X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0904142304190"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0904142304190
 
| Well ID: 0904142304190
| style="height=100%; align=center" rowspan="21" | {{#display_map: 56.807934, -112.11348 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 56.807934, -112.113480 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 19/04-23-090-14W4/0
 
| Location: 19/04-23-090-14W4/0
Line 43: Line 43:
 
| Surface Hole Latitude: 56.807934
 
| Surface Hole Latitude: 56.807934
 
|-
 
|-
| Surface Hole Longitude: -112.11348
+
| Surface Hole Longitude: -112.113480
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 265: Line 265:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 00:50, 18 January 2021

Well Details

Well ID: 0904142304190
Loading map...
Location: 19/04-23-090-14W4/0
Location Alias: 19/04-23-90-14 W4M
Location Alias 2: 19/04-23-090-14 W4/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 4
Range: 14
Section: 23
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: PCC AA07I ELLS 4-23-90-14
Operator Name: PetroChina Canada Ltd.
License Number: 0491409
License Date: 2018-10-11
License Status: Amended
Spud Date: 2019-05-08
Final Drill Date: 2019-06-03
Well Total Depth: 1377.00 m
Surface Hole Latitude: 56.807934
Surface Hole Longitude: -112.113480

For data sources see[1][2]

Well History

Date Event
2018-10-11 Obtained License
2019-05-08 Direction Drilling Operation Performed - Deviate
2019-05-08 Drill To LD
2019-05-10 Surface Casing Operation Performed
2019-05-17 Direction Drilling Operation Performed - Horizontal
2019-05-17 Well Log Performed
2019-05-18 Intermediate Casing Operation Performed
2019-05-24 Well Log Performed
2019-06-03 Finished Drilling
2019-06-03 Well Log Performed
2019-06-03 Well Mode changed to Drilled and Cased
2019-06-04 Liner Casing Operation Performed
2019-06-04 Perforation Treatment Performed - Slotted Liner or Casing
2019-06-04 Rig Released
2019-12-01 Well Began Injection
2019-12-01 Well Fluid changed to Steam
2019-12-01 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-05-08 Precision Drilling Corporation 140 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-05-08 0.00 Deviate (5 - 79 degrees)
2019-05-17 386.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-06-04 Slotted Liner 516.00 1367.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References