X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0365120211002"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0365120211002
 
| Well ID: 0365120211002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.0661321, -115.6113549 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.065778, -115.611691 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/11-02-036-12W5/2
 +
|-
 +
| Location Alias: 00/11-02-36-12 W5M
 +
|-
 +
| Location Alias 2: 00/11-02-036-12 W5/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 036
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 12
 +
|-
 +
| Section: 02
 +
|-
 +
| County/Municipality: [[Clearwater County,_Alberta|Clearwater County]]
 
|-
 
|-
 
| Well Name: SCARBORO ET AL CUTOFF 11-2-36-12
 
| Well Name: SCARBORO ET AL CUTOFF 11-2-36-12
 
|-
 
|-
| Operator:
+
| Operator Name: [[Enerplus Corporation]]
 +
|-
 +
| License Number: 0096641
 
|-
 
|-
 
| License Date: 1982-07-13
 
| License Date: 1982-07-13
 
|-
 
|-
| Final Drilling Date: 1982-07-24
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1982-07-22
 +
|-
 +
| Final Drill Date: 1982-07-24
 +
|-
 +
| Well Total Depth: 4357.00 m
 +
|-
 +
| Surface Hole Latitude: 52.065778
 +
|-
 +
| Surface Hole Longitude: -115.611691
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1982-07-13
 +
| Obtained License
 +
|-
 +
| 1982-07-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-07-24
 +
| Finished Drilling
 +
|-
 +
| 1982-07-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1982-07-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-07-31
 +
| Perforation Treatment Performed - Condensate Squeeze
 +
|-
 +
| 1982-08-01
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1982-08-09
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1985-06-27
 +
| Well Log Performed
 +
|-
 +
| 1985-06-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-06-28
 +
| Plug Back Performed
 +
|-
 +
| 1985-06-28
 +
| Well Log Performed
 +
|-
 +
| 1985-06-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-07-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-07-12
 +
| Plug Back Performed
 +
|-
 +
| 1985-07-12
 +
| Well Log Performed
 +
|-
 +
| 1985-07-12
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1985-07-13
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1982-07-23
 +
| Perforation
 +
| style="text-align: right;" | 4116.50
 +
| style="text-align: right;" | 4130.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1985-06-28
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 3796.00
 +
| style="text-align: right;" | 3808.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-06-29
 +
| Perforation
 +
| style="text-align: right;" | 3420.20
 +
| style="text-align: right;" | 3424.70
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 4357.0m
+
| 1985-06-29
 +
| Perforation
 +
| style="text-align: right;" | 3426.70
 +
| style="text-align: right;" | 3428.20
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1985-07-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 3350.00
 +
| style="text-align: right;" | 3362.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Abandoned
+
| 1982-07-23
 +
| Perforation
 +
| style="text-align: right;" | 4132.20
 +
| style="text-align: right;" | 4134.20
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Well Type: Not Applicable
+
| 1982-07-23
 +
| Perforation
 +
| style="text-align: right;" | 4135.00
 +
| style="text-align: right;" | 4140.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Configuration: Vertical
+
| 1982-07-23
 +
| Perforation
 +
| style="text-align: right;" | 4142.50
 +
| style="text-align: right;" | 4151.70
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Violations:
+
| 1982-07-23
 +
| Perforation
 +
| style="text-align: right;" | 4154.00
 +
| style="text-align: right;" | 4156.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Latitude: 52.0661321
+
| 1982-07-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 3943.00
 +
| style="text-align: right;" | 3950.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -115.6113549
+
| 1982-07-26
 +
| Perforation
 +
| style="text-align: right;" | 3863.50
 +
| style="text-align: right;" | 3873.50
 +
| style="text-align: right;" | 2
 +
|-
 +
| 1982-07-31
 +
| Condensate Squeeze
 +
| style="text-align: right;" | 3863.50
 +
| style="text-align: right;" | 3873.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1982-08-01
 +
| Fracture
 +
| style="text-align: right;" | 3863.50
 +
| style="text-align: right;" | 3873.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 22:37, 17 January 2021

Well Details

Well ID: 0365120211002
Loading map...
Location: 00/11-02-036-12W5/2
Location Alias: 00/11-02-36-12 W5M
Location Alias 2: 00/11-02-036-12 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 12
Section: 02
County/Municipality: Clearwater County
Well Name: SCARBORO ET AL CUTOFF 11-2-36-12
Operator Name: Enerplus Corporation
License Number: 0096641
License Date: 1982-07-13
License Status: RecCertified
Spud Date: 1982-07-22
Final Drill Date: 1982-07-24
Well Total Depth: 4357.00 m
Surface Hole Latitude: 52.065778
Surface Hole Longitude: -115.611691

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-07-13 Obtained License
1982-07-23 Perforation Treatment Performed - Jet Perforation
1982-07-24 Finished Drilling
1982-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-26 Perforation Treatment Performed - Jet Perforation
1982-07-31 Perforation Treatment Performed - Condensate Squeeze
1982-08-01 Perforation Treatment Performed - Fractured
1982-08-09 Well Mode changed to Drilled and Cased
1985-06-27 Well Log Performed
1985-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-28 Plug Back Performed
1985-06-28 Well Log Performed
1985-06-29 Perforation Treatment Performed - Jet Perforation
1985-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-12 Plug Back Performed
1985-07-12 Well Log Performed
1985-07-12 Well Mode changed to Abandoned
1985-07-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-07-23 Perforation 4116.50 4130.00 7
1985-06-28 Packing Device Capped w/Cement 3796.00 3808.00 0
1985-06-29 Perforation 3420.20 3424.70 13
1985-06-29 Perforation 3426.70 3428.20 13
1985-07-12 Packing Device Capped w/Cement 3350.00 3362.00 0
1982-07-23 Perforation 4132.20 4134.20 7
1982-07-23 Perforation 4135.00 4140.00 7
1982-07-23 Perforation 4142.50 4151.70 7
1982-07-23 Perforation 4154.00 4156.00 7
1982-07-25 Packing Device Capped w/Cement 3943.00 3950.00 0
1982-07-26 Perforation 3863.50 3873.50 2
1982-07-31 Condensate Squeeze 3863.50 3873.50 0
1982-08-01 Fracture 3863.50 3873.50 0

For data sources see[4]



References