" | 1312
 
| style="text-align: right;" | 14
 
|-
 
| 1992-09-26
 
| Perforation
 
| style="text-align: right;" | 1313
 
| style="text-align: right;" | 1313.5
 
| style="text-align: right;" | 14
 
 
|-
 
|-
 
| 1992-10-18
 
| 1992-10-18
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1313.5
+
| style="text-align: right;" | 1313.50
| style="text-align: right;" | 1319.8
+
| style="text-align: right;" | 1319.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-10-22
 
| 1992-10-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1305.2
+
| style="text-align: right;" | 1305.20
| style="text-align: right;" | 1308.2
+
| style="text-align: right;" | 1308.20
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1992-10-23
 
| 1992-10-23
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1305.2
+
| style="text-align: right;" | 1305.20
| style="text-align: right;" | 1308.2
+
| style="text-align: right;" | 1308.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-01-20
 
| 1999-01-20
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1305.2
+
| style="text-align: right;" | 1305.20
| style="text-align: right;" | 1308.2
+
| style="text-align: right;" | 1308.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-02-20
 
| 1999-02-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 437
+
| style="text-align: right;" | 437.00
| style="text-align: right;" | 438
+
| style="text-align: right;" | 438.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1999-02-20
 
| 1999-02-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 467
+
| style="text-align: right;" | 467.00
| style="text-align: right;" | 468
+
| style="text-align: right;" | 468.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1999-02-23
 
| 1999-02-23
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 456
+
| style="text-align: right;" | 456.00
| style="text-align: right;" | 464
+
| style="text-align: right;" | 464.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-02-23
 
| 1999-02-23
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 426
+
| style="text-align: right;" | 426.00
| style="text-align: right;" | 434
+
| style="text-align: right;" | 434.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-02-23
 
| 1999-02-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 256
+
| style="text-align: right;" | 256.00
| style="text-align: right;" | 257
+
| style="text-align: right;" | 257.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1999-02-23
 
| 1999-02-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 290
+
| style="text-align: right;" | 290.00
| style="text-align: right;" | 291
+
| style="text-align: right;" | 291.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1989-11-10
 +
| Perforation
 +
| style="text-align: right;" | 1305.20
 +
| style="text-align: right;" | 1308.20
 +
| style="text-align: right;" | 12
 
|-
 
|-
 
| 1999-02-24
 
| 1999-02-24
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 290
+
| style="text-align: right;" | 290.00
| style="text-align: right;" | 291
+
| style="text-align: right;" | 291.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-03-02
 
| 1999-03-02
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 243
+
| style="text-align: right;" | 243.00
| style="text-align: right;" | 251
+
| style="text-align: right;" | 251.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1992-09-03
 +
| Perforation
 +
| style="text-align: right;" | 1311.00
 +
| style="text-align: right;" | 1312.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1992-09-03
 +
| Perforation
 +
| style="text-align: right;" | 1313.00
 +
| style="text-align: right;" | 1313.50
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1992-09-20
 +
| Perforation
 +
| style="text-align: right;" | 1316.00
 +
| style="text-align: right;" | 1317.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1992-09-22
 +
| Acid Treatment
 +
| style="text-align: right;" | 1316.00
 +
| style="text-align: right;" | 1317.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1992-09-22
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1305.20
 +
| style="text-align: right;" | 1317.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1992-09-26
 +
| Perforation
 +
| style="text-align: right;" | 1311.00
 +
| style="text-align: right;" | 1312.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1992-09-26
 +
| Perforation
 +
| style="text-align: right;" | 1313.00
 +
| style="text-align: right;" | 1313.50
 +
| style="text-align: right;" | 14
 
|-
 
|-
 
|}
 
|}
Line 202: Line 353:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 256: Line 421:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 17:54, 17 January 2021

Well Details

Well ID: 0444210401000
Loading map...
Location: 00/01-04-044-21W4/0
Location Alias: 00/01-04-44-21 W4M
Location Alias 2: 00/01-04-044-21 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 21
Section: 04
County/Municipality: Camrose County
Well Name: RIFE FERINTOSH 1-4-44-21
Operator Name: Rife Resources Ltd.
License Number: 0140706
License Date: 1989-08-22
License Status: Abandoned
Spud Date: 1989-09-02
Final Drill Date: 1989-09-09
Well Total Depth: 1390.00 m
Surface Hole Latitude: 52.759464
Surface Hole Longitude: -112.984084

For data sources see[1][2]

Well History

Date Event
1989-08-22 Obtained License
1989-09-03 Lost Circulation Occurred
1989-09-04 Lost Circulation Occurred
1989-09-04 Surface Casing Operation Performed
1989-09-09 Finished Drilling
1989-09-09 Well Log Performed
1989-09-10 Production Casing Operation Performed
1989-09-10 Rig Released
1989-10-03 Well Log Performed
1989-10-04 Perforation Treatment Performed - Jet Perforation
1989-10-04 Well Mode changed to Drilled and Cased
1989-11-10 Perforation Treatment Performed - Jet Perforation
1989-11-10 Well Log Performed
1992-09-02 Well Log Performed
1992-09-03 Perforation Treatment Performed - Jet Perforation
1992-09-03 Well Log Performed
1992-09-20 Perforation Treatment Performed - Jet Perforation
1992-09-20 Well Log Performed
1992-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-22 Perforation Treatment Performed - Cement Squeeze
1992-09-25 Well Log Performed
1992-09-26 Perforation Treatment Performed - Jet Perforation
1992-10-03 Well Log Performed
1992-10-10 Well Log Performed
1992-10-14 Well Log Performed
1992-10-18 Perforation Treatment Performed - Cement Plug
1992-10-18 Well Mode changed to Abandoned Zone
1992-10-21 Well Log Performed
1992-10-22 Perforation Treatment Performed - Jet Perforation
1992-10-22 Well Log Performed
1992-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-19 Well Log Performed
1999-01-20 Perforation Treatment Performed - Cement Squeeze
1999-01-20 Plug Back Performed
1999-02-20 Perforation Treatment Performed - Jet Perforation
1999-02-20 Well Log Performed
1999-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-23 Perforation Treatment Performed - Jet Perforation
1999-02-23 Well Log Performed
1999-02-24 Perforation Treatment Performed - Remedial Casing
1999-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-02 Well Abandoned
1999-03-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-04 Perforation 1329.50 1330.50 13
1992-10-18 Cement Plug 1313.50 1319.80 0
1992-10-22 Perforation 1305.20 1308.20 14
1992-10-23 Acid Treatment 1305.20 1308.20 0
1999-01-20 Cement Squeeze 1305.20 1308.20 0
1999-02-20 Perforation 437.00 438.00 13
1999-02-20 Perforation 467.00 468.00 13
1999-02-23 Packing Device Capped w/Cement 456.00 464.00 0
1999-02-23 Packing Device Capped w/Cement 426.00 434.00 0
1999-02-23 Perforation 256.00 257.00 13
1999-02-23 Perforation 290.00 291.00 13
1989-11-10 Perforation 1305.20 1308.20 12
1999-02-24 Remedial Casing Cementing 290.00 291.00 0
1999-03-02 Packing Device Capped w/Cement 243.00 251.00 0
1992-09-03 Perforation 1311.00 1312.00 14
1992-09-03 Perforation 1313.00 1313.50 14
1992-09-20 Perforation 1316.00 1317.00 14
1992-09-22 Acid Treatment 1316.00 1317.00 0
1992-09-22 Cement Squeeze 1305.20 1317.00 0
1992-09-26 Perforation 1311.00 1312.00 14
1992-09-26 Perforation 1313.00 1313.50 14

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-09-03 Lost Circulation 121.00 121.00
1989-09-04 Lost Circulation 218.00 255.00

For data sources see[5]

References