If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 265: | Line 265: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0534142211002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.594289,"lon":-111.984431,"icon":""}]} |
Location: 00/11-22-053-14W4/2 | |
Location Alias: 00/11-22-53-14 W4M | |
Location Alias 2: 00/11-22-053-14 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 14 | |
Section: 22 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PINE CLIFF WARWICK 11-22-53-14 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0270666 | |
License Date: 2002-06-06 | |
License Status: Issued | |
Spud Date: 2002-06-11 | |
Final Drill Date: 2002-06-12 | |
Well Total Depth: 757.00 m | |
Surface Hole Latitude: 53.594289 | |
Surface Hole Longitude: -111.984431 |
Date | Event |
---|---|
2002-06-06 | Obtained License |
2002-06-11 | Surface Casing Operation Performed |
2002-06-12 | Finished Drilling |
2002-06-12 | Well Log Performed |
2002-06-12 | Well Mode changed to Drilled and Cased |
2002-06-13 | Production Casing Operation Performed |
2002-06-13 | Rig Released |
2002-07-02 | Perforation Treatment Performed - Jet Perforation |
2002-07-02 | Well Log Performed |
2017-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-08-20 | Perforation Treatment Performed - Jet Perforation |
2017-08-20 | Plug Back Performed |
2017-09-13 | Well Began Production |
2017-09-13 | Well Fluid changed to Gas |
2017-09-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-07-02 | Perforation | 688.00 | 689.00 | 13 |
2017-08-20 | Packing Device Capped w/Cement | 672.00 | 680.00 | 0 |
2017-08-20 | Perforation | 621.00 | 622.00 | 17 |
2017-08-20 | Perforation | 579.00 | 582.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2299 | 0.0 | 0.0 | 0.0 |
2018 | 8619 | 0.0 | 0.0 | 0.0 |
2019 | 6801 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-08-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]