X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0534140910003"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0534140910003
 
| Well ID: 0534140910003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.564713, -111.99983 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.564713, -111.999830 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-09-053-14W4/3
 
| Location: 00/10-09-053-14W4/3
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/10-09-053-14 W4/03
 
| Location Alias 2: 00/10-09-053-14 W4/03
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 053
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 14
 +
|-
 +
| Section: 09
 
|-
 
|-
 
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
 
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
Line 17: Line 27:
 
| Well Name: OMERS ENERGY WARWICK 10-9-53-14
 
| Well Name: OMERS ENERGY WARWICK 10-9-53-14
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[AlphaBow Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0115254
 
| License Number: 0115254
Line 29: Line 39:
 
| Final Drill Date: 1985-06-21
 
| Final Drill Date: 1985-06-21
 
|-
 
|-
| Well Total Depth: 750 m
+
| Well Total Depth: 750.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.564713
 
| Surface Hole Latitude: 53.564713
 
|-
 
|-
| Surface Hole Longitude: -111.99983
+
| Surface Hole Longitude: -111.999830
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1985-06-11
 +
| Obtained License
 +
|-
 +
| 1985-06-19
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-06-21
 +
| Finished Drilling
 +
|-
 +
| 1985-06-21
 +
| Well Log Performed
 +
|-
 +
| 1985-06-23
 +
| Production Casing Operation Performed
 +
|-
 +
| 1985-06-24
 +
| Rig Released
 +
|-
 +
| 1985-07-04
 +
| Well Log Performed
 +
|-
 +
| 1985-07-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1985-07-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-07-06
 +
| Well Log Performed
 +
|-
 +
| 1985-07-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-07-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-07-07
 +
| Plug Back Performed
 +
|-
 +
| 1985-07-07
 +
| Well Log Performed
 +
|-
 +
| 1985-07-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-01-13
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1986-01-14
 +
| Well Log Performed
 +
|-
 +
| 1986-01-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-12-14
 +
| Well Log Performed
 +
|-
 +
| 1987-12-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-02-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1988-02-23
 +
| Well Log Performed
 +
|-
 +
| 1988-02-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-02-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1988-02-25
 +
| Well Began Production
 +
|-
 +
| 1988-02-25
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1988-02-25
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1994-08-10
 +
| Well Log Performed
 +
|-
 +
| 1994-08-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-08-12
 +
| Well Structure changed to Commingled
 +
|-
 +
| 2009-03-04
 +
| Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
 +
|-
 +
| 2009-03-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-03-05
 +
| Plug Back Performed
 +
|-
 +
| 2009-03-05
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2009-05-01
 +
| Well Abandoned
 +
|-
 +
| 2009-05-01
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 204:
 
| 1985-07-06
 
| 1985-07-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 700.5
+
| style="text-align: right;" | 700.50
| style="text-align: right;" | 701.5
+
| style="text-align: right;" | 701.50
| style="text-align: right;" | 7
 
|-
 
| 1985-07-06
 
| Acid Treatment
 
| style="text-align: right;" | 700.5
 
| style="text-align: right;" | 701.5
 
| style="text-align: right;" | 0
 
|-
 
| 1985-07-07
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 698
 
| style="text-align: right;" | 699
 
| style="text-align: right;" | 0
 
|-
 
| 1985-07-07
 
| Perforation
 
| style="text-align: right;" | 692
 
| style="text-align: right;" | 694
 
| style="text-align: right;" | 7
 
|-
 
| 1985-07-07
 
| Perforation
 
| style="text-align: right;" | 694.5
 
| style="text-align: right;" | 695.5
 
| style="text-align: right;" | 7
 
|-
 
| 1985-07-08
 
| Perforation
 
| style="text-align: right;" | 591
 
| style="text-align: right;" | 592.5
 
| style="text-align: right;" | 7
 
|-
 
| 1986-01-13
 
| Cement Squeeze
 
| style="text-align: right;" | 692
 
| style="text-align: right;" | 695.5
 
| style="text-align: right;" | 0
 
|-
 
| 1986-01-15
 
| Perforation
 
| style="text-align: right;" | 691
 
| style="text-align: right;" | 693
 
| style="text-align: right;" | 7
 
|-
 
| 1987-12-15
 
| Perforation
 
| style="text-align: right;" | 594
 
| style="text-align: right;" | 595
 
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1988-02-21
 
| 1988-02-21
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 591
+
| style="text-align: right;" | 591.00
| style="text-align: right;" | 595
+
| style="text-align: right;" | 595.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988-02-24
 
| 1988-02-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 545.5
+
| style="text-align: right;" | 545.50
| style="text-align: right;" | 547
+
| style="text-align: right;" | 547.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1994-08-11
 
| 1994-08-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 632
+
| style="text-align: right;" | 632.00
| style="text-align: right;" | 633
+
| style="text-align: right;" | 633.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-08-11
 
| 1994-08-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 668
+
| style="text-align: right;" | 668.00
| style="text-align: right;" | 669
+
| style="text-align: right;" | 669.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-08-11
 
| 1994-08-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 672
+
| style="text-align: right;" | 672.00
| style="text-align: right;" | 673
+
| style="text-align: right;" | 673.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-08-11
 
| 1994-08-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 679
+
| style="text-align: right;" | 679.00
| style="text-align: right;" | 680
+
| style="text-align: right;" | 680.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-08-11
 
| 1994-08-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 683
+
| style="text-align: right;" | 683.00
| style="text-align: right;" | 684
+
| style="text-align: right;" | 684.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-04
 
| 2009-03-04
 
| Packing Dev Cpd w/Res-Gyp Cem
 
| Packing Dev Cpd w/Res-Gyp Cem
| style="text-align: right;" | 674
+
| style="text-align: right;" | 674.00
| style="text-align: right;" | 677
+
| style="text-align: right;" | 677.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-03-04
 
| 2009-03-04
 
| Packing Dev Cpd w/Res-Gyp Cem
 
| Packing Dev Cpd w/Res-Gyp Cem
| style="text-align: right;" | 686
+
| style="text-align: right;" | 686.00
| style="text-align: right;" | 689
+
| style="text-align: right;" | 689.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-03-05
 
| 2009-03-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 649
+
| style="text-align: right;" | 649.00
| style="text-align: right;" | 657
+
| style="text-align: right;" | 657.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-07-06
 +
| Acid Treatment
 +
| style="text-align: right;" | 700.50
 +
| style="text-align: right;" | 701.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-03-05
 
| 2009-03-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 614
+
| style="text-align: right;" | 614.00
| style="text-align: right;" | 622
+
| style="text-align: right;" | 622.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-03-05
 
| 2009-03-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 577
+
| style="text-align: right;" | 577.00
| style="text-align: right;" | 585
+
| style="text-align: right;" | 585.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-03-05
 
| 2009-03-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 527
+
| style="text-align: right;" | 527.00
| style="text-align: right;" | 535
+
| style="text-align: right;" | 535.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-07-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 698.00
 +
| style="text-align: right;" | 699.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1985-07-07
 +
| Perforation
 +
| style="text-align: right;" | 692.00
 +
| style="text-align: right;" | 694.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1985-07-07
 +
| Perforation
 +
| style="text-align: right;" | 694.50
 +
| style="text-align: right;" | 695.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1985-07-08
 +
| Perforation
 +
| style="text-align: right;" | 591.00
 +
| style="text-align: right;" | 592.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1986-01-13
 +
| Cement Squeeze
 +
| style="text-align: right;" | 692.00
 +
| style="text-align: right;" | 695.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1986-01-15
 +
| Perforation
 +
| style="text-align: right;" | 691.00
 +
| style="text-align: right;" | 693.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1987-12-15
 +
| Perforation
 +
| style="text-align: right;" | 594.00
 +
| style="text-align: right;" | 595.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
|}
 
|}
Line 208: Line 338:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 241: Line 385:
 
| 1988
 
| 1988
 
| style="text-align: right;" | 7411
 
| style="text-align: right;" | 7411
| style="text-align: right;" | 4398.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1989
 
| 1989
 
| style="text-align: right;" | 8729
 
| style="text-align: right;" | 8729
| style="text-align: right;" | 4121.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 253: Line 397:
 
| 1990
 
| 1990
 
| style="text-align: right;" | 6083
 
| style="text-align: right;" | 6083
| style="text-align: right;" | 2113.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 259: Line 403:
 
| 1991
 
| 1991
 
| style="text-align: right;" | 3645
 
| style="text-align: right;" | 3645
| style="text-align: right;" | 1056.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1992
 
| 1992
 
| style="text-align: right;" | 1418
 
| style="text-align: right;" | 1418
| style="text-align: right;" | 442.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1993
 
| 1993
 
| style="text-align: right;" | 8515
 
| style="text-align: right;" | 8515
| style="text-align: right;" | 798.8
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 5.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1994
 
| 1994
 
| style="text-align: right;" | 4577
 
| style="text-align: right;" | 4577
| style="text-align: right;" | 284.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 12.4
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 285: Line 429:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 300: Line 444:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 17:54, 17 January 2021

Well Details

Well ID: 0534140910003
Loading map...
Location: 00/10-09-053-14W4/3
Location Alias: 00/10-09-53-14 W4M
Location Alias 2: 00/10-09-053-14 W4/03
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 14
Section: 09
County/Municipality: County of Minburn No. 27
Well Name: OMERS ENERGY WARWICK 10-9-53-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0115254
License Date: 1985-06-11
License Status: Abandoned
Spud Date: 1985-06-18
Final Drill Date: 1985-06-21
Well Total Depth: 750.00 m
Surface Hole Latitude: 53.564713
Surface Hole Longitude: -111.999830

For data sources see[1][2]

Well History

Date Event
1985-06-11 Obtained License
1985-06-19 Surface Casing Operation Performed
1985-06-21 Finished Drilling
1985-06-21 Well Log Performed
1985-06-23 Production Casing Operation Performed
1985-06-24 Rig Released
1985-07-04 Well Log Performed
1985-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-06 Perforation Treatment Performed - Jet Perforation
1985-07-06 Well Log Performed
1985-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-07 Perforation Treatment Performed - Jet Perforation
1985-07-07 Plug Back Performed
1985-07-07 Well Log Performed
1985-07-08 Perforation Treatment Performed - Jet Perforation
1986-01-13 Perforation Treatment Performed - Cement Squeeze
1986-01-14 Well Log Performed
1986-01-15 Perforation Treatment Performed - Jet Perforation
1987-12-14 Well Log Performed
1987-12-15 Perforation Treatment Performed - Jet Perforation
1988-02-21 Perforation Treatment Performed - Cement Squeeze
1988-02-23 Well Log Performed
1988-02-24 Perforation Treatment Performed - Jet Perforation
1988-02-24 Well Mode changed to Drilled and Cased
1988-02-25 Well Began Production
1988-02-25 Well Fluid changed to Gas
1988-02-25 Well Mode changed to Flowing
1994-08-10 Well Log Performed
1994-08-11 Perforation Treatment Performed - Jet Perforation
1994-08-12 Well Structure changed to Commingled
2009-03-04 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2009-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-05 Plug Back Performed
2009-03-05 Well Mode changed to Abandoned Zone
2009-05-01 Well Abandoned
2009-05-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-06 Perforation 700.50 701.50 7
1988-02-21 Cement Squeeze 591.00 595.00 0
1988-02-24 Perforation 545.50 547.00 7
1994-08-11 Perforation 632.00 633.00 13
1994-08-11 Perforation 668.00 669.00 13
1994-08-11 Perforation 672.00 673.00 13
1994-08-11 Perforation 679.00 680.00 13
1994-08-11 Perforation 683.00 684.00 13
2009-03-04 Packing Dev Cpd w/Res-Gyp Cem 674.00 677.00 0
2009-03-04 Packing Dev Cpd w/Res-Gyp Cem 686.00 689.00 0
2009-03-05 Packing Device Capped w/Cement 649.00 657.00 0
1985-07-06 Acid Treatment 700.50 701.50 0
2009-03-05 Packing Device Capped w/Cement 614.00 622.00 0
2009-03-05 Packing Device Capped w/Cement 577.00 585.00 0
2009-03-05 Packing Device Capped w/Cement 527.00 535.00 0
1985-07-07 Packing Device Capped w/Cement 698.00 699.00 0
1985-07-07 Perforation 692.00 694.00 7
1985-07-07 Perforation 694.50 695.50 7
1985-07-08 Perforation 591.00 592.50 7
1986-01-13 Cement Squeeze 692.00 695.50 0
1986-01-15 Perforation 691.00 693.00 7
1987-12-15 Perforation 594.00 595.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 7411 0.0 0.0 0.0
1989 8729 0.0 0.0 0.0
1990 6083 0.0 0.0 0.0
1991 3645 0.0 0.0 0.0
1992 1418 0.0 0.0 0.0
1993 8515 0.0 0.0 0.0
1994 4577 0.0 0.0 0.0

For data sources see[5]

References