X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0875090213002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0875090213002
 
| Well ID: 0875090213002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 56.519673, -115.327058 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 56.519673, -115.327058 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/13-02-087-09W5/2
 
| Location: 00/13-02-087-09W5/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/13-02-087-09 W5/02
 
| Location Alias 2: 00/13-02-087-09 W5/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 
|-
 
|-
| County/Municipality: [[Municipal District of Opportunity No. 17,_Alberta|Municipal District of Opportunity No. 17]]
+
| Township: 087
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 09
 +
|-
 +
| Section: 02
 +
|-
 +
| County/Municipality: [[Loon Lake 235,_Alberta|Loon Lake 235]]
 
|-
 
|-
 
| Well Name: STAR ET AL RED EARTH 13-2-87-9
 
| Well Name: STAR ET AL RED EARTH 13-2-87-9
Line 29: Line 39:
 
| Final Drill Date: 1975-12-31
 
| Final Drill Date: 1975-12-31
 
|-
 
|-
| Well Total Depth: 1476.5 m
+
| Well Total Depth: 1476.50 m
 
|-
 
|-
 
| Surface Hole Latitude: 56.519673
 
| Surface Hole Latitude: 56.519673
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1975-12-16
 +
| Obtained License
 +
|-
 +
| 1975-12-31
 +
| Finished Drilling
 +
|-
 +
| 1975-12-31
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1976-01-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1976-01-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 1976-02-01
 +
| Well Log Performed
 +
|-
 +
| 1978-03-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1978-03-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1991-09-08
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-02-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1993-02-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-02-17
 +
| Plug Back Performed
 +
|-
 +
| 1993-02-17
 +
| Well Log Performed
 +
|-
 +
| 1993-02-18
 +
| Well Log Performed
 +
|-
 +
| 1993-03-01
 +
| Well Began Injection
 +
|-
 +
| 1993-03-01
 +
| Well Fluid changed to Water
 +
|-
 +
| 1993-03-01
 +
| Well Type changed to Disposal
 +
|-
 +
| 2002-08-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-08-09
 +
| Well Log Performed
 +
|-
 +
| 2002-08-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 159:
 
| 1978-03-02
 
| 1978-03-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1456.3
+
| style="text-align: right;" | 1456.30
| style="text-align: right;" | 1461.2
+
| style="text-align: right;" | 1461.20
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1978-03-03
 
| 1978-03-03
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1456.3
+
| style="text-align: right;" | 1456.30
| style="text-align: right;" | 1461.2
+
| style="text-align: right;" | 1461.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991-09-08
 
| 1991-09-08
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1456.3
+
| style="text-align: right;" | 1456.30
| style="text-align: right;" | 1461.2
+
| style="text-align: right;" | 1461.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-02-17
 
| 1993-02-17
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1432
+
| style="text-align: right;" | 1432.00
| style="text-align: right;" | 1440
+
| style="text-align: right;" | 1440.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-02-17
 
| 1993-02-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 737.6
+
| style="text-align: right;" | 737.60
| style="text-align: right;" | 741.9
+
| style="text-align: right;" | 741.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-02-17
 
| 1993-02-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 726
+
| style="text-align: right;" | 726.00
| style="text-align: right;" | 729.1
+
| style="text-align: right;" | 729.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2002-08-09
 
| 2002-08-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 685
+
| style="text-align: right;" | 685.00
| style="text-align: right;" | 687
+
| style="text-align: right;" | 687.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2002-08-10
 
| 2002-08-10
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 685
+
| style="text-align: right;" | 685.00
| style="text-align: right;" | 741.9
+
| style="text-align: right;" | 741.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 124: Line 209:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 159: Line 258:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 45656.1
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1994
 
| 1994
Line 165: Line 264:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 55050.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1995
 
| 1995
Line 171: Line 270:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 62118.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1996
 
| 1996
Line 177: Line 276:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 82887.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1997
 
| 1997
Line 183: Line 282:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 88283.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1998
 
| 1998
Line 189: Line 288:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 113206.1
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1999
 
| 1999
Line 195: Line 294:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 120470.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2000
 
| 2000
Line 201: Line 300:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 155369.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2001
 
| 2001
Line 207: Line 306:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 169433.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2002
 
| 2002
Line 213: Line 312:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 145192.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2003
 
| 2003
Line 219: Line 318:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 141195.5
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2004
 
| 2004
Line 225: Line 324:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 133001.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2005
 
| 2005
Line 231: Line 330:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 170354.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2006
 
| 2006
Line 237: Line 336:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 190455.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2007
 
| 2007
Line 243: Line 342:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 175188.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2008
 
| 2008
Line 249: Line 348:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 185241.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2009
 
| 2009
Line 255: Line 354:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 176911.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2010
 
| 2010
Line 261: Line 360:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 181984.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2011
 
| 2011
Line 267: Line 366:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 196888.1
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2012
 
| 2012
Line 273: Line 372:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 225138.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2013
 
| 2013
Line 279: Line 378:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 206257.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2014
 
| 2014
Line 285: Line 384:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 152094.3
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2015
 
| 2015
Line 291: Line 390:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 122154.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2016
 
| 2016
Line 297: Line 396:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 74246.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2017
 
| 2017
Line 303: Line 402:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 85544.4
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2018
 
| 2018
Line 309: Line 408:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 81698.5
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2019
 
| 2019
Line 315: Line 414:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 16153.7
+
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 321: Line 426:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 336: Line 441:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:20, 17 January 2021

Well Details

Well ID: 0875090213002
Loading map...
Location: 00/13-02-087-09W5/2
Location Alias: 00/13-02-87-09 W5M
Location Alias 2: 00/13-02-087-09 W5/02
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 09
Section: 02
County/Municipality: Loon Lake 235
Well Name: STAR ET AL RED EARTH 13-2-87-9
Operator Name: Harvest Operations Corp.
License Number: 0056249
License Date: 1975-12-16
License Status: Issued
Spud Date: 1975-12-18
Final Drill Date: 1975-12-31
Well Total Depth: 1476.50 m
Surface Hole Latitude: 56.519673
Surface Hole Longitude: -115.327058

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-16 Obtained License
1975-12-31 Finished Drilling
1975-12-31 Well Mode changed to Drilled and Cased
1976-01-02 Drill Stem Test Performed
1976-01-04 Production Casing Operation Performed
1976-02-01 Well Log Performed
1978-03-02 Perforation Treatment Performed - Jet Perforation
1978-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-17 Perforation Treatment Performed - Jet Perforation
1993-02-17 Plug Back Performed
1993-02-17 Well Log Performed
1993-02-18 Well Log Performed
1993-03-01 Well Began Injection
1993-03-01 Well Fluid changed to Water
1993-03-01 Well Type changed to Disposal
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-08-09 Well Log Performed
2002-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-03-02 Perforation 1456.30 1461.20 7
1978-03-03 Acid Treatment 1456.30 1461.20 0
1991-09-08 Acid Treatment 1456.30 1461.20 0
1993-02-17 Packing Device Capped w/Cement 1432.00 1440.00 0
1993-02-17 Perforation 737.60 741.90 13
1993-02-17 Perforation 726.00 729.10 13
2002-08-09 Perforation 685.00 687.00 13
2002-08-10 Acid Treatment 685.00 741.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References