X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0374070211002"

m
m
 
Line 486: Line 486:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 00:15, 18 January 2021

Well Details

Well ID: 0374070211002
Loading map...
Location: 00/11-02-037-07W4/2
Location Alias: 00/11-02-37-07 W4M
Location Alias 2: 00/11-02-037-07 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 02
County/Municipality: Special Areas No. 4
Well Name: CLEO ENERGY PROVOST 6-2-37-7
Operator Name: Cleo Energy Corp.
License Number: 0123317
License Date: 1986-06-17
License Status: Amended
Spud Date: 1986-06-18
Final Drill Date: 1986-06-28
Well Total Depth: 1138.90 m
Surface Hole Latitude: 52.147408
Surface Hole Longitude: -110.902188

For data sources see[1][2]

Well History

Date Event
1986-06-17 Obtained License
1986-06-19 Surface Casing Operation Performed
1986-06-24 Direction Drilling Operation Performed - Deviate
1986-06-28 Finished Drilling
1986-06-28 Well Log Performed
1986-06-28 Well Mode changed to Drilled and Cased
1986-06-29 Production Casing Operation Performed
1986-06-29 Rig Released
1986-07-02 Well Log Performed
1986-07-03 Well Log Performed
1986-07-04 Perforation Treatment Performed - Jet Perforation
1986-07-05 Well Began Production
1986-07-05 Well Fluid changed to Crude Oil
1986-07-05 Well Mode changed to Pumping
1986-07-06 Perforation Treatment Performed - Jet Perforation
1993-10-25 Well Log Performed
1993-11-20 Perforation Treatment Performed - Cement Squeeze
1993-11-20 Plug Back Performed
1993-11-23 Well Log Performed
1993-11-24 Perforation Treatment Performed - Jet Perforation
1993-12-03 Perforation Treatment Performed - Fractured
1993-12-23 Perforation Treatment Performed - Fractured
1994-01-01 Well Began Injection
1994-01-01 Well Fluid changed to Water
1994-01-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1986-06-24 195.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-07-04 Perforation 1081.00 1083.00 13
1986-07-06 Perforation 1086.00 1088.00 13
1993-11-20 Cement Squeeze 1081.00 1088.00 0
1993-11-24 Perforation 1097.00 1100.00 13
1993-12-03 Fracture 1097.00 1100.00 0
1993-12-23 Fracture 1097.00 1100.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 3478 0.0 0.0 0.0
1987 7028 0.0 0.0 0.0
1988 6842 0.0 0.0 0.0
1989 6007 0.0 0.0 0.0
1990 8341 0.0 0.0 0.0
1991 6405 0.0 0.0 0.0
1992 2 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References